Change the shape of the raw material FAI

Elsmar Forum Sponsor

Jim Wynne

Staff member
Admin
#2
Are you referring to bar stock and the profile changes from round to square? I'm not an AS9100 expert, but I would think that if the customer material specifications and supplier aren't affected, there should be no problem. When in doubt, ask the customer.
 

Jim Wynne

Staff member
Admin
#4
Yes, i'm talking about the shape of ther bar, and yes for these two are the same specification, the only difference is the form
You also have to consider whether the processing is changing due the form of the material. Like I said, if you're not sure, ask the customer.
 

John Predmore

Trusted Information Resource
#5
I remember one case in a company I worked at, where a Asian supplier could not source hex bar stock in a fractional size in inches outside the US. They proposed to machine the hex shaft from round stock, starting with a 20% larger diameter. They submitted a First Article Inspection for machined-from-round that met every dimension on our part drawing. The US-based customer had a lengthy debate on whether to accept the FAI. I should explain, the design drawing called for the shaft to be made from a nominal-size Hex Bar stock, and therefore the final part drawing did not have dimensions for the sides of the hexagon or surface finish callout or a tolerance on the angles (these are defined in industry specifications for hex bar stock). I remember we also debated whether the outer surface of the finished shaft would be too soft in the product application, if the work-hardened drawn surface was removed in machining. As I recall, additional wear and strength testing of the machined-from-round shaft was done and tolerances were added to the shaft drawing, before the part was sourced with the Asian supplier. The moral of the story, a change in process plan can introduce risk, not limited to the dimensions on the part drawing.
 
Thread starter Similar threads Forum Replies Date
D Reports under change management | ISO 13485:2016 & ISO 9001:2015 ISO 13485:2016 - Medical Device Quality Management Systems 3
Q Time change via change of Time Zone Qualification and Validation (including 21 CFR Part 11) 3
T IEC 60601-1-8:2020 Is it necessary to change the alarm melody? IEC 60601 - Medical Electrical Equipment Safety Standards Series 1
M Change in Constitution / Ownership of firm -------ISO 13485 ISO 13485:2016 - Medical Device Quality Management Systems 1
U Power supply - Change From 160 to 300 Watts - Significant change? EU Medical Device Regulations 2
N Sterilization Protocol Change in Validation Process and further impacts ISO 13485:2016 - Medical Device Quality Management Systems 1
M Label change - 510(k) Medical Device and FDA Regulations and Standards News 5
M EMS change management ISO 14001:2015 Specific Discussions 2
E Document Change Request forms (or no forms)? ISO 13485:2016 - Medical Device Quality Management Systems 9
J Significant change related to design and intended use EU Medical Device Regulations 3
J Need Change Control Yes/No Decision Tree Template ISO 9000, ISO 9001, and ISO 9004 Quality Management Systems Standards 1
S Cleaning process center change ISO 13485:2016 - Medical Device Quality Management Systems 4
U NOC - What is considered a "design change" EU Medical Device Regulations 5
qualprod What do CB´s change when doing a partial moving ? ISO 9000, ISO 9001, and ISO 9004 Quality Management Systems Standards 1
Y Algo change significancy Medical Information Technology, Medical Software and Health Informatics 3
Revision36 Engineering Change Order Industry Standards Other Medical Device and Orthopedic Related Topics 4
Z Iterative development and FDA change requests IEC 62304 - Medical Device Software Life Cycle Processes 12
D ECO (Engineering Change Order) process questions ISO 13485:2016 - Medical Device Quality Management Systems 7
R Medical Device - Change manufacturing plant Design and Development of Products and Processes 6
Tagin Template or Checklist for Process Change Document Control Systems, Procedures, Forms and Templates 5
R Do we need issue ECN (Engineering Change Notice) towards updated Material Specification? Design and Development of Products and Processes 2
A What does this line from MDCG 2020-3 (MDR art. 120 substantial change) mean to you? EU Medical Device Regulations 4
M Change management procedure when 7.3 is not applicable ISO 13485:2016 - Medical Device Quality Management Systems 5
D Change Approval Requirements - Does every change need formal customer approval? Design and Development of Products and Processes 17
D Engineering Change Order (ECO) metrics to track ISO 13485:2016 - Medical Device Quality Management Systems 6
P Notified Body Approval of Change EU Medical Device Regulations 2
F Change to Formulation due to Reach (China Medical Device Regulations) China Medical Device Regulations 0
E Change in control plan - Do I have to do sampling? IATF 16949 - Automotive Quality Systems Standard 1
S Forced ServiceNow validation - No change in our current user and functional requirements IT (Information Technology) Service Management 6
M Address change for a company with CE/ISO13485 EU Medical Device Regulations 2
G Need to change KPI we called NC parts (maximum 3%.) to FTQ (first time quality) IATF 16949 - Automotive Quality Systems Standard 4
J FDA notification of address change US Food and Drug Administration (FDA) 2
D Class 3 Device - Change of supplier of material Canada Medical Device Regulations 6
D List A IVD - Change to material supplier EU Medical Device Regulations 3
R Change Management vs Opportunity for Improvement ISO 9000, ISO 9001, and ISO 9004 Quality Management Systems Standards 3
M Is There a Revision History or Change Log for Canadian Regulations? Canada Medical Device Regulations 3
C Brazil - Product Code (and brand) Change Other Medical Device Regulations World-Wide 1
S Requirement to Conduct New Shelf-life Testing? (re-do testing for design change) EU Medical Device Regulations 3
dgrainger Informational EU medical device website change from 'Growth' to 'Health and Food Safety' (6/2020) Medical Device and FDA Regulations and Standards News 0
J Sub-supplier change from manual to automated process - same specs - Report to FDA? 21 CFR Part 820 - US FDA Quality System Regulations (QSR) 2
S Special 510(K) - Labeling change from Rx to OTC Other US Medical Device Regulations 11
A Document Change Notice vs complete System re-write Manufacturing and Related Processes 4
S MDR Delay - MDD design Change? (before new MDR DOA) EU Medical Device Regulations 8
Jane's Like-for-like critical raw material change qualification - type of testing/ number of lots required ISO 13485:2016 - Medical Device Quality Management Systems 4
R Change Notification - Registrar vs Notified body ISO 13485:2016 - Medical Device Quality Management Systems 1
Marc Insects and Climate Change - 2020 World News 0
A UDI and Design Controls - Labeling change via the Design Control process 21 CFR Part 820 - US FDA Quality System Regulations (QSR) 1
Q Company Ownership Change ISO 9000, ISO 9001, and ISO 9004 Quality Management Systems Standards 13
Q Legal Manufacturing Address Change – multiple registrations at same address 21 CFR Part 820 - US FDA Quality System Regulations (QSR) 2
I Is highlighting on a printed document considered a change? ISO 9000, ISO 9001, and ISO 9004 Quality Management Systems Standards 4

Similar threads

Top Bottom