Change to the manufacturing Date for a device in the field

#1
HI,

My company sells upgrades to their devices on the field. Basically you can change a part from the product and you have a different medical device and we apply new labels to it and a new UDI-DI as well. My question is what to do about the manufacturing date in this scenario. Do you use the manufacturing date of the old product since almost all the parts are from the all product or do you assign a new manufacturing date to the upgraded product?

Thanks!
 
Elsmar Forum Sponsor
Thread starter Similar threads Forum Replies Date
R Medical Device - Change manufacturing plant Design and Development of Products and Processes 6
Q Legal Manufacturing Address Change – multiple registrations at same address 21 CFR Part 820 - US FDA Quality System Regulations (QSR) 3
N China - Start manufacturing before change approval? China Medical Device Regulations 3
B Manufacturing Company Address Change - implications for FDA Other US Medical Device Regulations 1
M FDA News USFDA Final Guidance – Manufacturing Site Change Supplements: Content and Submission Medical Device and FDA Regulations and Standards News 1
Ajit Basrur FDA News FDA Guidance Document: Manufacturing Site Change Supplement US Food and Drug Administration (FDA) 0
S Change notice while switching to injection molding technique for manufacturing EU Medical Device Regulations 1
E Change of Manufacturing Location EU Medical Device Regulations 6
N Is a new 510K required for change of manufacturing location for an existing device? US Food and Drug Administration (FDA) 1
H FDA/PMA/Medical Device/Before submission/Manufacturing facility change US Food and Drug Administration (FDA) 1
M Change in Manufacturing, Assembly and Testing Location to a Sub-Contractor 21 CFR Part 820 - US FDA Quality System Regulations (QSR) 6
J How to change the Manufacturing Site to another Contract Manufacturer Japan Medical Device Regulations 1
S Medical Devices - Change of Manufacturing Location US Food and Drug Administration (FDA) 5
V Product Evaluation Requirements for Change in Manufacturing Facility/Change in Design 21 CFR Part 820 - US FDA Quality System Regulations (QSR) 12
T Initiating Cultural Change in a Small Manufacturing Company Quality Manager and Management Related Issues 4
D AS9100 Scope Change to Include Manufacturing Services AS9100, IAQG, NADCAP and Aerospace related Standards and Requirements 5
A Temporary Change of Manufacturing Site - Notified Body Notification Requirements EU Medical Device Regulations 3
K Need help with AS9100 Scope Change to include Manufacturing Process Maps, Process Mapping and Turtle Diagrams 1
R Change in Direction - Management decides to Outsource Manufacturing Operations ISO 9000, ISO 9001, and ISO 9004 Quality Management Systems Standards 8
R PMA (Parts Manufacturing Approval) Supplement - Labeling Software Change 21 CFR Part 820 - US FDA Quality System Regulations (QSR) 2
A Concession/ Deviation for change in manufacturing process IATF 16949 - Automotive Quality Systems Standard 1
K 8.2.3.1 Monitoring and measurement of manufacturing processes - Tool change IATF 16949 - Automotive Quality Systems Standard 5
A Lean Manufacturing - How do I change my company's Culture? Lean in Manufacturing and Service Industries 26
JoCam Change of Legal Manufacturer EU Medical Device Regulations 0
Sidney Vianna Informational ISO/TS 10020:2022 Quality management systems — Organizational change management — Processes Other ISO and International Standards and European Regulations 0
0 Complaints time series significant change Customer Complaints 41
N Malaysia Shelf Life Change Other Medical Device Regulations World-Wide 2
P Self Certified Class 1 MDR 2017/745 Design Change CE Marking (Conformité Européene) / CB Scheme 2
O Article 120 - significant change interpretation EU Medical Device Regulations 4
V Would the customer drawing change necessitate re-PPAP of the Product? APQP and PPAP 3
S Do we have to create a new PPAP to our customer if our Sub Contractor had to change? APQP and PPAP 10
M PMA submission change Medical Device and FDA Regulations and Standards News 0
F Change in address for critical supplier - does NB need to be informed? CE Marking (Conformité Européene) / CB Scheme 20
K Change in address on ERLM US FDA: Implications to import US Medical Device Regulations 0
N Change our Registrar? Pros and Cons ? Registrars and Notified Bodies 8
F Using non-randomized clinical study for change in existing 510(k) device? US Food and Drug Administration (FDA) 1
FuzzyD ISO 13485 change in process ISO 13485:2016 - Medical Device Quality Management Systems 3
R IVD Label Change China Medical Device Regulations 1
Judy Abbott Change of PVC stabilizer Japan Medical Device Regulations 6
R IVD Label Change Requirements Other Medical Device Regulations World-Wide 0
M EE's - Laptops/Printer Change and Emissions Testing IEC 60601 - Medical Electrical Equipment Safety Standards Series 6
D Document Change Approval ISO 13485:2016 - Medical Device Quality Management Systems 6
mtmt70a Change\ my MTBF Prediction SW Tool from the RELEX tool with yearly Lic. access Telecordia database to another solution. Recommendations? Reliability Analysis - Predictions, Testing and Standards 0
S Can a product option change the product class? CE Marking (Conformité Européene) / CB Scheme 2
M Regulatory Change assessment US Food and Drug Administration (FDA) 3
G Software change management Design and Development of Products and Processes 3
J Changes to OS - Significant change under MDR EU Medical Device Regulations 8
A If document coding is change will there be a revision Document Control Systems, Procedures, Forms and Templates 1
G Change Control for Test Samples Inspection, Prints (Drawings), Testing, Sampling and Related Topics 3
Z Change color or shape of individual data point in control chart Using Minitab Software 6

Similar threads

Top Bottom