Changes to Control Plans or PFMEA's (Process FMEA)

5

5litre

#1
Is it necesaary for Document Control to keep a record of updates to Control Plans or PFMEA's, or just necessary to up the revision level (date) and issue the new one?

The standard states that you must control documents, but this would be data within the document.

I have not been keeping a Change Record for each part number that gets revised, is this an N/C?
 
Elsmar Forum Sponsor

Stijloor

Leader
Super Moderator
#2
Re: Changes to CP or PFMEA's

Is it necesaary for Document Control to keep a record of updates to Control Plans or PFMEA's, or just necessary to up the revision level (date) and issue the new one?

The standard states that you must control documents, but this would be data within the document.

I have not been keeping a Change Record for each part number that gets revised, is this an N/C?
This may help:

The AIAG PPAP Manual, Section 6, Page 21 states:

<snip> The organization shall ensure that the appropriate PPAP records from a superseded part PPAP file are included, or referenced in the new part PPAP file.
Stijloor.
 
5

5litre

#3
Re: Changes to CP or PFMEA's

My question would be for rev. changes to a specific part number, not really for a superseded number. We do keep a Document Change Log for changes to documents we use that get revised from time to time.

Thanks
 

bpritts

Involved - Posts
#4
Re: Changes to CP or PFMEA's

I have included control plans in the scope of document control in all of my clients' systems. I suppose you could argue that the changes to the content represent changes to data rather than a document, but data changes must be controlled, too.

Remember the goals of document control and decide for yourself. Documents and/or data which are relied on for product design, manufacturing, inspection or service must be controlled, to ensure that changes are made in an authorized manner, and current information available to all who need it.

Possibly you could use the signatures and dates on the form as evidence of approval, but as noted above you'll also need to ensure that records of implementation and change must be kept, too.

Best regards............Brad
 
A

ARTEMIS

#5
I agree,

If you make any changes to an document that affect the way you perform a tasks in the course of your business that change needs to be controlled.
 

jerry_Malaysia

Quite Involved in Discussions
#6
In the place that I work, we control the changes of control plan and FMEA according to document control procedure. We have recorded what are the reason for each change, and attach supporting documents example validation, testing and trial result etc. This is because we need to keep track on why we made the changes and how we made the changes. We may use FMEA as benchmark for similar product development in future, therefore, we would like to have as much information as possible.
 

jkuil

Quite Involved in Discussions
#7
Critical is the document change control of any specification
  • specification of the product
  • specification of how it is being manufactured
  • specification of the controls and inspections that ensure product quality
A change record should specify the changes and how they are controlled: the validation of the change and the impact on the risk assessment. It may be necessary to update FMEA's and control plans due to the change. Your change control form should assess and record this need.
 
Thread starter Similar threads Forum Replies Date
P Product Requirements Control during Design Changes Design and Development of Products and Processes 4
B Clarification of ISO 9001:2015 Clause 8.5.6 Control of Changes ISO 9000, ISO 9001, and ISO 9004 Quality Management Systems Standards 11
L ISO 13485 Document Control - Document Changes - Needing Suggestions ISO 13485:2016 - Medical Device Quality Management Systems 1
R Recording Control Plan Changes Document Control Systems, Procedures, Forms and Templates 3
D PFMEA and Control Plan Core Team Changes FMEA and Control Plans 4
S Customer Provide Control Procedure & Changes of Products and QMS Control Procedure ISO 13485:2016 - Medical Device Quality Management Systems 5
M Changes Assessment as per AS9100 Clause 7.5.1.2 Control of Production Process Changes AS9100, IAQG, NADCAP and Aerospace related Standards and Requirements 5
J New Procedure - Changes in measurement devices listed on the Control Plan FMEA and Control Plans 1
K 7.3.7 Control of Design & Development Changes AS9100, IAQG, NADCAP and Aerospace related Standards and Requirements 2
A Design/Change Control Procedure - How to cope with Changes during Development? 21 CFR Part 820 - US FDA Quality System Regulations (QSR) 26
2 Minor Document Change Control - Minor text changes to work procedures Document Control Systems, Procedures, Forms and Templates 9
V Do we need to enclose Draft version of Proposed Changes in Change Control US Food and Drug Administration (FDA) 8
S Control of Documents - Showing Document Changes Document Control Systems, Procedures, Forms and Templates 12
M Change Control - How low do you go before making official changes? Document Control Systems, Procedures, Forms and Templates 8
C Monitoring changes in ANSI standards - Control of External Documents Document Control Systems, Procedures, Forms and Templates 6
S Customer Part Number Changes - Control Plan Question FMEA and Control Plans 1
B Customer Required Control of Changes (Man, Machine, Method) IATF 16949 - Automotive Quality Systems Standard 10
R Change Control Required? Changes during the product gamma phase IATF 16949 - Automotive Quality Systems Standard 3
T Changes to document control procedure - need review Document Control Systems, Procedures, Forms and Templates 4
R Control of Documents - Change history question - Changes from previous revision OK? Document Control Systems, Procedures, Forms and Templates 11
J Software change control - How should I be controlling software changes? ISO 9000, ISO 9001, and ISO 9004 Quality Management Systems Standards 6
J Can We Exclude ISO9000:2000 Clause 7.3.7 (Control Of Design And Development Changes)? Design and Development of Products and Processes 7
W 7.3.7 Control of Design & Dev. Changes Design and Development of Products and Processes 5
F Document Control - Informing People of Document Changes Document Control Systems, Procedures, Forms and Templates 37
J Process Control / Changes QS-9000 - American Automotive Manufacturers Standard 13
Sidney Vianna IAQG News IAQG 9401-1:2022 Changes & Organization Certification Analysis Process - OCAP Demo AS9100, IAQG, NADCAP and Aerospace related Standards and Requirements 0
T Changes to product IFU & Summative Testing IEC 62366 - Medical Device Usability Engineering 1
T Changes to Controlled Documents AS9100, IAQG, NADCAP and Aerospace related Standards and Requirements 5
Q Changes to AS9102 AS9100, IAQG, NADCAP and Aerospace related Standards and Requirements 4
G Non-significant changes EU Medical Device Regulations 3
Z How to keep up with changes on applicable technical standards (EU MDR)? EU Medical Device Regulations 6
S Turkey- SUT match- GTIN changes caused re-registration Other Medical Device Regulations World-Wide 0
O IATF 16949 News Upcoming Changes to IATF 16949? IATF 16949 - Automotive Quality Systems Standard 4
L ISO 20417 crucial changes Other Medical Device Related Standards 1
Ed Panek 60601-1-11 Changes IEC 60601 - Medical Electrical Equipment Safety Standards Series 5
J Document Changes that don't have to be approved Document Control Systems, Procedures, Forms and Templates 11
M Are we getting scammed by our Notified Body? They are asking to review all changes to determine if they are Significant CE Marking (Conformité Européene) / CB Scheme 4
S What types of changes need to be notified to NBs? Registrars and Notified Bodies 1
Sidney Vianna Informational Changes to Terms and Definitions in ISO/TC 176 Standards since ISO 9000:2015 was issued. ISO 9000, ISO 9001, and ISO 9004 Quality Management Systems Standards 10
Moncia Changes to procedure communication ISO 9000, ISO 9001, and ISO 9004 Quality Management Systems Standards 7
J Changes to OS - Significant change under MDR EU Medical Device Regulations 8
G Significant changes on MDD devices/Old Devices after MDR transitional period EU Medical Device Regulations 2
A Changes in ETSI EN 301-48-17 v3.2.4 2020 Other Medical Device Related Standards 2
J Managing design verification regression testing of design changes Design and Development of Products and Processes 1
D License annual renewal - What changes to report to HC? Canada Medical Device Regulations 1
R What are the new changes in EN ISO 11137-1:2015+A2:2019? Other Medical Device Related Standards 2
A Making changes to IDE device Other US Medical Device Regulations 7
M MD Class I transition period MDD to MDR - changes? EU Medical Device Regulations 1
S IATF 16949 - Summary at a glance Clause wise - changes from ISO TS IATF 16949 - Automotive Quality Systems Standard 4
M Handling design changes with use-as-is inventory disposition Quality Manager and Management Related Issues 6

Similar threads

Top Bottom