Re: Chrysler CSR November 2007
Hello ssaass,
The requirement for self-assessment is included in post #2 in this thread. I have not been able to personally compare the attachments with the ones posted on the Chrysler website because I do not have access through Covisint.
I am sure that others who have access to the site will respond.
Stijloor.
Allright - I give up. Here is Chrysler's "Elements of Manufacturing Basics" presentation (no rev date). As you will see, it has NOTHING to do with auditing PFMEAs or Control Plans. If you re-read the Chrysler CSR excerpt in Post #2, it is asking for a self-assessment (FORMAT NOT DEFINED) of the QUALITY MANAGEMENT SYSTEM, as part of the INTERNAL AUDIT PROCESS.
I don't know why a current TS-16949 certificate is no longer enough. Most of the metrics included in the presentation are supposed to be reviewed in Management Review, which is already part of the internal audit program. The Chrysler requirement is effective in Jan 2008, so our internal audit co-ordinator will be developing a plan to deal with this. It's possible, I suppose, that all Chrysler is expecting is a summary of the internal audit program.
B.G. Wiehle