Good day CATERAF,
As my colleagues here have pointed out, there is no clear requirement for planned maintenance. The standard is asking for your system to have control.
So the handling of your infrastructure depends on your needs. If you have a clean room, you will probably have a HEPA filtration system to monitor for accurate performance as well as maintain for uninterrupted performance. If you have temperature/humidity needs for a laboratory, your infrastructure needs for that will probably also include some monitoring as well as maintenance to help make sure the controlled conditions are uninterrupted for production. Pneumatic and chill water systems might be needed to serve your production equipment, so you might need to maintain that if you want to control down time.
That's what it's generally about, you see. Meeting your goals, whether they be production or process control. Figure out what you need to do that, and get it done. The list of what to do PMs on, the type of work to do and when is not a record (it's a plan or tool), but evidence of completion would be.
As my colleagues here have pointed out, there is no clear requirement for planned maintenance. The standard is asking for your system to have control.
So the handling of your infrastructure depends on your needs. If you have a clean room, you will probably have a HEPA filtration system to monitor for accurate performance as well as maintain for uninterrupted performance. If you have temperature/humidity needs for a laboratory, your infrastructure needs for that will probably also include some monitoring as well as maintenance to help make sure the controlled conditions are uninterrupted for production. Pneumatic and chill water systems might be needed to serve your production equipment, so you might need to maintain that if you want to control down time.
That's what it's generally about, you see. Meeting your goals, whether they be production or process control. Figure out what you need to do that, and get it done. The list of what to do PMs on, the type of work to do and when is not a record (it's a plan or tool), but evidence of completion would be.


