Clause 7.3 - Verification and validation of the sub assemblies and the final product?

E

el_stopo

#1
We are trying to implement section 7.3 and I have a question on the following.

We have several sub assemblies which make up the final product. If we where to have our verification and validation at the completion of the sub assemblies and when the final product is finished would that be enough? Should there be more? If so then where?


Thanks in advance,

Matt
 
Elsmar Forum Sponsor

howste

Thaumaturge
Super Moderator
#2
el_stopo said:
...would that be enough? Should there be more? If so then where?
Maybe, maybe, and I don't know. :confused:

I don't think those questions can be answered without knowing what the product is, what is critical, what processes are involved, etc. Do the verification and validation where it makes sense to do it. As long as you have verified and validated the input requirements, it doesn't matter when they get done.
 
#3
el_stopo said:
We have several sub assemblies which make up the final product. If we where to have our verification and validation at the completion of the sub assemblies and when the final product is finished would that be enough? Should there be more? If so then where?
Hi Matt, and welcome to the Cove :bigwave:

First of all, I'm moving this thread to the ISO 900X forum (assuming we're talking about ISO9001:2000, clause 7.3). I think we'll get more posts that way.

Concening your question, I agree with Howste: It depends on your operation, and as long as it gets done it doesn't really matter where and when as far as the standard is concerned. I (Of course, the old saying "the sooner the better" applies).

There is one thing i wonder about, though: Are we talking about 7.3.1b here?

During the design and development planning, the organization shall determine...

b) the review, verification and validation that are appropriate to each design and development stage...) That would lead on to 7.3.5 and 7.3.6.

From your description (sub assemblies and when the final product is finished) it sounds a bit like 7.5.2, 8.2.3 and 8.2.4...?

/Claes
 
E

el_stopo

#5
First off Thanks for the welcome all.

Claes,
Yes, I am refering to 7.3.1b of 9001:2000. And thanks for the move:)
I was thinking of having verifications and validations done at the completion of each of the newly designed sub-assemblies and at the end of the D&D process when the product is final assembled. Was not sure if this would be enough.



gpainter said:
el, what do you and your customers require?
gpainter,

As far as requirements go, we have been working to MIL-I-45208A which has few controls for design. The main problem is our Chief Engineer is also the president and he is trying to exclude himself (Engineering) from ISO system. Now, this would be great if there were no problems with the design aspect but, right now its a constant battle for Quality and Production to recieve correct documentation and we have a hard time delivering sound working prototypes to the customer. Anyway, I want to make sure I am being thorough enough but, at the same time I dont want it to be rejected from the design department.

As you can see, it is a very troublesome situation. Please help:)




Thanks again,

Signed Me
 
M

mshell

#6
el stopo,

We have subassembly as well and we verify/validate at each stage so that we can make sure our internal customers are getting what they need to carry out the remainder of the processes. This method also helps us to identify nonconformances prior to completion of the job (just in case we need to manufacture replacement parts). I hope this helps

mshell
 
Thread starter Similar threads Forum Replies Date
P What is Validation, Verification and Improvement of FSMS in ISO 22000 Clause 8? Food Safety - ISO 22000, HACCP (21 CFR 120) 2
Randy Clause 7.3 Design and Development - Verification and Validation Design and Development of Products and Processes 3
B Design - Simple System - ISO 9001 Clause 7.3 - Review vs. Verification vs. Validation Design and Development of Products and Processes 12
W AS9100 Clause 8.5.1.3 Production Run Verification AS9100, IAQG, NADCAP and Aerospace related Standards and Requirements 14
P Setup Verification in IATF 16949 Clause 8.5.1.3 IATF 16949 - Automotive Quality Systems Standard 6
P IATF 16949 Clause 8.5.1.4 - Verification after Shutdown IATF 16949 - Automotive Quality Systems Standard 12
Q Inquire TS 16949 standard - Clause 7.5.1.3 Verification of 'Job Set-Up' IATF 16949 - Automotive Quality Systems Standard 7
R Verification of Process Changes (AS9100 clause 7.5.1.2) AS9100, IAQG, NADCAP and Aerospace related Standards and Requirements 2
G AS9100 Clause 7.5.1.1 Production Process Verification Requirements AS9100, IAQG, NADCAP and Aerospace related Standards and Requirements 7
Q ISO 9001 Clause 8.3 Rework Verification - Re-verification to demonstrate conformity ISO 9000, ISO 9001, and ISO 9004 Quality Management Systems Standards 6
J AS9100 Clause 7.4.3 Verification of Purchased Product - OEM C of C required? AS9100, IAQG, NADCAP and Aerospace related Standards and Requirements 6
W ISO9001 Clause 7.4.3 - Verification of Purchased Product - Software ISO 9000, ISO 9001, and ISO 9004 Quality Management Systems Standards 14
J Production Process Verification - AS9100 Clause 7.5.1.1 AS9100, IAQG, NADCAP and Aerospace related Standards and Requirements 9
R TS 16949 Clause 7.5.1.3 - Statistical Methods of Verification of Job Set-ups IATF 16949 - Automotive Quality Systems Standard 6
K Calibration and Verification Records - TS 16949 Clause 7.6.2 General Measurement Device and Calibration Topics 8
L Customer Verification at Supplier?s Premises - ISO TS 16949 Clause 7.4.3 IATF 16949 - Automotive Quality Systems Standard 2
K Verification of Purchased Product - Help Understanding Clause 7.4.3 ISO 9000, ISO 9001, and ISO 9004 Quality Management Systems Standards 2
T Meeting AS9100 Clause 7.4.3 e) Delegation of Verification requirements AS9100, IAQG, NADCAP and Aerospace related Standards and Requirements 18
J AS9100 Clause 7.4.3 Verification of Purchased Product (audit Finding) AS9100, IAQG, NADCAP and Aerospace related Standards and Requirements 30
C Verification at the supplier's premises - ISO 9001:2000 Clause 7.4.3 Supplier Quality Assurance and other Supplier Issues 4
S TS 16949 Clause 7.6.2 Calibration Verification Records Records and Data - Quality, Legal and Other Evidence 7
R Verification of Calibration Results - ISO 9001 Clause 7.6 General Measurement Device and Calibration Topics 2
S ISO 9001 Clause 8.2.3 - Review of the requirements for products and services in a Cafe ISO 9000, ISO 9001, and ISO 9004 Quality Management Systems Standards 8
C ISO/IEC 17021-1 clause 7.1.2 - Determination of competence criteria Document Control Systems, Procedures, Forms and Templates 2
S API Spec. Q1 clause 5.6.1.2 On site evaluation Oil and Gas Industry Standards and Regulations 2
K ISO 13485 clause 8.5.2 'Any necessary CA shall be taken without undue delay' ISO 13485:2016 - Medical Device Quality Management Systems 11
L How to understand the clause 6 Planning of ISO 9001:2015 ISO 9000, ISO 9001, and ISO 9004 Quality Management Systems Standards 11
L How to understand the term 3.1.21 'Servicing' and the clause 5.7.1.2 'Servicing' of API Spec Q1? Oil and Gas Industry Standards and Regulations 16
earl62 IATF 16949 Clause 9.1.1.1 - What is the batch conformance to specification method? IATF 16949 - Automotive Quality Systems Standard 3
D Layered Process Audits - FCA 9.2.2 - Exemption Clause? IATF 16949 - Automotive Quality Systems Standard 5
T Single Fault Condition IEC 60601 Clause 8.7.1 shorting Cr/Cl in Patient Applied Part IEC 60601 - Medical Electrical Equipment Safety Standards Series 7
J Scope of ISO 9001 clause 10.2 in the product life cycle ISO 9000, ISO 9001, and ISO 9004 Quality Management Systems Standards 2
E PEMS Hazards - IEC 60601 Clause 14.6 - Internal data use - Pressure sensor IEC 60601 - Medical Electrical Equipment Safety Standards Series 3
S MDR GSPR Clause 17 - Software Requirements EU Medical Device Regulations 2
B IEC 60601-2-43 - Clause 203.6.103 - Physical button? IEC 60601 - Medical Electrical Equipment Safety Standards Series 1
K Contamination Control - Class Is medical devices (Clause 6.4.2 ISO 13485:2016 (E)) ISO 13485:2016 - Medical Device Quality Management Systems 12
R Clause 7.7 Replicate, Recalibration and Intermediate checks using Artifact ISO 17025 related Discussions 1
A ISO 13485 - Clause 8.3.3 appropriate actions in response to nonconforming product ISO 13485:2016 - Medical Device Quality Management Systems 2
M Description of the requirements of clause 9.2.2.3 manufacturing process audit- needs your feedback IATF 16949 - Automotive Quality Systems Standard 0
A ISO 41001:2018 - Clause No.8 Operations Part Quality Management System (QMS) Manuals 2
L AS5553 Clause 3.1.7 e "Control packaging material ..................reused" AS9100, IAQG, NADCAP and Aerospace related Standards and Requirements 0
R What is meant by Use of COMPONENTS WITH HIGH-INTEGRITY CHARACTERISTICS in ME EQUIPMENT (clause no 4.9) IEC 60601 - Medical Electrical Equipment Safety Standards Series 3
K What is mean by Oxygen Rich Environment as per the IEC 60601-1 clause no 11.2.2 IEC 60601 - Medical Electrical Equipment Safety Standards Series 5
P Definition of production tooling in IATF16949 clause 8.5.1.6 IATF 16949 - Automotive Quality Systems Standard 4
K ISO 13485:2016, Clause 4.2.3 Medical Device File ISO 13485:2016 - Medical Device Quality Management Systems 4
I Master Document Access - ISO 9001:2015 clause 7.5.3 Document Control Systems, Procedures, Forms and Templates 5
qualprod Why new clause (7.1.6) in ISO 9001:2015? ISO 9000, ISO 9001, and ISO 9004 Quality Management Systems Standards 11
B Clause 5.1.12 of Technical Standard IEC 62304/A1 IEC 62304 - Medical Device Software Life Cycle Processes 5
F ISO 13485 8.2.3 Reporting to regulatory authorities: Question regarding a procedure for this clause. ISO 13485:2016 - Medical Device Quality Management Systems 4
R Process control documents - Context of API Spec Q1, Clause 5.7.1.3 Other ISO and International Standards and European Regulations 0

Similar threads

Top Bottom