J

joebrown

#1
Hi ,

I have question. The company I work for raise concessions which can last up to a 1 years, in some cases even longer.

The reason for this is due to the system we use called Pegasus. This system stores our Bill of Materials (BOMs). When we find that we need to change a single component in a BOM we have to open each BOM save it to our system and make the change, then save it back to Pegasus. In Some cases the change could affect between 1 to 50 BOMs. Due to work loads they have thought of a way to get around this by raising a concession untill the BOM or BOMs are updated.

Can anyone advise on a better system. Has anyone had any experiance with Pegasus / BOMS.
 
Elsmar Forum Sponsor

Wes Bucey

Prophet of Profit
#2
Re: Concessions

Hi ,

I have question. The company I work for raise concessions which can last up to a 1 years, in some cases even longer.

The reason for this is due to the system we use called Pegasus. This system stores our Bill of Materials (BOMs). When we find that we need to change a single component in a BOM we have to open each BOM save it to our system and make the change, then save it back to Pegasus. In Some cases the change could affect between 1 to 50 BOMs. Due to work loads they have thought of a way to get around this by raising a concession untill the BOM or BOMs are updated.

Can anyone advise on a better system. Has anyone had any experiance with Pegasus / BOMS.
FWIW:
Even back in the "olden" days (before computers - even "big iron" like IBM and Univac), many organizations were loathe to make new drawings and new bills of materials when there was a relatively minor revision. Minor revisions were things like adding approved suppliers for special materials or allowing substitutions of "generic" components for brand name ones. So they would just circulate a "concession note" - meaning it was not an actual "change" to a design, merely an acknowledgement that some compatible materials or components had become available which were often easier to obtain and very likely less expensive. They didn't want suppliers to discard materials or components they might already have in stock nor disrupt esablished suppy chains. As late as 1995, I came across such a concession in a customer's contract which dated back to 1980 and was still in force!

This situation is, of course, exactly the kind of circumstance where mistakes and delays can occur because the "concession" sometimes gets lost in a morass of paperwork. Such incidents were part of the reason the aerospace industry became such big proponents of Configuration Management when the errors and omissions started to cost serious money and sometimes crippled entire production lines as suppliers, unaware of the concessions, struggled to obtain the original listed material or component.

The point you make
In Some cases the change could affect between 1 to 50 BOMs.
is a good example of the cascading effect of small changes such as the one I delineate in this post about Configuration Management

In terms of your software - there are often code writers at the software companies who will write a neat little macro which will automatically update all Associated Documents. The legacy documents and the Associated Documents, of course, can only be updated if the software can find them in the database. The easiest way for finding the legacy documents in the database is by attaching little "metatags" which identify them as being an Associated Document. In the "olden" days, this was a horrendous task performed with numerous sets of cross-index cards. With modern computers - it's done in a fraction of a second - the catch is the extra time in attaching the metatags (still simpler and quicker than writing or typing index cards!)
 
Thread starter Similar threads Forum Replies Date
B AS NZS 5131 - Procedure on Concessions with focus on Steel Fabrication Document Control Systems, Procedures, Forms and Templates 1
R Concessions - ISO 13485:2016 requires concession approval from customers Nonconformance and Corrective Action 2
M DHR (Design History Record) Requirements - Concessions Quality Manager and Management Related Issues 12
L The Perfect Engineering Change and Concessions Management System Document Control Systems, Procedures, Forms and Templates 8
J Do auditors make concessions for smaller companies - AS9100 Small Company Questions AS9100, IAQG, NADCAP and Aerospace related Standards and Requirements 12
S FDA expectation of Concessions - Changes to a DMR ISO 13485:2016 - Medical Device Quality Management Systems 10
R Ink and Label Shelf Life and Internal Concessions for Expired Stock ISO 9000, ISO 9001, and ISO 9004 Quality Management Systems Standards 19
C Concessions ISO 9000, ISO 9001, and ISO 9004 Quality Management Systems Standards 4
Q Raising A CAPA on Current CAPA system US Food and Drug Administration (FDA) 3
Q Raising a Major Nonconformance during an Internal Audit Internal Auditing 23
C Raising NCRs for Supplier Errors Supplier Quality Assurance and other Supplier Issues 10
L Criteria for raising a Nonconforming Material Report Nonconformance and Corrective Action 4
N Raising a Nonconformance for Lack of Competency of Contractor ISO 9000, ISO 9001, and ISO 9004 Quality Management Systems Standards 4
Sidney Vianna Raising the bar for TS 16949 auditors General Auditing Discussions 0
M Tasked with Raising Quality Awareness - Metrics to apply - Identification wrist bands Quality Tools, Improvement and Analysis 4
M Non-Conformance Report for Concession ISO 9000, ISO 9001, and ISO 9004 Quality Management Systems Standards 15
T IATF 16949 - Customer Authorization for Concession or Deviation Permit IATF 16949 - Automotive Quality Systems Standard 22
J ISO 9001:2015 Cl. 8.7.1 d) Obtaining Authorization for Acceptance under Concession ISO 9000, ISO 9001, and ISO 9004 Quality Management Systems Standards 1
T Customer Authorization for Concession - IATF 16949 Clause 8.5.1.1 IATF 16949 - Automotive Quality Systems Standard 3
M Concession Requests from Suppliers ISO 9000, ISO 9001, and ISO 9004 Quality Management Systems Standards 2
K Marking Aerospace parts after concession/deviation & use as is dispositioning AS9100, IAQG, NADCAP and Aerospace related Standards and Requirements 30
M 8.3 Control of NC Product - Who is the Relevant Authority for Concession? IATF 16949 - Automotive Quality Systems Standard 10
G Production Permit (aka Waiver) vs. Concession (aka Deviation) - Definitions Quality Manager and Management Related Issues 4
T When to use a Concession over a Deviation - Concession vs. Deviation Document Control Systems, Procedures, Forms and Templates 7
B Release of Nonconforming Product with Concession - 21 CFR 820.90(b)(1) - Class II Nonconformance and Corrective Action 1
M Approval vs. Point of Release and Concession Usage Document Control Systems, Procedures, Forms and Templates 1
K Would you classify this as a concession? Document Control Systems, Procedures, Forms and Templates 5
Q Request for Concession - Seeking "Concession Request" Form Document Control Systems, Procedures, Forms and Templates 16
A Concession/ Deviation for change in manufacturing process IATF 16949 - Automotive Quality Systems Standard 1
H Concept of "Concession" for NC (Nonconforming) Product ISO 9000, ISO 9001, and ISO 9004 Quality Management Systems Standards 4
S Concession Procedure FDA Guidelines - medical devices. 21 CFR Part 820 - US FDA Quality System Regulations (QSR) 2
M Shipping Non-Conforming Material under Concession - Who uses the "loophole" in 8.3? ISO 9000, ISO 9001, and ISO 9004 Quality Management Systems Standards 33

Similar threads

Top Bottom