J
Jimmy Olson
Howdy everyone. It seems like the terms "continual improvement" and "continuous improvement" are both tossed about and interchanged. There is also some debate on whether these two terms mean the same thing.
I know the prefered term as far as ISO is concerned is "continual improvement. Does anyone have any opinions on if they feel these terms are the same or if they have different meaning? Thanks.
I know the prefered term as far as ISO is concerned is "continual improvement. Does anyone have any opinions on if they feel these terms are the same or if they have different meaning? Thanks.
Last edited by a moderator: