Continuous Sampling Plan for small lot sizes: Does MIL-STD 1235B provide one?

T

The Fixer

#1
We are presently using MIL-STD-105 and because of our small lot sizes we are inspecting about 65% of everything produced. We want to go to continuous sampling and I was told that MIL-STD 1235B provided a viable plan. Is that correct or is there a better way to sample small lot sizes (30-150) using AQL's.
 
Elsmar Forum Sponsor

Marc

Hunkered Down for the Duration
Staff member
Admin
#3
Dawn:

How long is the procedure? Could it be posted here (paste the text in a Reply To Topic)?

Could you summarize the basics of a C=0 acceptance plan?
 
Thread starter Similar threads Forum Replies Date
J Dodges 1943 paper on A Sampling Inspection Plan for Continuous Production Inspection, Prints (Drawings), Testing, Sampling and Related Topics 1
C How to select the requirements for Continuous Sampling Plan (CSP-1&F), Mil-Std 1235C? Inspection, Prints (Drawings), Testing, Sampling and Related Topics 3
T MIL-STD-105E & Continuous production sampling plan Inspection, Prints (Drawings), Testing, Sampling and Related Topics 4
C Continuous Sampling Plan CSP-1 aka MIL STD 1235C Inspection, Prints (Drawings), Testing, Sampling and Related Topics 7
0 Standards for Sampling a Continuous Process Inspection, Prints (Drawings), Testing, Sampling and Related Topics 4
B Can Continuous Sampling Plans be applied to service organizations? Inspection, Prints (Drawings), Testing, Sampling and Related Topics 1
D Ppk Sampling Method - Does data for Ppk have to been continuous? Inspection, Prints (Drawings), Testing, Sampling and Related Topics 4
M Sampling a continuous process - How to use AQL with a continuous process AQL - Acceptable Quality Level 6
F SPC/Sampling on Bulk Material (Continuous Nonwoven process - total weight) Inspection, Prints (Drawings), Testing, Sampling and Related Topics 2
G What is the difference between discrete and continuous variables? Problem Solving, Root Cause Fault and Failure Analysis 5
A How to set up Continuous CpK monitoring of an injection mold process Reliability Analysis - Predictions, Testing and Standards 7
P Large data sets of continuous individual data - Estimated or actual deviation Capability, Accuracy and Stability - Processes, Machines, etc. 2
V System suitability or stability during continuous usage Gage R&R (GR&R) and MSA (Measurement Systems Analysis) 0
S Government MotorPool Continuous Improvement ISO 9000, ISO 9001, and ISO 9004 Quality Management Systems Standards 10
A How do I create a 3^k factorial design with factors be treated as continuous where I Using Minitab Software 0
T Method to assess Measurement System of a Continuous Process Gage R&R (GR&R) and MSA (Measurement Systems Analysis) 2
S Need Continuous improvement Suggestions - Small (30 of us) all-CNC machine shop ISO 9000, ISO 9001, and ISO 9004 Quality Management Systems Standards 28
N FDA Guidelines for implementing Continuous Improvement Process US Food and Drug Administration (FDA) 5
A Taguchi Minitab - Continuous Data - What should I choose as response variable? Using Minitab Software 3
V 'Representative' Sample of the Lot for a Continuous Process Inspection, Prints (Drawings), Testing, Sampling and Related Topics 4
D Pre-Design Verification - Using Continuous / Variables Data Statistical Analysis Tools, Techniques and SPC 2
L Is there a certifiable Continuous Improvement system? Various Other Specifications, Standards, and related Requirements 6
J Continuous Improvement vs. Preventive Actions - Differences Preventive Action and Continuous Improvement 3
Miner Advanced MSA of Continuous Data Part 4: How to Sample Parts Imported Legacy Blogs 1
Miner Advanced MSA of Continuous Data Part 3: Are 3 Operators or 2 Replicates Enough? Imported Legacy Blogs 0
Miner Advanced MSA of Continuous Data Part 2: Are 10 Parts Enough? Imported Legacy Blogs 0
B What Advantages Continuous Processing of Tablets Can Offer Manufacturing and Related Processes 3
M Ensuring Continuous Quality Raw Materials from Suppliers Quality Manager and Management Related Issues 8
M Continuous Improvement Log vs. Formal CAPA System Preventive Action and Continuous Improvement 3
F Suggestions for quick & effective solution for Continuous Improvement Requirements ISO 9000, ISO 9001, and ISO 9004 Quality Management Systems Standards 14
A Continuous Improvement: How it works in your company? How to record the CI actions? Lean in Manufacturing and Service Industries 4
H Continuous Monitoring Instrument Data Validation and how to calculate Outliers Quality Tools, Improvement and Analysis 1
P NADCAP Certified - Heat Treat Continuous Belt Driven Oven question AS9100, IAQG 9100, Nadcap and related Aerospace Standards and Requirements 3
P Benchmarking and Continuous Improvement Tool Benchmarking 3
L How to Document Continuous Improvement Projects Lean in Manufacturing and Service Industries 2
B Regression analysis with discrete dependent variable and continuous independent var. Statistical Analysis Tools, Techniques and SPC 13
V Which improvement tool/approach do you adopt for driving Continuous Improvement? Quality Tools, Improvement and Analysis 3
A Which test should I use? Binary Y, Continuous X Using Minitab Software 1
Crusader Real World Continuous Improvement Examples for Accounting Personnel? Quality Tools, Improvement and Analysis 3
A Objectives & Targets - Continuous Improvement (ISO14001) ISO 14001:2015 Specific Discussions 8
kedarg6500 Continuous Improvement Course Slide ISO 9000, ISO 9001, and ISO 9004 Quality Management Systems Standards 4
D Continuous Improvement Idea Gathering Tools and Software Preventive Action and Continuous Improvement 7
L Decision Matrix to help Operator driven Continuous Improvement Lean in Manufacturing and Service Industries 3
J Continuous Improvement SOP - How to demonstrate we meet TS 16949 Clause 8.5.1 IATF 16949 - Automotive Quality Systems Standard 12
C Continuous Improvement as a Newsletter Topic Misc. Quality Assurance and Business Systems Related Topics 5
Statistical Steven Continuous Data Analysis Sample Size Determination Six Sigma 3
M Samples of a Continuous Improvement Program Procedures Preventive Action and Continuous Improvement 3
Miner Advanced MSA of Continuous Data - Part 1: Within Part Variation Imported Legacy Blogs 4
I Traceability Method for Assemblies in a Continuous Production Line Manufacturing and Related Processes 3
P What method to use for Numeric Non-Continuous Data Gage R&R (GR&R) and MSA (Measurement Systems Analysis) 4
Similar threads


















































Top Bottom