Z ZoHac Apr 10, 2000 #1 Apr 10, 2000 #1 Can anyone help me in detrmining what should be a sample size for performing Average-variance control charts, while logging 100% precent of the population by automatic test during production?
Can anyone help me in detrmining what should be a sample size for performing Average-variance control charts, while logging 100% precent of the population by automatic test during production?
D Don Winton Apr 10, 2000 #2 Apr 10, 2000 #2 I am not sure if this will help, but I went into a detailed discussion of sampling below: http://Elsmar.com/ubb/Forum10/HTML/000027.html Regards, dWizard [This message has been edited by Don Winton (edited 10 April 2000).]
I am not sure if this will help, but I went into a detailed discussion of sampling below: http://Elsmar.com/ubb/Forum10/HTML/000027.html Regards, dWizard [This message has been edited by Don Winton (edited 10 April 2000).]