Control Methods in Control Plans

  • Thread starter T.P.NAMASIVAYAM
  • Start date
T

T.P.NAMASIVAYAM

CONTROL METHOD IN THE CONTROL PLANS

1) CAN ANYBODY EXPLAIN ABOUT THE "CONTROL METHOD" MENTIONED IN THE CONTROL PLAN.
2) IF 100% INSPECTION IS CARRIED OUT FOR A CHARACTERISTICS WHAT SHOULD BE THE CONTROL METHOD?
 
A

Al Dyer

Originally posted by T.P.NAMASIVAYAM:
1) CAN ANYBODY EXPLAIN ABOUT THE "CONTROL METHOD" MENTIONED IN THE CONTROL PLAN.
2) IF 100% INSPECTION IS CARRIED OUT FOR A CHARACTERISTICS WHAT SHOULD BE THE CONTROL METHOD?

There are really two types of control methods for control plans and FMEA, prevention control and detection control.

Your 100% inspection would be a "detection" control method for your characteristic.

A type of preventive control method might be an auto detect and reset for tool wear.

ASD...

[This message has been edited by Al Dyer (edited 07 April 2001).]
 
Top Bottom