Master lists
In our company the current revision of tool drawings is being identified using a master list.Every week there will be atleast two or three drawings that are either added newly in the list or where revision is done.So every week we have to change this master list atleast twice or thrice. This is really cumbersome as this list is distributed to two locations.
can anyone suggest a simpler method by which the current revision of these drawings can be identified?
In our company the current revision of tool drawings is being identified using a master list.Every week there will be atleast two or three drawings that are either added newly in the list or where revision is done.So every week we have to change this master list atleast twice or thrice. This is really cumbersome as this list is distributed to two locations.
can anyone suggest a simpler method by which the current revision of these drawings can be identified?
but if your drawing has a date or a number of the revision, the current revision is identified, isn´t it?