Control Plan and Audit Registration - PPAP - Packing Instructions

A

alexoigres

#1
Hello everybody,

I have a simple question that it might be very obvious but still...

I have PPAP level 3 approval for almost 2 years in one of my programs.. When I submitted my PPAP in the last part or check for my control plan (shipping), I went too fancy and I added the quantity per bin or boxes we're supposed to ship.
After some time my final packing instructions change from 20 pieces per box to 18 pcs per box (changed boxes style). I never changed my control plan but my packing instructions reflect the new quantity.

I have an audit next week and I would like to know if there is a specific note on the AIAG that my control plan MUST reflect my packing instructions. Is there anything that can protect me for an NCR with my actual process?

Thank you
 
Last edited by a moderator:
Elsmar Forum Sponsor

Howard Atkins

Forum Administrator
Staff member
Admin
#2
The control plan MUST reflect what you are doing.
You must update it to show the change.
What I would ask is what else has not been updated?
 

Chennaiite

Never-say-die
Trusted Information Resource
#3
Hello everybody,

I have a simple question that it might be very obvious but still...

I have PPAP level 3 approval for almost 2 years in one of my programs.. When I submitted my PPAP in the last part or check for my control plan (shipping), I went too fancy and I added the quantity per bin or boxes we're supposed to ship.
After some time my final packing instructions change from 20 pieces per box to 18 pcs per box (changed boxes style). I never changed my control plan but my packing instructions reflect the new quantity.

I have an audit next week and I would like to know if there is a specific note on the AIAG that my control plan MUST reflect my packing instructions. Is there anything that can protect me for an NCR with my actual process?

Thank you
Control plan checklist available in the AIAG APQP Manual explicitly mentions Packaging Process. Of course AIAG's, per se, is not auditable. But assuming that you are aspiring to ISO/TS 16949 (since you mention AIAG), you may end up with a non conformance per 7.5.1.1, according to which the Control plan shall be updated when any change occurs to Manufacturing Process (even though I guess the chances are slimmer).

Nevertheless, my question to you is - what is stopping you from identifying or updating packaging process in the Control plan?
 
S

sitapaty

#4
Hello everybody,

I have a simple question that it might be very obvious but still...

I have PPAP level 3 approval for almost 2 years in one of my programs.. When I submitted my PPAP in the last part or check for my control plan (shipping), I went too fancy and I added the quantity per bin or boxes we're supposed to ship.
After some time my final packing instructions change from 20 pieces per box to 18 pcs per box (changed boxes style). I never changed my control plan but my packing instructions reflect the new quantity.

I have an audit next week and I would like to know if there is a specific note on the AIAG that my control plan MUST reflect my packing instructions. Is there anything that can protect me for an NCR with my actual process?

Thank you
you still have one week left for the audit.Quickly revise your Control Plan.
Even if you donot do, it is a minor NC.
Sitapaty
 
A

alexoigres

#5
Thank you guys... I believed I do have to change the control plan... The problem is that I have so many programs that I need to revise. Thank you anyway for the lesson.
 

Golfman25

Trusted Information Resource
#6
After some time my final packing instructions change from 20 pieces per box to 18 pcs per box (changed boxes style). I never changed my control plan but my packing instructions reflect the new quantity.
Can you make the control plan more general? You could refer to the packing instructions for the specific box quanties. That way you reduce the number of documents you update -- only the packing instructions in this case. Good luck.
 
Thread starter Similar threads Forum Replies Date
J VDA audit, control plan - My hair is almost gone now VDA Standards - Germany's Automotive Standards 5
Q Chrysler required FMEA and Control Plan Document Audit Forms and Process Audit Check FMEA and Control Plans 7
T TS 16949 Clause 7.5.1.1 - Audit Finding - Control Plan Requirements IATF 16949 - Automotive Quality Systems Standard 11
S External Audit Non-Conformance - Control Plan and Inspection Issues IATF 16949 - Automotive Quality Systems Standard 1
M GM's QSB (Quality System Basics) - Checklist for Control Plan Audit development. FMEA and Control Plans 4
Anerol C How to Audit Shop Floor without Flow Diagram, Control Plan/PFMEA? Internal Auditing 5
A Non-conformance logged following a TS16949 Stage 2 audit - APQP Control Plan IATF 16949 - Automotive Quality Systems Standard 15
Ron Rompen Audit Finding or Nonconformance? Gage cited on Control Plan and Inspection Record IATF 16949 - Automotive Quality Systems Standard 13
L Audit Nonconformance - Not following Control Plan - How to answer Request for CA? Document Control Systems, Procedures, Forms and Templates 8
R Layered Audits - Where to tie the layered audit process back to FMEA & Control Plan FMEA and Control Plans 10
A Prototype control plan FMEA and Control Plans 2
S Which department should prepare the control plan? could you show me a standard regarding to this matter. FMEA and Control Plans 17
G Control Plan & PFMEA Review Procedure? FMEA and Control Plans 1
P IATF 16949 requirement - error-proofing in control plan IATF 16949 - Automotive Quality Systems Standard 3
earl62 What is the best way to control special characteristics in Control plan? Is it Mandatory to have SPC for IATF 16949? IATF 16949 - Automotive Quality Systems Standard 12
I Control Plan (Product/Process specification/ Tolerance) acceptance FMEA and Control Plans 27
J Control Plan use on the manufacturing floor FMEA and Control Plans 4
E Change in control plan - Do I have to do sampling? IATF 16949 - Automotive Quality Systems Standard 1
D All Dimensions listed on control plan FMEA and Control Plans 10
DuncanGibbons Manufacturing Plan vs Material Specification vs Control Plan Manufacturing and Related Processes 5
S Should safety checks be included in the Control Plan? IATF 16949 - Automotive Quality Systems Standard 5
D Supplied Product on Control Plan - Lot ranging in 40,000 pcs per product FMEA and Control Plans 3
M Is there any pre-defined Control plan format/template acc. VDA? VDA Standards - Germany's Automotive Standards 0
G Control Plan - Include the processes for each sub component? APQP and PPAP 2
A Redesigning our process flow chart, PFMEA and Control Plan Process Maps, Process Mapping and Turtle Diagrams 4
D Link between FMEA, flow chart and control plan FMEA and Control Plans 10
M Dynamic Control Plan Draft - need review FMEA and Control Plans 2
Ashland78 IATF 16949 Control Plan Authorizations IATF 16949 - Automotive Quality Systems Standard 2
N Control plan evaluation methods - Which methods should be carried over from the PFMEA? FMEA and Control Plans 3
Rameshwar25 What is a Control Plan at "Material Level"? IATF 16949 - Automotive Quality Systems Standard 4
L Control Plan - Multiple Process Steps FMEA and Control Plans 8
O Difference Between PFMEA & Control Plan FMEA and Control Plans 3
W Purchased Part Control Plan (IATF 16949) FMEA and Control Plans 7
Howard Atkins MSAs are now required on every feature of the control plan - IATF 16949 IATF 16949 - Automotive Quality Systems Standard 13
Jeff Putman EQI Prelaunch Control Plan - Definition Customer and Company Specific Requirements 0
V How to Add Annual Revalidation requirements to Control Plan? FMEA and Control Plans 5
N Control plan references FMEA and Control Plans 6
L Simple Example for PFMEA / Control Plan Training Training - Internal, External, Online and Distance Learning 1
J Functional group / area responsible on a Control Plan IATF 16949 - Automotive Quality Systems Standard 1
T Should Testing be a separate operation in the Control Plan? FMEA and Control Plans 5
M Annual Layout requirements for PPAP/Control Plan FMEA and Control Plans 6
T IATF 16949 Control Plan and Process Monitoring Requirement(s) IATF 16949 - Automotive Quality Systems Standard 1
J Why Control Plan Review needs to be Approved by the Customer IATF 16949 - Automotive Quality Systems Standard 1
B PFMEA and Control Plan Links APQP and PPAP 2
A Corrective Action Column in Control Plan and aligning PFD, PFMEA and Control Plan FMEA and Control Plans 6
M Control Plan MSA's - Pressure Gages IATF 16949 - Automotive Quality Systems Standard 2
S Family / Generic type of FMEA & Control Plan and Symbols FMEA and Control Plans 3
V Do I need to add everything on print to control plan? FMEA and Control Plans 1
H Control plan example format for CNC machining activities FMEA and Control Plans 3
M Mention "according to Work Instruction" in Control Plan FMEA and Control Plans 3

Similar threads