Control Plan Content Requirements - Level of Detail

Q

QM Mary

#21
So, what you are saying is, that a small failure in the field, even if it can lead to a larger problem is no big deal Tsubaki doesn't think so. Look where GM is now. I'm sorry, I'm just saying that UTA, Tsubaki, and some of the front runners in the industry now have a different outlook. It used to be 1 Pfema changed around here and there would work for all. But not any more. Things are getting where they want more and more detail on every document presented to them.
 
Elsmar Forum Sponsor

Jim Wynne

Staff member
Admin
#22
So, what you are saying is, that a small failure in the field, even if it can lead to a larger problem is no big deal...
Where did I say, or even suggest this? :confused: You ultimately have to do what the customer wants, but just because a customer wants something doesn't mean it makes sense, or that you should accept it without at least trying to reason with them.
 
S

sixsigmais

#25
Some of the manufacturing have thousands of product, they found some difficulty to create thousand of CP in details. In this case, i suggest to make a general CP on your procedure, then the individual CP can just list down all those critical characteristic. However, CP shall include incoming, inprocess and outgoing
 
Q

QM Mary

#26
You complete your control plans the way you feel you must. However, I just sat through a PPAP meeting with GM/Tsubaki. I ask them if I had to list every dimension from the print, or would they want just the critical dimensions. Their answer to me was, "How do we know you if or how you are going to control all the dimensions or if you are just controling the criticals? So yes, you need to put all dimensions." If you list only your criticals and your PPAP is approved, then you did your job per your customer requirements. CUSTOMER SATISFACTION IS JOB ONE!!!!!
 
Thread starter Similar threads Forum Replies Date
K FMEA and Control Plan Header Content FMEA and Control Plans 6
E Content of Column 18 of the Control Plan FMEA and Control Plans 1
A Control Plan Content Requirements - GDP (Good Documentation Practices) APQP and PPAP 3
N Prototype Control Plan content - What has to be in a Prototype Control Plan? FMEA and Control Plans 3
D Process Control Plan Content: Relationship to PFMEA and Flow Diagram FMEA and Control Plans 3
Marc Control Plan content and fields - Format and Reaction Plan - 4.9.1 & 4.9.2 QS-9000 - American Automotive Manufacturers Standard 7
D Three Questions About Control Plan Content and Requirements FMEA and Control Plans 11
A Prototype control plan FMEA and Control Plans 2
S Which department should prepare the control plan? could you show me a standard regarding to this matter. FMEA and Control Plans 17
G Control Plan & PFMEA Review Procedure? FMEA and Control Plans 1
P IATF 16949 requirement - error-proofing in control plan IATF 16949 - Automotive Quality Systems Standard 3
earl62 What is the best way to control special characteristics in Control plan? Is it Mandatory to have SPC for IATF 16949? IATF 16949 - Automotive Quality Systems Standard 12
I Control Plan (Product/Process specification/ Tolerance) acceptance FMEA and Control Plans 27
J Control Plan use on the manufacturing floor FMEA and Control Plans 4
E Change in control plan - Do I have to do sampling? IATF 16949 - Automotive Quality Systems Standard 1
D All Dimensions listed on control plan FMEA and Control Plans 10
DuncanGibbons Manufacturing Plan vs Material Specification vs Control Plan Manufacturing and Related Processes 5
S Should safety checks be included in the Control Plan? IATF 16949 - Automotive Quality Systems Standard 5
D Supplied Product on Control Plan - Lot ranging in 40,000 pcs per product FMEA and Control Plans 3
M Is there any pre-defined Control plan format/template acc. VDA? VDA Standards - Germany's Automotive Standards 0
G Control Plan - Include the processes for each sub component? APQP and PPAP 2
A Redesigning our process flow chart, PFMEA and Control Plan Process Maps, Process Mapping and Turtle Diagrams 4
D Link between FMEA, flow chart and control plan FMEA and Control Plans 10
M Dynamic Control Plan Draft - need review FMEA and Control Plans 2
Ashland78 IATF 16949 Control Plan Authorizations IATF 16949 - Automotive Quality Systems Standard 2
N Control plan evaluation methods - Which methods should be carried over from the PFMEA? FMEA and Control Plans 3
Rameshwar25 What is a Control Plan at "Material Level"? IATF 16949 - Automotive Quality Systems Standard 4
L Control Plan - Multiple Process Steps FMEA and Control Plans 8
O Difference Between PFMEA & Control Plan FMEA and Control Plans 3
W Purchased Part Control Plan (IATF 16949) FMEA and Control Plans 7
J VDA audit, control plan - My hair is almost gone now VDA Standards - Germany's Automotive Standards 5
Howard Atkins MSAs are now required on every feature of the control plan - IATF 16949 IATF 16949 - Automotive Quality Systems Standard 13
Jeff Putman EQI Prelaunch Control Plan - Definition Customer and Company Specific Requirements 0
V How to Add Annual Revalidation requirements to Control Plan? FMEA and Control Plans 5
N Control plan references FMEA and Control Plans 6
L Simple Example for PFMEA / Control Plan Training Training - Internal, External, Online and Distance Learning 1
J Functional group / area responsible on a Control Plan IATF 16949 - Automotive Quality Systems Standard 1
T Should Testing be a separate operation in the Control Plan? FMEA and Control Plans 5
M Annual Layout requirements for PPAP/Control Plan FMEA and Control Plans 6
T IATF 16949 Control Plan and Process Monitoring Requirement(s) IATF 16949 - Automotive Quality Systems Standard 1
J Why Control Plan Review needs to be Approved by the Customer IATF 16949 - Automotive Quality Systems Standard 1
B PFMEA and Control Plan Links APQP and PPAP 2
A Corrective Action Column in Control Plan and aligning PFD, PFMEA and Control Plan FMEA and Control Plans 6
M Control Plan MSA's - Pressure Gages IATF 16949 - Automotive Quality Systems Standard 2
S Family / Generic type of FMEA & Control Plan and Symbols FMEA and Control Plans 3
V Do I need to add everything on print to control plan? FMEA and Control Plans 1
H Control plan example format for CNC machining activities FMEA and Control Plans 3
M Mention "according to Work Instruction" in Control Plan FMEA and Control Plans 3
W Does TS16949 require MSA on all measurement systems in the Control Plan? Gage R&R (GR&R) and MSA (Measurement Systems Analysis) 5
T Software for linking Process Flow Diagram, Process FMEA and Control Plan APQP and PPAP 9

Similar threads

Top Bottom