I am having a split opinion in the quality department, on the control plan it ask for part number / latest change level

Latest change level - to me it means the customer revision level and/or rev date from the drawing.

The company started adding suffix to the internal part number when making changes instead of giving it a new part number.

Now the company wants to put the suffix from the internal part number as rev.

Is it written anywhere what rev needs to go on the control plan, it seems to me if the internal suffix is used, it looses traceability to the customer rev.
Please help to restore peace within the quality team
Thank you
Elke
 
Elsmar Forum Sponsor
L

lk2012

#2
hi Elke,
I'd lean towards the internal revision. The Control Plan is a document for your production so they should know which revision in your company they're working towards.
Also, some companies are several tiers down and may not always have all the customer information.
hope this helps
Lil
 

Chennaiite

Never-say-die
Trusted Information Resource
#3
Hello
I am having a split opinion in the quality department, on the control plan it ask for part number / latest change level

Latest change level - to me it means the customer revision level and/or rev date from the drawing.

The company started adding suffix to the internal part number when making changes instead of giving it a new part number.

Now the company wants to put the suffix from the internal part number as rev.

Is it written anywhere what rev needs to go on the control plan, it seems to me if the internal suffix is used, it looses traceability to the customer rev.
Please help to restore peace within the quality team
Thank you
Elke
I have come across instances of last syllable(or two) of the part number representing revision level. If I am not wrong Ford uses this methodology. In cases like this, of course mentioning just the Part number in the Control plan(or wherever) will suffice. If you are trying to separate the suffix and show it as revision level just for the sake of filling empty fields in Control plan, I think it is redundant and adds to confusion. If by mentioning your internal part number with suffix the linkage with Customer Part number and revision level is clear, I think you got little to worry about there.
 
Thread starter Similar threads Forum Replies Date
S Control Plan Details vs. Operator Instruction Sheets - Document Contents IATF 16949 - Automotive Quality Systems Standard 9
L Contents of PPAP Control Plan - Product & Process Characteristics? FMEA and Control Plans 10
V Pre-Launch Control Plan Contents - What should I include? FMEA and Control Plans 4
earl62 What is the best way to control special characteristics in Control plan? Is it Mandatory to have SPC for IATF 16949? IATF 16949 - Automotive Quality Systems Standard 1
I Control Plan (Product/Process specification/ Tolerance) acceptance FMEA and Control Plans 27
J Control Plan use on the manufacturing floor FMEA and Control Plans 4
E Change in control plan - Do I have to do sampling? IATF 16949 - Automotive Quality Systems Standard 1
D All Dimensions listed on control plan FMEA and Control Plans 10
DuncanGibbons Manufacturing Plan vs Material Specification vs Control Plan Manufacturing and Related Processes 4
S Should safety checks be included in the Control Plan? IATF 16949 - Automotive Quality Systems Standard 5
D Supplied Product on Control Plan - Lot ranging in 40,000 pcs per product FMEA and Control Plans 3
M Is there any pre-defined Control plan format/template acc. VDA? VDA Standards - Germany's Automotive Standards 0
G Control Plan - Include the processes for each sub component? APQP and PPAP 2
A Redesigning our process flow chart, PFMEA and Control Plan Process Maps, Process Mapping and Turtle Diagrams 4
D Link between FMEA, flow chart and control plan FMEA and Control Plans 10
M Dynamic Control Plan Draft - need review FMEA and Control Plans 2
Ashland78 IATF 16949 Control Plan Authorizations IATF 16949 - Automotive Quality Systems Standard 2
N Control plan evaluation methods - Which methods should be carried over from the PFMEA? FMEA and Control Plans 3
Rameshwar25 What is a Control Plan at "Material Level"? IATF 16949 - Automotive Quality Systems Standard 4
L Control Plan - Multiple Process Steps FMEA and Control Plans 8
O Difference Between PFMEA & Control Plan FMEA and Control Plans 3
W Purchased Part Control Plan (IATF 16949) FMEA and Control Plans 7
J VDA audit, control plan - My hair is almost gone now VDA Standards - Germany's Automotive Standards 5
Howard Atkins MSAs are now required on every feature of the control plan - IATF 16949 IATF 16949 - Automotive Quality Systems Standard 13
Jeff Putman EQI Prelaunch Control Plan - Definition Customer and Company Specific Requirements 0
V How to Add Annual Revalidation requirements to Control Plan? FMEA and Control Plans 5
N Control plan references FMEA and Control Plans 6
L Simple Example for PFMEA / Control Plan Training Training - Internal, External, Online and Distance Learning 1
J Functional group / area responsible on a Control Plan IATF 16949 - Automotive Quality Systems Standard 1
T Should Testing be a separate operation in the Control Plan? FMEA and Control Plans 5
M Annual Layout requirements for PPAP/Control Plan FMEA and Control Plans 6
T IATF 16949 Control Plan and Process Monitoring Requirement(s) IATF 16949 - Automotive Quality Systems Standard 1
J Why Control Plan Review needs to be Approved by the Customer IATF 16949 - Automotive Quality Systems Standard 1
B PFMEA and Control Plan Links APQP and PPAP 2
A Corrective Action Column in Control Plan and aligning PFD, PFMEA and Control Plan FMEA and Control Plans 6
M Control Plan MSA's - Pressure Gages IATF 16949 - Automotive Quality Systems Standard 2
S Family / Generic type of FMEA & Control Plan and Symbols FMEA and Control Plans 3
V Do I need to add everything on print to control plan? FMEA and Control Plans 1
H Control plan example format for CNC machining activities FMEA and Control Plans 3
M Mention "according to Work Instruction" in Control Plan FMEA and Control Plans 3
W Does TS16949 require MSA on all measurement systems in the Control Plan? Gage R&R (GR&R) and MSA (Measurement Systems Analysis) 5
T Software for linking Process Flow Diagram, Process FMEA and Control Plan APQP and PPAP 9
S Attribute G&R for all Visual Controls in Control Plan Gage R&R (GR&R) and MSA (Measurement Systems Analysis) 1
I Any recommendations on software for managing the APQP, PPAP, PFMEA, Control Plan etc? Quality Assurance and Compliance Software Tools and Solutions 2
F What goes into a Control Plan? FMEA and Control Plans 1
J Tighter Tolerances than Control Plan FMEA and Control Plans 1
R Recording Control Plan Changes Document Control Systems, Procedures, Forms and Templates 3
K Control Plan vs PFMEA Control Methods FMEA and Control Plans 1
B Need help with a Control Plan for Encapsulation Mold / Trimming / Forming Tooling FMEA and Control Plans 9
U-DOG SC (Special Characteristics) in CP (Control Plan) not on all Prints IATF 16949 - Automotive Quality Systems Standard 1

Similar threads

Top Bottom