Hi greetings!!
I'm new to control plans and I haven't had much luck finding good literature about it. So I have this question:
In the evaluation methods column which methods should be carried over from the PFMEA? The detection methods or the prevention methods? also, can this column have more methods than the declared in the PFMEA?
Thanks.