#1
Where can I find some examples of Control plans for Incoming, Warehouse and Shipping processes?
I am in the stage to prepare something but I would like to see some material in this sense, just to get some ideas on controls .
No matter the business. If just want to share or address me, I will appreciate as usual.:bigwave:
 
Elsmar Forum Sponsor

Kales Veggie

People: The Vital Few
#2
Where can I find some examples of Control plans for Incoming, Warehouse and Shipping processes?
I am in the stage to prepare something but I would like to see some material in this sense, just to get some ideas on controls .
No matter the business. If just want to share or address me, I will appreciate as usual.:bigwave:
Before you develop a control plan, you and your team should develop a Flow diagram and a process FMEA first. It will show you what the significant / special characteristic that you have to control.

Receiving control plan often include material certification, certain significant drawing characteristics.

Warehouse: usually not.

Shipping: could include labeling verification / readability of barcodes.

Again, develop a FMEA, then you know what to control.
 

qusys

Trusted Information Resource
#3
Before you develop a control plan, you and your team should develop a Flow diagram and a process FMEA first. It will show you what the significant / special characteristic that you have to control.

Receiving control plan often include material certification, certain significant drawing characteristics.

Warehouse: usually not.

Shipping: could include labeling verification / readability of barcodes.

Again, develop a FMEA, then you know what to control.
Thk you, Kales.
It is what I have done with process flow including FMEA . Personnel are not so accustomed, so it is very difficult to direct them.
however i have considered what you suggested. We also included warehouse because there coul happen problem in mixing material.
However if there is some completed example to see, it could be helpful for me to show during an awareness and benchmarking session:bigwave:
 
C

coffee chang

#4
Hi all,

Have a few questions here regarding the incoming inspection control plan.
My company is subcontractor. All critical dimensions stated in the drawing are done and performed by supplier. So, at incoming inspection, not all critical dimensions are being measured, measurement only performed at certain dimension. In the Incoming Inspection control plan, how should I justify the characteristics of the product which I measured? If I put as per drawing, which is critical dimension, another question will arise, why are measurements of certain dimensions not being performed?
Is that necessary to put the term in the special characteristics column?
 
Last edited by a moderator:

Jim Wynne

Staff member
Admin
#5
Hi all,

Have a few questions here regarding the incoming inspection control plan.
My company is subcontractor. All critical dimensions stated in the drawing are done and performed by supplier. So, at incoming inspection, not all critical dimensions are being measured, measurement only performed at certain dimension. In the Incoming Inspection control plan, how should I justify the characteristics of the product which I measured? If I put as per drawing, which is critical dimension, another question will arise, why are measurements of certain dimensions not being performed?
Is that necessary to put the term in the special characteristics column?
If the critical dimensions are being measured and recorded by your supplier, there isn't necessarily any need for you to measure them again. You should have the supplier's documentation (inspection reports) of the measurements done. You should also have some form of evidence that justifies foregoing redundant inspections--historical data from the supplier, audit results, etc.
 
V

vallesj

#6
I am just doing an specific PFD, PFMEA and CP for a receiving (including store), inspection before ship, and shipping process. This is my first work on actually doing the documents instead of review them, so I am not sure If everything I am doing is correct, specially for the Control Plan. Flow chart, no brain science; PFMEA I took AIAG training so I feel pretty comfortable; Control Plan is that item I don't feel so confident since it is not a manufacturing location many of the usual product characteristics or control methods are something different. Probably I am describing the process as most detailed as possible so that it can really help us identify areas for improvement, specially to avoid damage during transportation and avoid mixing of material.
Please share what you have with us, so that I can review it as SQE and provide input, and at the same time will help me benchmark with what I am helping to prepare for my company.
 
Thread starter Similar threads Forum Replies Date
J Incoming Inspection Plans under Design Control (part of DMR)? 21 CFR Part 820 - US FDA Quality System Regulations (QSR) 4
T Linking Control Plans and PFMEA's FMEA and Control Plans 3
T PFMEA and Control Plans on legacy product FMEA and Control Plans 5
J How to make Quality Control plans Quality Tools, Improvement and Analysis 5
Jimmy123 What is the difference between Error Proofing and Controls? ISO/IATF 16949 - Control Plans FMEA and Control Plans 16
K AIAG/VDA FMEA & Process Control Plans FMEA and Control Plans 0
B Main responsibility for Control Plans - creating and maintaining FMEA and Control Plans 15
A CAQ Software - Implementation of a Software for FMEA's and Control Plans FMEA and Control Plans 0
B Control Plans for Quality Management System Processes ISO 9000, ISO 9001, and ISO 9004 Quality Management Systems Standards 2
optomist1 TS 16949 Control Plans - Non-Production Parts IATF 16949 - Automotive Quality Systems Standard 1
T Document Control of FMEAs and Control Plans FMEA and Control Plans 5
S Referencing procedures on Control Plans - Best Practices FMEA and Control Plans 3
N Understanding, Challenging & Approving Supplier Control Plans FMEA and Control Plans 7
M Are 'Error Proofing Methods' required to be mentioned in Control Plans? FMEA and Control Plans 7
O Any recommendations on good book on Control Plans besides AIAG? FMEA and Control Plans 3
D Steps to Complete Quality Control Plans and Work Instruction Manufacturing and Related Processes 4
S MSA Study Requirements for Control Plans FMEA and Control Plans 5
S Seeking Ballooned PFMEA and Control Plans for Training FMEA and Control Plans 4
D Annual Layouts in Control Plans FMEA and Control Plans 5
G Interim Control Plans FMEA and Control Plans 6
S Ensuring Print Dimensions are in Control Plans, WI's and Receiving Inspection Document Control Systems, Procedures, Forms and Templates 3
J Question about APQP Control Plans FMEA and Control Plans 2
S What are your thoughts on Process vs Product Control Plans ? FMEA and Control Plans 3
T Are Control Plans "Summary Documents" not meant to replace Work Instructions? IATF 16949 - Automotive Quality Systems Standard 3
D Bulk Material Supplier Control Plans APQP and PPAP 2
S Referencing other documents in Control Plans Quality Manager and Management Related Issues 5
J Efficiently Produce Control Plans and FMEAs FMEA and Control Plans 1
R Double Spec'ing in Control Plans FMEA and Control Plans 11
L Do ISO 13485 Certified Organizations need to have Control Plans and FMEAs? ISO 13485:2016 - Medical Device Quality Management Systems 11
Adriane How Confidential are my FMEAs and Control Plans Quality Manager and Management Related Issues 3
C Control Plans - Evaluation Measurement Technique Column - Torque Control FMEA and Control Plans 2
Brizilla Control Plans and the Shipping Process FMEA and Control Plans 13
R Rolling out Control Plans FMEA and Control Plans 1
5 Changes to Control Plans or PFMEA's (Process FMEA) FMEA and Control Plans 6
S Process Control Plans: Product Characteristics vs. Process Characteristics Quality Manager and Management Related Issues 7
D Good source for Checking and Evaluating Control Plans needed FMEA and Control Plans 4
C Operator understanding of what Control Plans are and how they are used Document Control Systems, Procedures, Forms and Templates 8
G Should Serial # of all Measurement Instruments (Calipers,etc) be in Control Plans? FMEA and Control Plans 7
N Control Plans and Inspection Plans for panel board industries FMEA and Control Plans 5
J Control Plans - VDA equivalent of AIAG APQP & Control Plan Manual VDA Standards - Germany's Automotive Standards 2
J Using Ppk to set up Control Plans - Injection molding Capability, Accuracy and Stability - Processes, Machines, etc. 7
J Control Plan Question - Are Control Plans considered a Form or a Work Instruction? FMEA and Control Plans 13
D TS 16949 and Control Plans - Need Tier II/III follow AIAG Annex A Format? IATF 16949 - Automotive Quality Systems Standard 27
kedarg6500 Guidance List for Control Methods in Control Plans? IATF 16949 - Automotive Quality Systems Standard 3
Douglas E. Purdy Classification of Suppliers & Control Plans to Reduce Receiving Inspection FMEA and Control Plans 6
G Control Plans vs. Detailed Routings ISO 9000, ISO 9001, and ISO 9004 Quality Management Systems Standards 5
D How should "Set-up" Parameters be Addressed in Control Plans? FMEA and Control Plans 1
V FMEA and CONTROL PLANS - AEROSPACE FMEA and Control Plans 1
I Help writing FMEA & Control Plans - Re-writing our FMEA & Control Plans FMEA and Control Plans 2
Q How Many Control Plans Needed? Prototype, Pre-launch and Production? FMEA and Control Plans 3

Similar threads

Top Bottom