Controlling Drawings / Prints - When and What's too much 'control'?

M

Michael T

#1
Okay guys & gals... I need your input here.

I'm revamping our Engineering department to finally conform to the Design & Development aspect of ISO 9001:2000. We are currently ISO 9002:1994 and haven't had Design Control instituted, however, that is changing with our transition to 9001. The Engineering dept. has run pretty much foot-loose and fancy-free and is now being reined in.

Here is what I inherited... we have some controlled drawings but only those that are associated with purchased material specification. I want to get all Engineering drawings controlled - yet I am running into significant resistance from the engineers as well as machinists. They are unhappy because if they want to change the position of the bolt holes on a brace (for example), they don't feel they should have to run that through a controlled document change process. They think that the dept. manager should be able to "sign off" on that type of change without having a formal review.

Does anyone have any suggestions as to where I might draw the line? Anyone care to share their thoughts on their own controlled drawing process/procedures?

Thanks!!!!!
 
Elsmar Forum Sponsor
M

M Greenaway

#2
Michael

Even under ISO9002 you should have controlled all documentation, including product drawings.

Your question probably relates more to engineering change control rather than pure document control.

Any design changes should go through a review process where the changes are considered by suitably trained and authorised personnel prior to implementation.

If the machinists have this skill then OK, but document who authorised the change somewhere, and have the back up information available to prove the person was suitably qualified to take such a decision.

If the changes are insignificant, like you suggest such things as bolt hole positions, then I would suggest that the design department modify the drawing so that bolt holes are not mandated, but a note added to the drawing 'to be drilled on assembly to suit', or words to that effect. In other words loosen up the design drawing so that these minor changes can be done without any formal ECN.
 
M

Michael T

#3
Re: Re: Controlled Drawing - What's too much?

Jim Wade said:


Hi Michael

What is the opinion of the department manager and his or her boss?

rgds Jim
Hiya Jim...

Hmmmm.... dept manager is a capable engineer who has his nose buried very deeply in his boss's.... ooops, never mind... :ko:

Seriously - the Engineering Mgr is an engineer. He likes to build things - he likes to play with prints & drawings - he hates paperwork. His boss is the company President. He's also an engineer... (read what you want into that)

Would I feel comfortable allowing the Eng. Mgr. to make minor changes to prints where the changes don't effect product quality? Yes.

Cheers!
 
M

Michael T

#4
Jim, Jim, Jim... logic? Nay - the vile wretch, logic, shall never pass through management's minds... :biglaugh:

Sorry... I just had to do that...

Anyway - I'm pretty sure that management will authorize low level (non product related) changes to machine drawings through our Request For Action (RFA) program with departmental manager approval. We already have procedures set for low level controlled document changes by department leaders - so this isn't a stretch.

With the latest push to transition to 9001:2000, I've been able to get some changes pushed through that were beneficial AND made sense. Sometimes it surprises them... :vfunny:


Cheers!!
 
#5
Document control and change

They are unhappy because if they want to change the position of the bolt holes on a brace (for example), they don't feel they should have to run that through a controlled document change process. They think that the dept. manager should be able to "sign off" on that type of change without having a formal review. They are unhappy because if they want to change the position of the bolt holes on a brace (for example), they don't feel they should have to run that through a controlled document change process. They think that the dept. manager should be able to "sign off" on that type of change without having a formal review. They are unhappy because if they want to change the position of the bolt holes on a brace (for example), they don't feel they should have to run that through a controlled document change process. They think that the dept. manager should be able to "sign off" on that type of change without having a formal review.
Just a thought here Michael, where does it say they can't make changes, review and approve changes at their level.

1) Are they doing this now?
2) If so, is it working?
3) If so, why not build this into the rules?


:confused:
 

gpainter

Quite Involved in Discussions
#7
The Engineering Department is usually the one that gives you the most trouble when it comes to standards. Its just their nature!!! I seen an article that said Professional Engineer, What an oxymoron. :eek:
 
T

tracey

#8
OOCH! I work in the engineering department, I don't think we are that bad. As far as engineering changes, when bolts are moved or any changes are made the prints are updated and given a new rev # and signed by the engineering manager.
 
#9
Michael T said,
"I'm revamping our Engineering department to finally conform to the Design & Development aspect of ISO 9001:2000."

Michael,
IMO the first problem I see is the word "I'm" in your problem statement.
Are you an engineer assigned to that department, if not, then you cannot revamp it. The only responsibility you have is to offer guidance on the requirements of the standard.
The only way it will work is to allow engineering to establish there own process, and when it comes time for an audit (or something worse), let the chips fall where they may.

I am reminded of this quote,
"Anyone who does the work for the caterpillar (enables) robs it of the strength it would have gained from the struggle."
 
M

Michael T

#10
Re: Document control and change

db said:



Just a thought here Michael, where does it say they can't make changes, review and approve changes at their level.

1) Are they doing this now?
2) If so, is it working?
3) If so, why not build this into the rules?


:confused:
Hi Dave....

Okay - to answer your questions: It doesn't say they cannot make, review & approve changes anywhere... that is the problem. The Engineering Dept. - for the most part - has been "hands off" by direction of the CEO & Pres. With the transition to 2000, there is no longer any choice...

1) Yes
2) Yes
3) That was my original intention - I just wanted to find out if I was way off base with engineering drawings and the level of control necessary. I knew they need to be controlled, disemination documented, have changes documented, be reviewed and approved, but because there are different "levels" and types of drawings - I wanted some feedback on how much control I need to exert over the system.

Sam said:

IMO the first problem I see is the word "I'm" in your problem statement.
Are you an engineer assigned to that department, if not, then you cannot revamp it. The only responsibility you have is to offer guidance on the requirements of the standard.
The only way it will work is to allow engineering to establish there own process, and when it comes time for an audit (or something worse), let the chips fall where they may.
Sam... you are quite right - and my mistake... I'm not "writing" their procedures - I'm providing the guidance in helping them put together the processes required for transition to 2000. This is where the question originally arose -- they were wondering if they needed to run ALL engineering drawings changes (not just the ones related to product & raw materials) through our formal Quality Management Team for review & approval. Since there is technically no established distinction between a drawing made for a product and a drawing made for a component to one of the machines - I couldn't give them a good response.

Thanks!!!

Cheers!
 
Thread starter Similar threads Forum Replies Date
R Controlling Quick Reaction Checklists Document Control Systems, Procedures, Forms and Templates 1
C Identifying and Controlling External Documents Document Control Systems, Procedures, Forms and Templates 3
qualprod Controlling documents in two different Applications ISO 9000, ISO 9001, and ISO 9004 Quality Management Systems Standards 10
M AS9100d Controlling External Provided Processes (purchasing 8.4) - The customer want us to use supplier X AS9100, IAQG, NADCAP and Aerospace related Standards and Requirements 3
qualprod Minor non-conformance for not controlling local regulation laws? ISO 9000, ISO 9001, and ISO 9004 Quality Management Systems Standards 20
QSM_Rick Controlling Multi-Tab Microsoft Excel Forms Excel .xls Spreadsheet Templates and Tools 5
C Controlling Software Versions that are part of a medical device IEC 62304 - Medical Device Software Life Cycle Processes 2
A ISO 13485 - Controlling Production and Service Provision - Product Catalogues ISO 13485:2016 - Medical Device Quality Management Systems 3
M Difficulties Controlling Foreign Suppliers Supplier Quality Assurance and other Supplier Issues 8
R OHSAS 18001:2007 Section 3 - Controlling Work Place Risks Occupational Health & Safety Management Standards 3
T Controlling an Excel Spreadsheet (Database) ISO 9000, ISO 9001, and ISO 9004 Quality Management Systems Standards 3
C ISO 9001:2008 4.2.3(f) - Controlling Documents of External Origin Quality Manager and Management Related Issues 9
M Controlling Flow Charts that are hung in workplace. Quality Manager and Management Related Issues 6
N Controlling Records query that may cause some serious trouble for me ISO 9000, ISO 9001, and ISO 9004 Quality Management Systems Standards 8
T Controlling Manual - Control of 10 Printed Manuals throughout our 9 Branches Document Control Systems, Procedures, Forms and Templates 8
Fender1 Controlling Documents and Records in a Custom Weld/Fabrication Company Document Control Systems, Procedures, Forms and Templates 10
C Tool Monitoring - Controlling a Process with Better Tool Monitoring Manufacturing and Related Processes 4
C Controlling QMS - We are expanding globally and want to keep our QMS Confidential Quality Manager and Management Related Issues 20
C Controlling Documents: Beyond the standard, how do we truly define what to control ISO 9000, ISO 9001, and ISO 9004 Quality Management Systems Standards 9
R Referencing and Controlling Labels & Stickers used internally throughout Production Document Control Systems, Procedures, Forms and Templates 1
Q Controlling Prints in Shop - Audit Finding Question ISO 9000, ISO 9001, and ISO 9004 Quality Management Systems Standards 4
L Controlling "Stamps" used throughout our processing Records and Data - Quality, Legal and Other Evidence 16
T Requirements - Controlling and Maintaining Sheet Metal Templates for Production Use ISO 9000, ISO 9001, and ISO 9004 Quality Management Systems Standards 5
P Controlling Solidworks model, CAD & Gerber files Document Control Systems, Procedures, Forms and Templates 3
M Defining and Controlling External Documents (Documents of External Origin) Quality Tools, Improvement and Analysis 5
M Controlling Temperature and Time - Do I need to calibrate the thermostat? IATF 16949 - Automotive Quality Systems Standard 4
S Controlling Documentation - Which procedures to control Document Control Systems, Procedures, Forms and Templates 12
C HACCP in Egg Production - Controlling hazards at the farm level Food Safety - ISO 22000, HACCP (21 CFR 120) 6
M Controlling Data Labels on Graphs - Number of Decimal Places Reported - Minitab Using Minitab Software 7
I Controlling Minitab by vba (visual basic) or vb Using Minitab Software 6
T Procedure for "Controlling Nonconformity" for a software company Document Control Systems, Procedures, Forms and Templates 2
R Controlling and monitoring of measuring devices - AS9100 General Measurement Device and Calibration Topics 3
D Establishing and controlling process capability - Meaning of Phrases Capability, Accuracy and Stability - Processes, Machines, etc. 2
E Controlling CNC Machine Programs - Your recommendations appreciated Manufacturing and Related Processes 12
T Controlling filled out "forms" (eg Operator job specific work instructions) Document Control Systems, Procedures, Forms and Templates 3
B Controlling Reference Material Document Control Systems, Procedures, Forms and Templates 1
J Controlling Temperature and Humidity in the CMM Room and does anyone use Artifacts? Inspection, Prints (Drawings), Testing, Sampling and Related Topics 8
R Procedure for Controlling Transmitted Technical Data - ITAR compliance Document Control Systems, Procedures, Forms and Templates 18
S Identifying and Controlling External Documents Document Control Systems, Procedures, Forms and Templates 8
Raffy Controlling Handler, Tester, Computer and other Equipment Manuals. Document Control Systems, Procedures, Forms and Templates 2
H Controlling Continuously Changing Forms IATF 16949 - Automotive Quality Systems Standard 12
W Controlling Revisions of External Documents - Documents of External Origin Document Control Systems, Procedures, Forms and Templates 10
A Controlling Humidity in a Textile Testing Laboratory General Measurement Device and Calibration Topics 10
M Polyurethane Foam Testing and Controlling the Foaming Process Manufacturing and Related Processes 6
Gert Sorensen Controlling a male 6% Luer with permanent collar according to EN1707? General Measurement Device and Calibration Topics 5
C Controlling External Customer Documents (Documents of External Origin) Document Control Systems, Procedures, Forms and Templates 5
L "Document Controlling" Queries run to obtain information reported to customer Document Control Systems, Procedures, Forms and Templates 7
A Still Confused About "Controlling Suppliers Records" AS9100, IAQG, NADCAP and Aerospace related Standards and Requirements 3
A Controlling the records of suppliers - AS9100 Rev B Clause 4.2.4 AS9100, IAQG, NADCAP and Aerospace related Standards and Requirements 2