Cpk for Solder Paste Height

alonFAI

Involved In Discussions
#1
Hi Guys,

I calculated process capability for solder paste height data.
I used the following ucl and lcl = 8.5 and 5
First, are these acceptable?
Second, the data fails for normality test (although the cp cpk are very good)
any suggestions? am I doing something wrong? Does solder paste height data must be distributed normally?

Thanks again to all!!:applause::bigwave::thanks:
Alon
 
Elsmar Forum Sponsor

Miner

Forum Moderator
Staff member
Admin
#2
Many processes do not follow the normal distribution, so this is not unusual. However, some processes that would otherwise follow a normal distribution may not if the process is unstable or if process streams are mixed. So you need to answer these questions:
  1. Are you mixing different process streams?
  2. Is the process stable (in control)?
  3. How is the solder paste applied? By screening?
 

alonFAI

Involved In Discussions
#3
Miner Hi,

First of all I wanna thank you for taking the time and answer all my questions!!!


  1. Are you mixing different process streams? :caution: What do you mean by mixing different process streams?
  2. Is the process stable (in control)?:caution: I'm not sure the machine is new but in general all the results are between 5 to 8.5 (for height) so I would say yes.
  3. How is the solder paste applied? By screening? :caution:Yes
another question, do you have any idea how should I calculate process capability for the solder paste volume? since the volume is determined by the size of the pad so the upper limit and lower limit cannot be set like in height....:thanks:
 

Steve Prevette

Deming Disciple
Staff member
Super Moderator
#4
Hi Guys,

I calculated process capability for solder paste height data.
I used the following ucl and lcl = 8.5 and 5
First, are these acceptable?
Second, the data fails for normality test (although the cp cpk are very good)
any suggestions? am I doing something wrong? Does solder paste height data must be distributed normally?

Thanks again to all!!:applause::bigwave::thanks:
Alon
The only data you've provided is the measurement data. What is the specification? No way for us to tell if the paste height is between 5 and 8.5 (units?) is "good" or "bad".

In order to even calculate a process capability, you need to know if the data are in control, you haven't stated if that is true or not. Also, are there any correlations in the data - that could through off normality and the use of SPC. This is also a one - sided distribution - height can't be less than zero, so that in itself may cause a failure of normality.

Definitely hard to tell if anything is "wrong" without seeing the SPC chart with the data and the specification, which I assume is two-sided.
 

Bev D

Heretical Statistician
Staff member
Super Moderator
#5
since the solder paste is screened on there will also be non-homogeneity in the data. each board type will have a different screen so the volume will vary from product to product, within a screen or board and from board to board.

A traditional Shewhart chart probably can't be used to demonstrate statistical stability.

I would recommend that the OP provide data for 3-5 pad locations within a board and 3 consecutive boards (ideally from 3 different set-ups of each board) from each of 3 different product types. a multi-vari chart can be used to assess the components of variation, determine homogeneity and stability.

I would also why the OP needs to calculate a Cpk value. is for a Customer requirement?
 

Miner

Forum Moderator
Staff member
Admin
#6
Process streams are multiple versions of the same process operation that creates a product characteristic. In your case the deposition of solder paste. Lets say that you have an IC chip with 120 leads. All 120 leads have the same nominal dimensions, but each have their own unique aperture in the solder stencil. Therefore, each have a slightly different average volume and are each a unique process stream. If similar enough, they might safely be combined without changing the distribution, but if different, mixing these 120 process stream could distort the underlying distribution.

In control, refers to whether the volumes, if plotted on a control chart (SPC) are comprised solely of common cause variation. In a stenciling operation, the stencil aperture dimensions are fixed, but the amount of paste applied may vary. Though the stencil thickness is fixed, there are still variables such under-filling, application pressure, solder age, etc. that may affect the thickness.
 
Thread starter Similar threads Forum Replies Date
Q Capability - CPk comparison values Capability, Accuracy and Stability - Processes, Machines, etc. 12
D Tolerance definition based on expected Cp/cpk Reliability Analysis - Predictions, Testing and Standards 14
K Analysis variation among the lots during cpk calculation. Design and Development of Products and Processes 1
S Recommendation for user friendly Gaga R&R and Cpk software Gage R&R (GR&R) and MSA (Measurement Systems Analysis) 10
A How to set up Continuous CpK monitoring of an injection mold process Reliability Analysis - Predictions, Testing and Standards 7
A Interpretation with regards to Ppk > Cpk Capability, Accuracy and Stability - Processes, Machines, etc. 14
U Cpk Calculation - I analyse a double seam cans Manufacturing and Related Processes 15
Proud Liberal Cp / Cpk on position using multiple MMC bonuses Capability, Accuracy and Stability - Processes, Machines, etc. 2
I Can we use pin gauges to measure an accurate Cpk ? Capability, Accuracy and Stability - Processes, Machines, etc. 9
T Final process capability results - What I am supposed to present? Cp and CpK? APQP and PPAP 11
F CpK on a manufactured assembly? Reliability Analysis - Predictions, Testing and Standards 7
M How is the Cmk and Cpk calculated? Statistical Analysis Tools, Techniques and SPC 0
O Cpk for Unilateral Tolerance Capability, Accuracy and Stability - Processes, Machines, etc. 7
B How to calculate CPK with n = 1 Manufacturing and Related Processes 2
O CPK with a P value less than 0.005 Manufacturing and Related Processes 8
A Short Term vs. Long Term SPC Study - Where is Cp and Cpk Defined Statistical Analysis Tools, Techniques and SPC 8
A Cpk Formula seems off, need help!? Capability, Accuracy and Stability - Processes, Machines, etc. 11
D Cp/Cpk on Gages for MSA (vs. Cg/Cgk) Capability, Accuracy and Stability - Processes, Machines, etc. 21
E Questions regarding Cpk Calculation - Should we be using LSL/USL or LCL/UCL? Capability, Accuracy and Stability - Processes, Machines, etc. 5
B Maximum Material Condition with Bonus - Determine Cpk for this one kpc Measurement Uncertainty (MU) 2
Hami812 Cpk Setting Tolerance - Cart before the Horse? (Wifi Routers) Capability, Accuracy and Stability - Processes, Machines, etc. 3
T Calculating LCL, UCL, Cp, and Cpk in an Excel Spreadsheet Statistical Analysis Tools, Techniques and SPC 3
Proud Liberal Cpk on Position w/ MMC on Location and Size Capability, Accuracy and Stability - Processes, Machines, etc. 3
E SPC Production - Getting Cpk and Ppk Statistical Analysis Tools, Techniques and SPC 8
S Track Cpk trend Statistical Analysis Tools, Techniques and SPC 5
M Cp & Cpk about a diameter measured with min.,max. and average values. Capability, Accuracy and Stability - Processes, Machines, etc. 13
P Non-normal Data Cpk Statistical Analysis Tools, Techniques and SPC 5
I As a part of validation, should i include the acceptance criteria of CPk index >1.33? Qualification and Validation (including 21 CFR Part 11) 4
T Cpk for 0 as Ideal Value Statistical Analysis Tools, Techniques and SPC 1
P Profile Tolerance and CPK Manufacturing and Related Processes 3
V When to use Cp Cpk and Pp Ppk Capability, Accuracy and Stability - Processes, Machines, etc. 4
M Calculating Cpk when sample size equals to 1 Capability, Accuracy and Stability - Processes, Machines, etc. 12
S CpK in Minitab when 0.0 is the lower spec limit Statistical Analysis Tools, Techniques and SPC 7
I Best way to Chart an On-Going CPK Requirement Capability, Accuracy and Stability - Processes, Machines, etc. 4
U Cpk for Contaminant Mass - Washing Parts Capability, Accuracy and Stability - Processes, Machines, etc. 6
G Help with Cpk procedure Capability, Accuracy and Stability - Processes, Machines, etc. 3
J Calculation of σ within subgroups for Cpk in Minitab Using Minitab Software 1
Sean Kelley Value of Ppk or Cpk when targeting thinner material Statistical Analysis Tools, Techniques and SPC 4
B How to validate Microsoft Excel Spreadsheet Calculations for the Cpk value Capability, Accuracy and Stability - Processes, Machines, etc. 9
D Calculating Cpk on Non-Normal Data Distribution Capability, Accuracy and Stability - Processes, Machines, etc. 10
D Cpk relation to Reliability Capability, Accuracy and Stability - Processes, Machines, etc. 4
B Process Capability - Changing Limits to Improve Cpk or find Root Causes? Capability, Accuracy and Stability - Processes, Machines, etc. 6
B Cpk vs Ppk to look at the Capability by Fixture Capability, Accuracy and Stability - Processes, Machines, etc. 4
R Convincing Management Cpk without Stability is Meaningless Capability, Accuracy and Stability - Processes, Machines, etc. 7
C Hardness Testing - Low Cpk's using Minitab Misc. Quality Assurance and Business Systems Related Topics 10
L Cpk after Data Transformation - How to Transform LCL /UCL to get Capability Report Capability, Accuracy and Stability - Processes, Machines, etc. 8
V Customer requires CpK 2 and PpK 1.5 Capability, Accuracy and Stability - Processes, Machines, etc. 2
G Ongoing Cpk and Global/Historical Data Statistical Analysis Tools, Techniques and SPC 7
R Which of the following indicators is important for Operations - Ppk, Cpk, or Cpm? Statistical Analysis Tools, Techniques and SPC 15