J
Joe Dixon
Hi,
I have a process here that has highlighted one unit displaying what i would call a critical defect. My lot size is 5,000 and i've put the remainder of the lot on hold.
Testing for this defect is destructive. I can affort to pull 2-300 from the lot for testing but want to present to those above me what level of confidence this will give me in the batch. I will fail the entire batch if another failure is found.
many thanks...
I have a process here that has highlighted one unit displaying what i would call a critical defect. My lot size is 5,000 and i've put the remainder of the lot on hold.
Testing for this defect is destructive. I can affort to pull 2-300 from the lot for testing but want to present to those above me what level of confidence this will give me in the batch. I will fail the entire batch if another failure is found.
many thanks...