Wallace MD
New user here...
We are a lean custom equipment design and manufacture division. After design output (ala drawings) are verified and approved for manufacture, the responsible production lead person does what he has to do to get the equipment built...the show must go on!
If he notes an error in the drawing/ schematic, but he is qualified to make necessary changes to make it work (e.g. different size bolt or electronic component), do we have to go through the complete design review mill before he resumes production?
Changes would be recorded on the drawing by the lead person and forwarded to design for revision at a later date.
We are a lean custom equipment design and manufacture division. After design output (ala drawings) are verified and approved for manufacture, the responsible production lead person does what he has to do to get the equipment built...the show must go on!
If he notes an error in the drawing/ schematic, but he is qualified to make necessary changes to make it work (e.g. different size bolt or electronic component), do we have to go through the complete design review mill before he resumes production?
Changes would be recorded on the drawing by the lead person and forwarded to design for revision at a later date.