Customer part number for PPAP - Chain of distributors involved - Catalogue items, too

G

Geese

Hello everyone,

I'm new to these threads and have piled on information from PPAP, MSA, and FMEA in the last week as an addition to my job description, so naturally I dont' know a thing, save for the forms to go to the customer.

My question is, what is the customer part number that will be used in the PPAP process when there is a chain of distributors between the manufacturing site and the final customer. I would like to think that each level in the chain would consist of a new supplier / customer relationship and that the next customer (distributor) would fulfill the role of supplier to their customer. However, when the PPAP gets to the bottom of the chain, the final customer kicks it back up through the ranks and responsibility for each part of the PPAP document becomes very foggy and dare i say argumentative. :argue:

Also, we sell a catalogued item which does not change. Yet, we are supposed to write the customer's part number on all forms and documentation? Wouldn't it be so much easier in this chain to just write the supplier part number in all these blanks and let the PSW accommodate for the changes in part numbers from manufacturer to distributor to final customer. (E.g. we write our part number on the PSW, the next distributor writes his, and so on...giving traceability). :confused:
 
G

Geese

The distributor above the end customer requested PPAP from us. And we requested it from the manufacturer above us.
 

Marc

Fully vaccinated are you?
Leader
So - Is the sequence:

You --> Distributor --> Requesting Customer
or
You --> Distributor --> Secondary Distributor --> Requesting Customer
 
G

Geese

The sequence is as follows:

Manufacturer -> Our company -> Distributor -> Customer.
 
M

Murph095

The part number may change at every level. The warrant your supplier gives you will contain the agreed upon p/N between you and them. Then the PPAP you supply to your customer can contain whatever P/N is agreed upon then and so on up. When we are either a tier 2 or tier 1 supplier and we are producing a final assy (service part) we try to use the OEM number just to be clear.


Murph
 
G

Geese

Thankyou both.

I'm going to post a separate post on another issue.
 
Thread starter Similar threads Forum Replies Date
I Restricting scope to one part number for one customer IATF 16949 - Automotive Quality Systems Standard 6
D IMDS for machining - Can my customer request a IMDS number for a part? APQP and PPAP 2
G AS9102 Design Supplier Part Number vs. Customer Part Number AS9100, IAQG, NADCAP and Aerospace related Standards and Requirements 2
S Customer Part Number Changes - Control Plan Question FMEA and Control Plans 1
K Resubmission of PSW required by customer because of part number change IATF 16949 - Automotive Quality Systems Standard 8
S Customer Defective Part Return Process Process Maps, Process Mapping and Turtle Diagrams 2
T Customer Rejecting Part for Basic Dimension Inspection, Prints (Drawings), Testing, Sampling and Related Topics 16
P Customer wants a Part Material Change - New PPAP required? APQP and PPAP 3
T Customer Requirement for Sorting - Visual Defect on Plastic Part IATF 16949 - Automotive Quality Systems Standard 9
Moncia Part Submission Warrant - Customer Requirements for PSW Submission APQP and PPAP 7
K APQP requirement when a new print or spec is received from a customer - Existing Part APQP and PPAP 3
L Customer requies 'Jet Test' on a Car Part (Electronics Connectors) Inspection, Prints (Drawings), Testing, Sampling and Related Topics 1
A Help me understand the applicability of 21 CFR Part 820.198 (Customer Complaints) 21 CFR Part 820 - US FDA Quality System Regulations (QSR) 3
S Customer Part Revision Change IATF 16949 - Automotive Quality Systems Standard 3
T Customer Escape of a part having features reversed 180 degrees Inspection, Prints (Drawings), Testing, Sampling and Related Topics 4
somashekar Reverse Engineering Customer Part to Manufacture - Can I include D&D in Scope? ISO 9000, ISO 9001, and ISO 9004 Quality Management Systems Standards 7
M Procedure for Handling Customer Return Part (Defective Part Return) IATF 16949 - Automotive Quality Systems Standard 1
S Do you assign your own part numbers to customer's parts? Manufacturing and Related Processes 10
ScottK Using Customer Audits as part of the Internal Audit Plan for ISO9001 ISO 9000, ISO 9001, and ISO 9004 Quality Management Systems Standards 12
S Inspection Kits for Each Customer Part: Calibration and Asset Control? General Measurement Device and Calibration Topics 1
A Best Way to Tolerance a Cylindrical Section on a Part (Customer's Design and Drawing) Inspection, Prints (Drawings), Testing, Sampling and Related Topics 4
K 21 CFR part 11 & CRM software (including customer support) Qualification and Validation (including 21 CFR Part 11) 5
M Material Certification Requirements for a Customer's Part Records and Data - Quality, Legal and Other Evidence 10
P PPAP Approval - Customer approval of PSW (part submission warrant) APQP and PPAP 5
S Ndc less than 5 (purchased part) - Auditor suggest I get waiver from customer Gage R&R (GR&R) and MSA (Measurement Systems Analysis) 8
Manix MTTF Prediction for Customer Requirements - Parts-count MTTF prediction for the part Reliability Analysis - Predictions, Testing and Standards 2
R Customer Corrective Action - Only one part and a cheap one at that ISO 13485:2016 - Medical Device Quality Management Systems 13
J Are email acceptable as records? Email for a customer approval of some part? Records and Data - Quality, Legal and Other Evidence 20
C Customer Focus Inventory - Take part in an experiment? Misc. Quality Assurance and Business Systems Related Topics 18
R ISO/TS16949, 8.2.1.1 Customer satisfaction - Delivered part quality performance IATF 16949 - Automotive Quality Systems Standard 4
J SPC on Multiple Cavities - Customer wants SPC done on each notch - Cylindrical part Statistical Analysis Tools, Techniques and SPC 16
T Customer Part Approval Process Manual? IATF 16949 - Automotive Quality Systems Standard 6
A Customer not willing to reveal the usage or function of the part to the supplier Philosophy, Gurus, Innovation and Evolution 18
M Developing a Leak Test - Housing part for an automotive customer Various Other Specifications, Standards, and related Requirements 7
J Part Approval - Eliminating Incoming Quality Inspection by Customer Inspection, Prints (Drawings), Testing, Sampling and Related Topics 4
F Customer Part Drawings - Is there any requirement as to where they are kept? Document Control Systems, Procedures, Forms and Templates 1
A API to download customer data from their portal? IT (Information Technology) Service Management 0
P Customer ISO13485 Audit - Changing Agenda ISO 13485:2016 - Medical Device Quality Management Systems 11
B Customer quality management system Reliability Analysis - Predictions, Testing and Standards 0
P Production location change by supplier without info to customer Benchmarking 16
Randy Oldest customer complaint known in the world Customer Complaints 5
M Voice of customer Manufacturing and Related Processes 5
Ashland78 IATF Process Control Plans not including customer name Manufacturing and Related Processes 13
T Reporting Adverse Events as Customer Complaints EU Medical Device Regulations 2
A Can a customer send a claim during PPAP? IATF 16949 - Automotive Quality Systems Standard 11
T Non-reportable customer complaints and CER EU Medical Device Regulations 2
G Customer complaint AS9100, IAQG, NADCAP and Aerospace related Standards and Requirements 22
GStough Suppliers Starting to Charge A Fee for Customer Audits Supplier Quality Assurance and other Supplier Issues 14
A Customer feedback ISO 13485:2016 - Medical Device Quality Management Systems 11
R VDA Potential Analysis - Similar product from other customer and confidentiality VDA Standards - Germany's Automotive Standards 0

Similar threads

Top Bottom