Greetings Elsmar People,

I have a little issue going on right now with one of my special processors (forgive me for not being more specific on what/who, but I will say they are AS/NADCAP certified) We sent them some parts to be treated recently and waited the usual lead time. They called us with two days left to the deadline asking for a material cert because they had no idea what this material (its not a common type but its also not unicorn hair.) was and didn't know how to treat it. This would be well and good if it was a first time job. The problem lies in the fact that they have done the same process to the same part with successful outcomes more than four times for us in the last 2 years:frust:. I had to go back into my system to give them their old PO'S to look up and they are still having a hard time getting it done. Any advice wise people of the Cove?
 

AndyN

Moved On
Greetings Elsmar People,

I have a little issue going on right now with one of my special processors (forgive me for not being more specific on what/who, but I will say they are AS/NADCAP certified) We sent them some parts to be treated recently and waited the usual lead time. They called us with two days left to the deadline asking for a material cert because they had no idea what this material (its not a common type but its also not unicorn hair.) was and didn't know how to treat it. This would be well and good if it was a first time job. The problem lies in the fact that they have done the same process to the same part with successful outcomes more than four times for us in the last 2 years:frust:. I had to go back into my system to give them their old PO'S to look up and they are still having a hard time getting it done. Any advice wise people of the Cove?

Yes! You know who their CB is, so write and tell them the situation. Clearly, they don't have a robust Contract Review process (or much after that) and aren't "customer focused" to have a job in there without someone asking WTH? The auditor SHOULD check on this process. Also, issue the supplier a complaint. Formally.

Good luck!
 
S

SvanRaay

I would always suggest sending a current copy of the drawing of the part with your purchase order. This way the information the process house requires is available. This will also help with any masking issues, surface finish issues, or tight tolerance issues.
 
P

PaulJSmith

Sounds to me like your supplier is having some other problem, and is using this as an excuse for the delay.
 
Q

qualitypirate

The situation resembles a key employee turnover symptom, with the new kid / team slow to come up to speed regarding tribal knowledge.
Thats what it felt like to me, so I was hesitant to burn a possibly new person who might have inherited a mess.
 

AndyN

Moved On
Thats what it felt like to me, so I was hesitant to burn a possibly new person who might have inherited a mess.

So, may I ask, what is their QMS for? Isn't is a risk to have someone who is likely NOT to "get" this tribal knowledge? Doesn't AS ask them, as a supplier to identify such risks. You may have lost sight of what their QMS and certification are supposed to do. If they throw someone new under the bus, I'd be looking for another processor, since they don't understand and, frankly, shouldn't HAVE an AS certificate!
 
Q

qualitypirate

So, may I ask, what is their QMS for? Isn't is a risk to have someone who is likely NOT to "get" this tribal knowledge? Doesn't AS ask them, as a supplier to identify such risks. You may have lost sight of what their QMS and certification are supposed to do. If they throw someone new under the bus, I'd be looking for another processor, since they don't understand and, frankly, shouldn't HAVE an AS certificate!
I'm leaning towards filing a complaint with the processor and giving them a chance to fix their issue.
 

John Broomfield

Leader
Super Moderator
It may be worth determining with your supplier how best to invoke their work order that results in you receiving what you ordered on time.

The old-fashioned "plug-in" instead of ships passing in the night.
 

normzone

Trusted Information Resource
I wouldn't think of it as a complaint. I'd see it as tasking them to provide you a cause and corrective action report.
 
Thread starter Similar threads Forum Replies Date
Sidney Vianna Interesting Discussion IAF Mandatory Document for the Harmonization of Sanctions and Dealing with Fraudulent Behaviour ASQ, ANAB, UKAS, IAF, IRCA, Exemplar Global and Related Organizations 3
M MSA - Dealing with inherent within-part variation in assemblies Gage R&R (GR&R) and MSA (Measurement Systems Analysis) 1
G Dealing with non conformity caused by Supplier Components detected in the production line IATF 16949 - Automotive Quality Systems Standard 14
K Tips for dealing with third party auditors General Auditing Discussions 11
C Specification + MU - Dealing with reported MU Values Measurement Uncertainty (MU) 6
F Dealing with, and Analysis of, Data Statistical Analysis Tools, Techniques and SPC 6
R Dealing with Device/Design changes by a "Letter to File" vs. 60601 Retesting IEC 60601 - Medical Electrical Equipment Safety Standards Series 10
Sidney Vianna Cleaning up the Global Compact: Dealing with Corporate Free Riders Sustainability, Green Initiatives and Ecology 2
J Integrated Management System - Anyone with experience dealing with ISOQAR? ISO 9000, ISO 9001, and ISO 9004 Quality Management Systems Standards 2
R Transforming or not Transforming - Dealing with Non-Normal Data Statistical Analysis Tools, Techniques and SPC 10
G Dealing with Excessive Within-Part Variation when doing MSA and Cpk studies Gage R&R (GR&R) and MSA (Measurement Systems Analysis) 3
S Auditing Career: Dealing with Mentally Unstable Managers Career and Occupation Discussions 7
K Has anyone had experience dealing with SEDEX (Supplier Ethical Data Exchange)? Customer and Company Specific Requirements 4
P Hard Milling Process - Dealing with Within Part Variation for SPC Statistical Analysis Tools, Techniques and SPC 18
optomist1 Real World SPC Dealing with Outliers Statistical Analysis Tools, Techniques and SPC 22
P Advice on dealing with difficult Colleagues Career and Occupation Discussions 24
R Effects of Dealing with Out of Tolerance Monitoring Equipment General Measurement Device and Calibration Topics 4
Z Dealing with a defiant Operations Manager Quality Manager and Management Related Issues 41
ScottK Are any other USA manufacturers dealing a lot with ARRA requests? Various Other Specifications, Standards, and related Requirements 6
N Nissim Shaked is dealing with these topics at his desk Imported Legacy Blogs 14
D Dealing With a Chinese Supplier to follow up on quality problems Quality Manager and Management Related Issues 26
D Dealing with pesky telemarketers Coffee Break and Water Cooler Discussions 4
B Dealing with Outsourced Processes in a DMR ISO 13485:2016 - Medical Device Quality Management Systems 7
Marc Government of Mozambique - Dealing with Lions Funny Stuff - Jokes and Humour 14
P Dealing with Second Party Audits Quality Manager and Management Related Issues 6
R Service Company dealing with FAI requirements - Small stocklist broker AS9100, IAQG, NADCAP and Aerospace related Standards and Requirements 8
A Is zero defects possible? We are dealing with 25 to 30 parameters Quality Tools, Improvement and Analysis 21
Marc Advisory Notices - Who is responsible for dealing with Advisory Notices? ISO 13485:2016 - Medical Device Quality Management Systems 7
S Process of dealing with the Customer - PRRs, GQTS Nonconformance and Corrective Action 5
samer Oracle computer records - Special procedure for dealing with non-paper Records? Records and Data - Quality, Legal and Other Evidence 2
A Capability Analysis - Dealing with non-normal data in Minitab Using Minitab Software 8
Douglas E. Purdy Dealing with Procurement Documentation and an Industry Conglomerate General Auditing Discussions 4
P Dealing with recruiters: What if a job is listed after.... Career and Occupation Discussions 17
P Recently Certified!! One minor finding dealing with Dock Audits IATF 16949 - Automotive Quality Systems Standard 11
T Industrial Belt Sander Systems - Dealing with chatter marks Manufacturing and Related Processes 5
B Dealing with dishonest customers - One customer who is a supplier - Bad Material Supplier Quality Assurance and other Supplier Issues 16
A Dealing with Possible Alcohol Use by Employees in the Work Place Misc. Quality Assurance and Business Systems Related Topics 23
B Published standards dealing with calibration of pressure and vacuum gauges? General Measurement Device and Calibration Topics 5
1 Stubborn and Forgetful G.M. - Meetings for 8D's Issued for his resolvement Nonconformance and Corrective Action 5
L CQI-9 Special Process: Heat Treat System for Sinter parts IATF 16949 - Automotive Quality Systems Standard 0
J Special Characteristic Symbols On FCA Drawings Inspection, Prints (Drawings), Testing, Sampling and Related Topics 4
L CQI-30 Special Process: Rubber Processing System Assessment - Mixing & Molding IATF 16949 - Automotive Quality Systems Standard 4
V Sample Size rationale to reduce size and use special levels EU Medical Device Regulations 6
Z 10993-7 Special Populations and Area Other Medical Device Related Standards 1
S Defining special characteristics beyond customer drawing FMEA and Control Plans 11
N 8.3.3.3 Special characteristics - Auditor said we are required to create our own, if no customer char. exist. IATF 16949 - Automotive Quality Systems Standard 10
G Special needs operators : how to treat trainings and etc ISO 9000, ISO 9001, and ISO 9004 Quality Management Systems Standards 4
S Traditional or Special 510(k) US Food and Drug Administration (FDA) 7
D 8.5.1.2 Validation and control of special processes requirements for Heat Treat External Processor AS9100, IAQG, NADCAP and Aerospace related Standards and Requirements 4
Casana Mentioning Special Characteristics in SOP FMEA and Control Plans 4

Similar threads

Top Bottom