Hello all,
I am looking to define performance metrics for DFMA implementation.
Specifically, what are specific metrics/K.P.I. which can be leveraged by Design Engineers to communicate that DFMA methodologies are being implemented during the design phase.
Would it always have to be after the fact? For example, evaluating the number of ECOs generated during the drawing approval stage due to manufacturability issues. I'm trying to think of performance measures that can be collected during the design period.
Appreciate any help on this.
I am looking to define performance metrics for DFMA implementation.
Specifically, what are specific metrics/K.P.I. which can be leveraged by Design Engineers to communicate that DFMA methodologies are being implemented during the design phase.
Would it always have to be after the fact? For example, evaluating the number of ECOs generated during the drawing approval stage due to manufacturability issues. I'm trying to think of performance measures that can be collected during the design period.
Appreciate any help on this.