Delivery Transportation - Asking about outsourced process clause 4.1

B

blue moon

#1
Dear Friends

i am working at lamp factory the delivery of lamp to market is not outsourced process


every agent come to the factory with his car and loading the lamp and transport it to his store

may be in the transportation the lamp had been defect due to his speed or his driven

and may be the end user find that the lamp is not working when he buy it from the agent

so , i ask .have i a commitement to control and evalute the transportation of lamp ?

and is this belong to outsourced process ?

thanks
 
Elsmar Forum Sponsor

Stijloor

Leader
Super Moderator
#2
Re: Asking about outsourced process clause 4.1

Does the "agent" buy the product from you? If yes, then your company's responsibility for handling the product may end when the agent takes possession. Any damage as a result of rough handling will be his. Your responsibility for the quality of the product may not end obviously.

So, when the agent owns the product and transports his merchandise to his store, it is not an outsourced process.

Did I answer your question? If not, please let me know.

Stijloor.
 
Last edited:
P

Pankaj Kumar

#3
Dear Friends

i am working at lamp factory the delivery of lamp to market is not outsourced process


every agent come to the factory with his car and loading the lamp and transport it to his store

may be in the transportation the lamp had been defect due to his speed or his driven

and may be the end user find that the lamp is not working when he buy it from the agent

so , i ask .have i a commitement to control and evalute the transportation of lamp ?

and is this belong to outsourced process ?

thanks
Transporting in the present case is not an outsourced process-for one, you are not paying for it-secondly, you are selling your product Ex-works. You have neither ethical nor legal resposibility for any damage occuring due to mis-handling during transport. But you have to ensure that every lamp is defect free before loading. (To the best of my knowledge, there is 100% inspection for lamps).

2. It is not in your hands to control the transportation system of your agents. You may on your own, evaluate and suggest improvement in transport system. Another area for improvement could be packaging.

Pankaj
 
B

blue moon

#4
thanks

first question :
if i pay for indivedual drivers to transport lamp is this will outsourced process

secone question :
even the agent purchased the lamp from the factory but i think every customer will have a defect lamp will claim my factory not the agent , and this will be a bad matter for product and its name , because bad transportation may affect the life time of lamp


third question
what the different between purshaced serivces and outsourced process
 
Thread starter Similar threads Forum Replies Date
M Is On-Time Delivery a Quality Objective? AS9100, IAQG, NADCAP and Aerospace related Standards and Requirements 16
A Traceability unequal lots/batches delivery production IATF 16949 - Automotive Quality Systems Standard 8
S On-time delivery CRITERIA AS9100, IAQG, NADCAP and Aerospace related Standards and Requirements 8
L On Time Delivery - what percentage is the norm? AS9100, IAQG, NADCAP and Aerospace related Standards and Requirements 28
Q Customer Satisfaction through On-Time Delivery ISO 9000, ISO 9001, and ISO 9004 Quality Management Systems Standards 9
qualprod On Time Delivery KPI for sales? ISO 9000, ISO 9001, and ISO 9004 Quality Management Systems Standards 5
M Informational US FDA Final Guidance – Intravascular Catheters, Wires, and Delivery Systems with Lubricious Coatings – Labeling Considerations Medical Device and FDA Regulations and Standards News 0
DuncanGibbons Why is 8.4 post-delivery activities before 8.6 release of products and services in AS9100D? AS9100, IAQG, NADCAP and Aerospace related Standards and Requirements 5
S Medical Device Initial Importer (DII) Requirements - Delivery Address 21 CFR Part 820 - US FDA Quality System Regulations (QSR) 1
AnaMariaVR2 Pharmaceuticals News Transdermal and Topical Delivery Systems: FDA & EMA Guidance US Food and Drug Administration (FDA) 0
D Delivery Schedule Performance - IATF 16949 Cl. 9.1.2.1-d IATF 16949 - Automotive Quality Systems Standard 3
N Where I can find an Excel sample/template for recording Delivery Time and Cost Excel .xls Spreadsheet Templates and Tools 2
Y What Clinical Data is required for Drug Delivery System EU Medical Device Regulations 1
Pmarszal Delivery Confirmation? Do we need to save? 21 CFR Part 820 - US FDA Quality System Regulations (QSR) 3
B AS9100 Scope of Registration - Post-Delivery Activities N/A? AS9100, IAQG, NADCAP and Aerospace related Standards and Requirements 9
K What can be considered a "Post Delivery Activity" (ISO 9001:2015 Clause 8.5) ISO 9000, ISO 9001, and ISO 9004 Quality Management Systems Standards 18
W Business Procedure/Service Delivery Procedure Design and Development of Products and Processes 8
S Boss wants customer delivery signature specimen form Customer and Company Specific Requirements 16
L OTD (On Time Delivery) Tracking and Reporting Misc. Quality Assurance and Business Systems Related Topics 13
A Outsourced Processes Control (Finished Medical Device Delivery, Storage) ISO 13485:2016 - Medical Device Quality Management Systems 10
M Partial Incoming (Receiving) Inspection Delivery Inspection. Inspection, Prints (Drawings), Testing, Sampling and Related Topics 4
M Calculating Capability of Delivery Performance Capability, Accuracy and Stability - Processes, Machines, etc. 5
E Clinical Evaluation Report for a Delivery System ISO 13485:2016 - Medical Device Quality Management Systems 2
R Service Delivery Quality Tracker Document Control Systems, Procedures, Forms and Templates 2
S ANOVA and Test Method Validation for a Drug Delivery Device Statistical Analysis Tools, Techniques and SPC 4
B Is there a necessity of two sets of KPIs for Delivery Process Quality Manager and Management Related Issues 15
K ISO 9001 vs AS9100 Gap Analysis on Delivery Performance and Document Control AS9100, IAQG, NADCAP and Aerospace related Standards and Requirements 5
K AS9100 Post Delivery Support Template AS9100, IAQG, NADCAP and Aerospace related Standards and Requirements 2
B Corrective Action for Deviation (delay) in the Delivery Schedule Quality Manager and Management Related Issues 10
armani 2 Aspects of Services Design - Design of the Service and Design of Service Delivery Service Industry Specific Topics 2
S How do you Calculate On Time Delivery? Misc. Quality Assurance and Business Systems Related Topics 17
J Relationship between Quality, Reliability, Price and Delivery Misc. Quality Assurance and Business Systems Related Topics 7
M Understanding AS9100 Clause 7.5.1.4 Post-Delivery Support Requirements AS9100, IAQG, NADCAP and Aerospace related Standards and Requirements 5
T CAR (Corrective Action Request) for On Time Delivery Nonconformance and Corrective Action 9
S Delivery Process Owner(s) in an IT Company ISO 9000, ISO 9001, and ISO 9004 Quality Management Systems Standards 6
M Delivery Routing VRP (Vehicle Routing Problem) Problem Service Industry Specific Topics 2
D Route Delivery Efficiency Formula - Miles driven, number of deliveries, and time(hrs) Benchmarking 3
M Supplier Rating Form with Quality, Cost, Delivery wanted Document Control Systems, Procedures, Forms and Templates 4
D "On Time Delivery" Flowdown from Large Corporation AS9100, IAQG, NADCAP and Aerospace related Standards and Requirements 6
Q AS9100B Clause 7.5.1.5 - Where did it go in AS9100C? Servicing/Post Delivery Support AS9100, IAQG, NADCAP and Aerospace related Standards and Requirements 1
A Delivery Terminology - When is a product considered "Delivered" AS9100, IAQG, NADCAP and Aerospace related Standards and Requirements 7
S On Time Delivery - Non conformance? Root Causes, Corrective Actions ISO 9000, ISO 9001, and ISO 9004 Quality Management Systems Standards 10
E Use of MS Excel for Customer Delivery Tracking Statistical Analysis Tools, Techniques and SPC 6
L Lateness Delivery Notice to Customer ISO 9000, ISO 9001, and ISO 9004 Quality Management Systems Standards 7
Q Shipping Measurements (Measurables) other than On-Time Delivery ISO 9000, ISO 9001, and ISO 9004 Quality Management Systems Standards 4
Ajit Basrur Dashboard Software for representing Quality Metrics like DPPM, On Time Delivery, etc. Quality Tools, Improvement and Analysis 4
F Concentrate Delivery System for Hemodialysis - MDD Classification EU Medical Device Regulations 6
H On Time Delivery Report and Tracking spreadsheet template Excel .xls Spreadsheet Templates and Tools 2
D Performance Measurement Data ? Delivery Process Statistical Analysis Tools, Techniques and SPC 2
M Excel sheet for calculating Measurement of Delivery Performance Lean in Manufacturing and Service Industries 2

Similar threads

Top Bottom