Richard Olson said:
The difference here is what you are being asked to do. If a contractor is asked to do the design, then yes, the contractor is design responsible. If the contractor is provided the design and told to build to the design, then the contractor is not responsible.
If, no independent design is taking place at the contractor's and all dimensions/characteristics are defined by the customer, with the contractor being responsible for production only.