A
AJPaton
Hullo,
I've gotten back into an engineering position with design functions. Our company is ISO certified, but the product line I'm on is new with a single customer. We're merging our system as much as possible with theirs, which complicates many lives, while simplifying our customer's.
This leaves us with a certain amount of flexibility at this time concerning design documentation. Especially design review in conjunction with contract review. (We're working closely with the customer to produce new designs.)
Any suggestions, warnings or insights on this? :mg: This is the first time I've been involved in such a cooperative venture between a customer and supplier.
Thanks,
AJP
I've gotten back into an engineering position with design functions. Our company is ISO certified, but the product line I'm on is new with a single customer. We're merging our system as much as possible with theirs, which complicates many lives, while simplifying our customer's.
This leaves us with a certain amount of flexibility at this time concerning design documentation. Especially design review in conjunction with contract review. (We're working closely with the customer to produce new designs.)
Any suggestions, warnings or insights on this? :mg: This is the first time I've been involved in such a cooperative venture between a customer and supplier.
Thanks,
AJP