A
We know the design traceabiity matrix is very important. But if we just take some activities in whole design, just re-design the schematic and layout based on origina schematic and layout, no verification, no validation, should we do design traceability matrix? All schematic and drawing are reviewed and approved by customer, no intended use, no product requirements, should we do design trace?