I have a doubt, which activity of the APQP process includes design verification? This verification is a requirement of ISO 9001 (8.3.4) and API SPECIFICATION Q1 10thED (5.4.7).
I have a doubt, which activity of the APQP process includes design verification? This verification is a requirement of ISO 9001 (8.3.4) and API SPECIFICATION Q1 10thED (5.4.7).
Since DFMEA is intended to be preventative, to have maximum impact, it should be done prior to completion of the design so any design changes driven by the DFMEA can be done easily with minimum cost. Therefore, it should be done prior to design verification. Regarding prototype, many items in APQP may be done in parallel, so this may depend on whether a prototype is needed to complete design verification or not.
This site uses cookies to help personalise content, tailor your experience and to keep you logged in if you register.
By continuing to use this site, you are consenting to the use of cookies.