1.2.1 Significant Production Run
To adequatly determine if we have meet the customer requirements (the parts are correct) we have to cut them to test them.
section 1.2.1 Significant Production Run, states that a run of 300 parts is required.
Is this for statistical studies at our facility or for submission to the customer?
We are preparing a PPAP for a customer and the part has to have a certain case depth hardness. To follow 1.2.1 w would have to cut 300 parts.
The truck industry allows as small a sample as 30 pieces.
I may be confusing issues.
Mike W