Development of a WPS / Qualification Test Records for D17.1

S

spectredotsix

#1
Hello All,

I had a question about WPS and Qualification test records, etc. for the AWS Standard D17.1

How do we go about establishing a WPS, and when the company welders perform test weldments at various thicknesses of each alloy group, do we fill out the Qualification Test Record form for them and send this to an NDT facility with CWI's for Visual / NDT Testing? What specific tests are they required to perform, and are they supposed to sign the "Qualifier" portion of the form?

I just started work on quality engineering for an FAA Repair Station, and it is approaching the time for the welder recertification and such. Any light on the situation would help me establish and formalize the welding setup we have at our facility. Thanks in advance. :thanx:

-Charlie
 
Elsmar Forum Sponsor
T

tonefordays

#2
Before proceeding, I would suggest getting a copy of AWS D17.1 (latest edition) if you haven't already and also AWS B2.1.

When creating a Welding procedure specification (WPS), it's crucial that you capture all the essential variables related to the welding process plus whatever additional requirements (if any) the customer may require, or if there is any preheating, or post welding heat treating involved. AWS D17.1 doesn't provide much in regard to these essential variables, but rather references AWS B2.1 Standard for welding procedure and performance qualification. This standard will provide more in depth information regarding the requirements for procedure qualification.

Some things to consider when creating a WPS are;

-Welding Process (GTAW,GMAW, etc)
-Manual, Auto etc.
-Backing (if used)
-Material type and specification
-Material thickness
-Filler metal type and classification
-Filler metal size
-Welding position
-Joint detail (groove, fillet, etc)
-Shielding gas(s)
-Flowrate
-Preheat info (if applicable)
-Post weld heat treat (if applicable)
-Tungstes size/type (GMAW)
-Mode of metal transfer (GMAW)
-Amperage
-Voltage
-Travel speed
-Electrical current (AC or DC)

This is an abbreviated list, but considering the amount of variables involved, it's important that everything is captured. Remember, the WPS is basically a "recipe" for the welder to follow which allows them to produce an acceptable weld with a given process and base metal. The more information available, the better the chances of success.
If you?re not sure, you can always call the testing facility you plan on using, and they may provide you with some useful information.

Hope this helps.
 
A

Aluminumship

#3
tonefordays, just finished my cwi training and the company wants me to do wps..any suggestion how to start creating wps?
 
T

tonefordays

#4
First thing you'll need to know is what code you will be working with?

In the code you will find all the essential variable information needed on the WPS. But before you get too far ahead of yourself, some basic things that will need to be determined ahead of time are, material type, thickness, process, position, joint configuration, shielding gas (if applicable), filler metal type and size. Knowing this will help you find the requirements within the code. Remember the WPS is a recipe for the welder to follow to be successful, so any welder should be able to read and understand the information that is on the WPS, so you'll want to make sure it's clear and easy to understand.
The code books have recommended forms you can use for your WPS/PQR, however keep in mind these are minimum requirements, and may not fully capture all the information for your particular situation. You can add more requirements than what is shown on the form, if your situation requires it, however if there is no need for additional requirements, I would keep it as simple as possible.
Writing a WPS can be a little time consuming, however if you do a little homework ahead of time, things should fall into place. Also, AWS B5.1 does requires that a CWI be able to interpret and understand a WPS, however it is not a requirement that a CWI know how to create a WPS. That would fall under the responsibility of a SCWI or the employer.
Once you have put together a preliminary WPS, discuss it with your employer or welders and make necessary changes. When everyone is in agreement, it's time to move on the the PQR where you will witness the welding and the variables.
Before the welder strikes an arc, it is very important that they understand what YOU expect from them during the test so there aren't any surprises.
If doing a multi pass weld, the welder needs to know that EVERY welding pass needs to pass a visual welding inspection to the code requirements. If one pass does not meet the requirements, it should be decided before the test begins if grinding or any type of rework is allowed. AWS D1.5 is the only code I know of that does not allow the use of any power tools during the test. If you feel the work being performed in your shop should or shouldn't allow for the use of power tools during welding, be sure everyone is in full agreement before starting the test.
When I administer a welding test, I don't allow for any leniency. Typically they are working in "ideal" situations with clean metal and good fit up so if they struggle with that, it's only going to be more difficult in the shop or in the field where often times they don't have ideal situations.

Hope that helps.
 
#5
Before proceeding, I would suggest getting a copy of AWS D17.1 (latest edition) if you haven't already and also AWS B2.1.

When creating a Welding procedure specification (WPS), it's crucial that you capture all the essential variables related to the welding process plus whatever additional requirements (if any) the customer may require, or if there is any preheating, or post welding heat treating involved. AWS D17.1 doesn't provide much in regard to these essential variables, but rather references AWS B2.1 Standard for welding procedure and performance qualification. This standard will provide more in depth information regarding the requirements for procedure qualification.

Some things to consider when creating a WPS are;

-Welding Process (GTAW,GMAW, etc)
-Manual, Auto etc.
-Backing (if used)
-Material type and specification
-Material thickness
-Filler metal type and classification
-Filler metal size
-Welding position
-Joint detail (groove, fillet, etc)
-Shielding gas(s)
-Flowrate
-Preheat info (if applicable)
-Post weld heat treat (if applicable)
-Tungstes size/type (GMAW)
-Mode of metal transfer (GMAW)
-Amperage
-Voltage
-Travel speed
-Electrical current (AC or DC)

This is an abbreviated list, but considering the amount of variables involved, it's important that everything is captured. Remember, the WPS is basically a "recipe" for the welder to follow which allows them to produce an acceptable weld with a given process and base metal. The more information available, the better the chances of success.
If you?re not sure, you can always call the testing facility you plan on using, and they may provide you with some useful information.

Hope this helps.
Does anyone have sample GMAW WPS?
 

hogheavenfarm

Quite Involved in Discussions
#6
There are numerous sample forms online at several testing sites, Earlbeck is one, WPS America, Weld Consultants, LLC all have examples. Check for PreQualified Weld Procedures as well, there should be plenty available for GMAW and SMAW. As far as I am aware, there are no prequalified procedures for GTAW. D1.1 has the most, D1.6 may have a few.
 
Thread starter Similar threads Forum Replies Date
D Using Laboratory Notebooks in R&D and Design and Development ISO 13485:2016 - Medical Device Quality Management Systems 3
D ISO 13485 - 7.3.6 Design and development verification - Do most folks create a separate SOP? ISO 13485:2016 - Medical Device Quality Management Systems 4
M Clinical Development Plan - Advice Requested EU Medical Device Regulations 8
S Are risks in supply chain and development activities within scope of MDD? EU Medical Device Regulations 3
M QA/RA Professional Development Suggestions Training - Internal, External, Online and Distance Learning 6
N ISO 19011:2018 - 5.4.2 "...audit program should engage in appropriate continual development..." Training - Internal, External, Online and Distance Learning 4
DuncanGibbons Resources for aiding in procedure, work instruction and manufacturing plan development and management AS9100, IAQG, NADCAP and Aerospace related Standards and Requirements 0
L Design & Development of a SERVICE Service Industry Specific Topics 13
T Design Control Procedures later in the Development Process ISO 13485:2016 - Medical Device Quality Management Systems 6
K Old medical devices -> 7.3.7. Design and development validation ISO 13485:2016 - Medical Device Quality Management Systems 1
M Design Development MDR Design and Development of Products and Processes 0
O How can I justify excluding the R&D group and the design and development clause? ISO 9000, ISO 9001, and ISO 9004 Quality Management Systems Standards 4
Ajit Basrur ISO 22379 for citywide events now in development General Information Resources 1
D CE Marking Requirements MDD & MDR - new product development covered under same scope EU Medical Device Regulations 1
G Strategy for IEC62304 implementation half way into the software development process IEC 62304 - Medical Device Software Life Cycle Processes 9
M Informational EU – Ongoing Guidance development within MDCG Subgroups Medical Device and FDA Regulations and Standards News 1
F Software development plan for SW update IEC 62304 - Medical Device Software Life Cycle Processes 2
C IATF 16949 8.3 Exclusion - Manufacturing process design and development IATF 16949 - Automotive Quality Systems Standard 5
M Software Development Company - Who would own the whole process and the certification afterwards? ISO 14001:2015 Specific Discussions 1
A Design and development of products and services ISO 9000, ISO 9001, and ISO 9004 Quality Management Systems Standards 2
O Software development plan : development methods IEC 62304 - Medical Device Software Life Cycle Processes 2
S ISO 9001 Clause 8.3 - Design & Development for training course center ISO 9000, ISO 9001, and ISO 9004 Quality Management Systems Standards 7
S ISO 9001:2015 & ISO 14001:2015 - I need a format for Design & Development planning ISO 14001:2015 Specific Discussions 2
K Templates for software development quality audit Document Control Systems, Procedures, Forms and Templates 1
DuncanGibbons Are there aerospace standards for the development and manufacture of euipment and tools? AS9100, IAQG, NADCAP and Aerospace related Standards and Requirements 3
L AS9100 and Agile development processes AS9100, IAQG, NADCAP and Aerospace related Standards and Requirements 8
D Electrical Safety During Medical Device Development IEC 60601 - Medical Electrical Equipment Safety Standards Series 3
S How to consider the relevant standards during development of ISO13482:2016 for IVD manufacturing Blood grouping Other Medical Device Related Standards 6
D Medical device development - Custom test equipment ISO 13485:2016 - Medical Device Quality Management Systems 3
M Informational US FDA – Device Shortages Update: Challenges to encourage the development of new approaches to device sterilization Medical Device and FDA Regulations and Standards News 0
AlienraverX Design and Development Audit ISO 9000, ISO 9001, and ISO 9004 Quality Management Systems Standards 11
S Do we need to validate Software used in Drug discovery and development process? Qualification and Validation (including 21 CFR Part 11) 2
I QMS documents required at each stage of Software development IEC 62304 - Medical Device Software Life Cycle Processes 5
V Who should define and own the Design and Development Plan and how to maintain the updates and revisions. ISO 13485:2016 - Medical Device Quality Management Systems 2
S Development of 2xMOPP galvanic isolator for USB-connected device IEC 60601 - Medical Electrical Equipment Safety Standards Series 9
K Design and Development Exclusion Quality Management System (QMS) Manuals 1
V Exclusion of 'Design and Development' from scope of certification ISO 13485:2016 - Medical Device Quality Management Systems 9
H Supplier Development - Distributors only? The new GM Standards IATF 16949 - Automotive Quality Systems Standard 4
cscalise Determination of CPD (Continuing Professional Development) hours for a training course Training - Internal, External, Online and Distance Learning 1
XRAY_3121 Design and Development Requirement - MDSAP Audit Finding Other Medical Device Regulations World-Wide 5
Ed Panek Splitting UI (User Interface) into two development paths 21 CFR Part 820 - US FDA Quality System Regulations (QSR) 4
K Capturing local government development/planning activities in aspect register ISO 14001:2015 Specific Discussions 2
I ISO-9001:2015 - direction on New Product Development? ISO 9000, ISO 9001, and ISO 9004 Quality Management Systems Standards 7
M Informational FDA Qualifies First Biomarker Test as Part of Medical Device Development Tools (MDDT) Program Medical Device and FDA Regulations and Standards News 0
M Charging consulting fees for SOP development and guidance Document Control Systems, Procedures, Forms and Templates 13
S Internal Audit Checklist for Application/Software development IEC 27001 - Information Security Management Systems (ISMS) 1
P Performance evaluation (IVDD Annex VIII) & Design and Development Validation Studies EU Medical Device Regulations 1
M Informational USFDA Final Guidance – Coordinated Development of Antimicrobial Drugs and Antimicrobial Susceptibility Test Devices Medical Device and FDA Regulations and Standards News 0
M 8.3.2.3 Development of products with embedded software - request for clarification IATF 16949 - Automotive Quality Systems Standard 1
S Waterfall model or v-model design and development ISO 13485:2016 - Medical Device Quality Management Systems 2

Similar threads

Top Bottom