P
I am the QA manager for a small retail apparel company and everything that I'm learning is self taught OJT (which is not much at all) and need assistance calculating the following:
AQL
AOQ
AOQL
PROCESS AVERAGE
operating characteristic
Probability of accepting a lot
Manufacturing is farmed out. We don't build anything in house.
Inspection is only performed after the product is made and delivered to us. There is no inspection of components or du-pro inspection at this time.
We receive anywhere from 300 to 2000 units of any one style. Most of the time it is in the 500-600 units.
Based on a 500 unit delivery and a normal inspection level, we are to inspect 50 units. Sometimes, due to one reason or another out of my control, we only have time to inspect a portion of that amount. Do the formulas take into account this variable or must every unit be inspected (50 units)?
We have a visual pass/fail inspection and a measurement portion.
AQL
AOQ
AOQL
PROCESS AVERAGE
operating characteristic
Probability of accepting a lot
Manufacturing is farmed out. We don't build anything in house.
Inspection is only performed after the product is made and delivered to us. There is no inspection of components or du-pro inspection at this time.
We receive anywhere from 300 to 2000 units of any one style. Most of the time it is in the 500-600 units.
Based on a 500 unit delivery and a normal inspection level, we are to inspect 50 units. Sometimes, due to one reason or another out of my control, we only have time to inspect a portion of that amount. Do the formulas take into account this variable or must every unit be inspected (50 units)?
We have a visual pass/fail inspection and a measurement portion.