Hello,

Thanks for reading this post.

We have created a DFMEA for one of our product lines. Right now, we are working on a PFMEA and Control plan for the same line based on the failure modes identified in the DFMEA.

I was looking for some clarification about the KCC's. From my understanding, the DFMEA brings to light the critical characteristics that we juxtapose with the PFMEA and identify the process steps where the characteristics appear. Based on the criticality and control requirement at those steps, we seperate the KCC's from the other characteristics . Am I correct? What is the relationship between the DFMEA, PFMEA and KCCs?

Thanks again for your help...

Aj
 
Elsmar Forum Sponsor

Miner

Forum Moderator
Staff member
Admin
#5
Re: DFMEA, PFMEA and KCC's

I was looking for some clarification about the KCC's. From my understanding, the DFMEA brings to light the critical characteristics that we juxtapose with the PFMEA and identify the process steps where the characteristics appear. Based on the criticality and control requirement at those steps, we seperate the KCC's from the other characteristics . Am I correct? What is the relationship between the DFMEA, PFMEA and KCCs?
You are correct that the DFMEA is completed first. The DFMEA is used to identify potential Key Product Characteristics (KPC). KPCs may also be identified through DFSS tools. These are the Critical to Quality (CTQ).

Next the PFMEA is completed making sure that all potential KPCs are included in the review. During the PFMEA, the potential KPCs are confirmed as true KPCs or ruled out. If the KPCs are confirmed, the process is reviewed to identify potential Key Control Characteristics (KCC).

If you are familiar with the Six Sigma view of processes in terms of y = f(x) [Output = a function of input variables], then KPC = f(KCC). KCCs are those process parameters that have a significant effect on a KPC. In a heat treat operation, time and temperature in the oven, and quench media and temperature would be KCCs to a KPC of hardness.
 
Last edited:

Jim Wynne

Staff member
Admin
#6
Re: DFMEA, PFMEA and KCC's

You are correct that the DFMEA is completed first. The DFMEA is used to identify potential Key Control Characteristics (KCC). KCCs may also be identified through DFSS tools. These are the Critical to Quality (CTQ).

Next the PFMEA is completed making sure that all potential KCCs are included in the review. During the PFMEA, the potential KCCs are confirmed as true KCCs or ruled out. If the KCCs are confirmed, the process is reviewed to identify potential Key Process Controls (KPC).

If you are familiar with the Six Sigma view of processes in terms of y = f(x) [Output = a function of input variables], then KCC = f(KPC). KPCs are those process parameters that have a significant effect on a KCC. In a heat treat operation, time and temperature in the oven, and quench media and temperature would be KPCs to a KCC of hardness.

In terms of general usage, you have the two things backwards. "KPC" is generally interpreted as Key Product Characteristic, which is a feature of the product which requires special process controls, which are Key Control Characteristics. For each KPC there should be one or more KCCs, but there could be KCCs without any KPCs.
 

Miner

Forum Moderator
Staff member
Admin
#7
Re: DFMEA, PFMEA and KCC's

In terms of general usage, you have the two things backwards. "KPC" is generally interpreted as Key Product Characteristic, which is a feature of the product which requires special process controls, which are Key Control Characteristics. For each KPC there should be one or more KCCs, but there could be KCCs without any KPCs.
You are correct. I haven't worked with GM for a few years. Swap the two and the rest of the post is still accurate.
 
A

Ajgupta

#8
Re: DFMEA, PFMEA and KCC's

You are correct that the DFMEA is completed first. The DFMEA is used to identify potential Key Control Characteristics (KCC). KCCs may also be identified through DFSS tools. These are the Critical to Quality (CTQ).

Next the PFMEA is completed making sure that all potential KCCs are included in the review. During the PFMEA, the potential KCCs are confirmed as true KCCs or ruled out. If the KCCs are confirmed, the process is reviewed to identify potential Key Process Controls (KPC).
Thanks. I wanted to confirm my understanding of the process was not flawed.

If we have a 100% inspection (In-process as well as actual inspections), does that necessarily have to imply that the characteristic is a KCC? Say if the machinist visually or with a gage inspects the bore diameter as he knows that the tool is prone to moving away from Caliberation. What would such a situation be?

Any rule-of-thumb's that you may know about KCC's?

appreciate the responses.
 

Jim Wynne

Staff member
Admin
#9
Re: DFMEA, PFMEA and KCC's

Thanks. I wanted to confirm my understanding of the process was not flawed.

If we have a 100% inspection (In-process as well as actual inspections), does that necessarily have to imply that the characteristic is a KCC? Say if the machinist visually or with a gage inspects the bore diameter as he knows that the tool is prone to moving away from Caliberation. What would such a situation be?

Any rule-of-thumb's that you may know about KCC's?

appreciate the responses.
See my earlier post in this thread wrt KCC/KPC. If the part is being inspected, it's a product characteristic. If the machine (or other process feature) is monitored and adjusted as necessary, it's a control characteristic. KCCs govern KPCs.

In answer to your question, if there are no customer-defined KPCs (customers normally won't specify KCCs), you're free to call it whatever you want to call it. If it's something that needs special controls, those controls should be identified and invoked, regardless of what you call them.

Typical Automotive Trilogy Development
 
Thread starter Similar threads Forum Replies Date
P Equipment URS, pFMEA and dFMEA ISO 14971 - Medical Device Risk Management 3
R DFMEA/PFMEA mitigation of high severity (9-10) in low volume products IATF 16949 - Automotive Quality Systems Standard 1
P Understanding DFMEA and PFMEA - Supplier Related IATF 16949 - Automotive Quality Systems Standard 21
Q Is that any difficulty to do software DFMEA and PFMEA in ISO 13485? ISO 13485:2016 - Medical Device Quality Management Systems 5
T DFMEA/PFMEA and SCCAF alignment FMEA and Control Plans 19
I Making a process PFMEA, no DFMEA (non-automotive toll manufacturer) FMEA and Control Plans 1
Proud Liberal DFMEA / PFMEA linkage - Where in the standards do I find it? FMEA and Control Plans 5
N DFMEA, Drawings and PFMEA of an Assembly Process FMEA and Control Plans 12
C DFMEA vs. PFMEA Relationship: The cause in DFMEA becomes Failure in the PFMEA FMEA and Control Plans 2
N What is the relationship between a DFMEA and PFMEA? FMEA and Control Plans 1
S DFMEA countermeasures in PFMEA FMEA and Control Plans 18
V Simple Representation for Scope of DFMEA and PFMEA FMEA and Control Plans 4
E IQRM PFMEA/DFMEA Software FMEA and Control Plans 11
T DFMEA & PFMEA - Special Characteristics Identification FMEA and Control Plans 14
V Failure Modes & Causes in dFMEA & pFMEA FMEA and Control Plans 3
K DFMEA & PFMEA Lead Responsibility FMEA and Control Plans 10
T DFMEA (Design FMEA) - We already have a PFMEA (Process FMEA) FMEA and Control Plans 5
C Does the PFMEA Severity have to match the DFMEA Severity? FMEA and Control Plans 3
C DFMEA (Design FMEA) and PFMEA (Process FMEA) - Who should lead? FMEA and Control Plans 14
P DFMEA, PFMEA and Control Plan examples (e.g.: for a pen) wanted for training FMEA and Control Plans 2
U Example of DFMEA & PFMEA for a throttle body (Butterfly valve) FMEA and Control Plans 2
N How to Calculate RPN in Design FMEA (DFMEA) vs. Process FMEA (PFMEA) FMEA and Control Plans 9
W Actual examples of FMEA (DFMEA, PFMEA) for Car Assembly Process IATF 16949 - Automotive Quality Systems Standard 5
G The difference between DFMEA and PFMEA FMEA and Control Plans 4
L Special Characteristics in DFMEA (Design FMEA) - Carry over to PFMEA? FMEA and Control Plans 9
Ron Rompen Development of the PFMEA - SEVERITY scores not derived from the DFMEA - Ford FMEA and Control Plans 13
M Connection between DFMEA and PFMEA - What must be transferred to the PFMEA? FMEA and Control Plans 9
Y Design (DFMEA) and Process (PFMEA) FMEA Failure Mode Identification Design and Development of Products and Processes 8
A PFMEA - Is having the DFMEA An Absolute Requirement when doing a PFMEA FMEA and Control Plans 19
O AIAG VDA DFMEA Template Required FMEA and Control Plans 2
P DFMEA - Machinery Design Best Practices FMEA and Control Plans 0
J Looking for a training organization that can provide in house DFMEA training FMEA and Control Plans 4
B Why the Greek god Hephaestus should have done a design FMEA (DFMEA) on his giant robot APQP and PPAP 1
DuncanGibbons Best practice for identifying "items" of parts for DFMEA analysis AS9100, IAQG, NADCAP and Aerospace related Standards and Requirements 2
M How to complete structure Analysis and Function analysis sections' columns of AIAG-VDA DFMEA form FMEA and Control Plans 0
Jimmy123 Handling nonfunctional requirements in DFMEA FMEA and Control Plans 5
Jimmy123 P-Diagram vs DFMEA FMEA and Control Plans 4
C Function definition for DFMEA FMEA and Control Plans 1
G DFMEA buy-in strategies for Design Engineers APQP and PPAP 22
optomist1 DFMEA - Real Life Drama FMEA and Control Plans 25
optomist1 Share a DFMEA template please Document Control Systems, Procedures, Forms and Templates 2
P Detection rating for a user (surgeon) related failure mode in DFMEA APQP and PPAP 3
Marc Definition DFMEA (Design FMEA) - Definition Definitions, Acronyms, Abbreviations and Interpretations Listed Alphabetically 0
S DFMEA when the supplier doesn't have design responsibility APQP and PPAP 15
C Design for Assembly in DFMEA - Failure Effect of Sub-System(s) FMEA and Control Plans 5
C Resource allocation problems in Software DFMEA FMEA and Control Plans 4
D Introducing an existing product into automotive context - DFMEA needed? IATF 16949 - Automotive Quality Systems Standard 8
N YS Class in DFMEA & Process Control Measures FMEA and Control Plans 1
R DFMEA Severity 9-10 with Occurrence 3 and Detection 3 - Actions FMEA and Control Plans 3
G Is it compulsory to make DFMEA for proto parts making organisation APQP and PPAP 1

Similar threads

Top Bottom