A tidbit, if you will:
----------snippo----------
From: [email protected]
Subject: Re: Dist. Company's Supplier Eval. /../Naish/Oliveira/Naish
Where are the other sections that a distributor should have in place? The most obvious is 4.3 contract review. And for the distributors I have helped get registered the only section of 9002 that might not apply is 4.19. When they did their own delivery or in house stocking programs even those applied.
That was my original point and question. The questionnaire or survey you do for any company should be the same with 4.4 added for a company that does design. Even distributors for the most part have 4.9 for items like packaging machines, conveyor systems, and much more.
Phyllis
----------snippo----------
From: [email protected]
Subject: Re: Dist. Company's Supplier Eval. /../Naish/Oliveira/Naish
Where are the other sections that a distributor should have in place? The most obvious is 4.3 contract review. And for the distributors I have helped get registered the only section of 9002 that might not apply is 4.19. When they did their own delivery or in house stocking programs even those applied.
That was my original point and question. The questionnaire or survey you do for any company should be the same with 4.4 added for a company that does design. Even distributors for the most part have 4.9 for items like packaging machines, conveyor systems, and much more.
Phyllis