S
The power for our applied part goes as follows: wall/isolation transformer (60601)/universal power supply (60950)/power supply for applied part (60950)/applied part. The tip of the applied part is then insulated/electrically isolated from the patient via a thick plastic tool and the rest of the applied part is under medical sterile plastic drapes.
Our test engineer claims we fail to comply as 2 MOPPs are not provided across the power supply.
Is this the case?
Our test engineer claims we fail to comply as 2 MOPPs are not provided across the power supply.
Is this the case?
Last edited by a moderator: