Do we need to include ISO 9001 Clause 7.3? Design and Development Exclusion

D

dgregory2

#1
Hello all,
I've found a tremendous amount of info on the forums but this is my first post.

I'm in the process of writing a quality manual and ISO9001:2008 certification process for a small casting/manufacturing company. We cast and manufacture product to our customers' spec's. We design the molds for casting and the fixturing for machining the product. We typically revise a CAD model supplied by the customer for ease of the casting and manufacturing processes. We then submit the model for the customer's approval. Do we need to include Clause 7.3, Design & Developement?
 
Elsmar Forum Sponsor

Helmut Jilling

Auditor / Consultant
#2
Re: Do we need to include Clause 7.3?

The standard is not real clear. In the old 1994 standard, the approach was to exclude the whole Design element (4.4) if you were not "responsible" for Design. In the new standard, it is process based, so should you exclude processes that are not applicable? It does not specifically say. To further confuse things, many companies are not "responsible" for Design, but collaborate with the customer.

What I suggest to clients is 2 points.
1. Read the section and understand the requirements.
2. Exclude the parts that do not apply to your operations, but leave in the parts that do apply.

For example, from your description, you would not do Design Planning or Validation, would not do prototyping, and some other things. But, you might do some design review, some verification, control some design changes from the customer. If the standard has useful info about some of these relevant bits your organization does, why not capture them into your system, so you can control the best ways for people to do them.

The key point is they are things you do, why not include them.

If you were a distributor of hardware parts, perhaps my recommendation would be to leave out the whole thing, because maybe none of it would apply at that point.
 
S

Sorin

#3
In my opinion you can exclude 7.3 because you do not have the authority to change the design of the castings.

The castings are manufactured per your customer requirements.
As your customer is providing ALL the specs (including the DWG), he's the only one who can modify/change the part in question.
 
A

amariepsu

#4
Re: Do we need to include Clause 7.3?

We took an exclusion to this clause because our customers are in charge of their design and development as well. However I often reference this section for guidance while implementing or designing new processes, it does have useful info, however the registrar will most likely see why you took the exclusion and be fine with it.
 

Helmut Jilling

Auditor / Consultant
#5
Re: Do we need to include Clause 7.3?

We took an exclusion to this clause because our customers are in charge of their design and development as well. However I often reference this section for guidance while implementing or designing new processes, it does have useful info, however the registrar will most likely see why you took the exclusion and be fine with it.
Your comment is a perfect example for the suggestion I made in post #2. You exclude the clause, but you find value in referring to it "frequently" for guidance. That may be compliant. But, if you find value in referring to it frequently, why not incorporate the relevant bits into your system so other members of your company can refer to it too. You appear to be using some of it, which is fine. But, why exclude it, then. There are activities in there that must be relevant to you.
 

Big Jim

Super Moderator
#6
Hello all,
I've found a tremendous amount of info on the forums but this is my first post.

I'm in the process of writing a quality manual and ISO9001:2008 certification process for a small casting/manufacturing company. We cast and manufacture product to our customers' spec's. We design the molds for casting and the fixturing for machining the product. We typically revise a CAD model supplied by the customer for ease of the casting and manufacturing processes. We then submit the model for the customer's approval. Do we need to include Clause 7.3, Design & Developement?
You are permitted to do planning for production as part of 7.1, without being involved with design. You should read 7.1 to see how it applies to you.

Your designing of the molds and fixturing fall into 7.1.

As to if you would have a problem with modifying the model without crossing over into design, you may be on the edge of design even if you don't cross over the line. This would be a very good question for your Certification Body. I have seen this applied differently by different CBs.
 

somashekar

Staff member
Super Moderator
#8
Hello all,
I've found a tremendous amount of info on the forums but this is my first post.

I'm in the process of writing a quality manual and ISO9001:2008 certification process for a small casting/manufacturing company. We cast and manufacture product to our customers' spec's. We design the molds for casting and the fixturing for machining the product. We typically revise a CAD model supplied by the customer for ease of the casting and manufacturing processes. We then submit the model for the customer's approval. Do we need to include Clause 7.3, Design & Developement?
Look more closely ... deeper ... well, what you can see is a design input from customer by way of spec and cad model. To make the product out and deliver you need to design many things for the casting and machining, and hence you will use several other design inputs along with what customer provides. This will also include learnings from other casting and machining knowledges that you have acquired.
So part of the input and part of the design varification and validation may be the customer domine. Your process here is not as simple as nut and bolt, that customer gives the nut and bolt and you just thread them in (assembly) and deliver.
Your scope must have design and development and the design and development stages will have appropriate customer interface at appropriate stages.
On the long run you will feel more confident including 7.3.
This is my opinion on your situation.
 
S

scoraccio

#9
Hello all,
I've found a tremendous amount of info on the forums but this is my first post.

I'm in the process of writing a quality manual and ISO9001:2008 certification process for a small casting/manufacturing company. We cast and manufacture product to our customers' spec's. We design the molds for casting and the fixturing for machining the product. We typically revise a CAD model supplied by the customer for ease of the casting and manufacturing processes. We then submit the model for the customer's approval. Do we need to include Clause 7.3, Design & Developement?
I think you've gotten very good answers, here - or at least ones that I can concur with.

So, for what it's worth, I can support the opinion that you can safely exclude 7.3, use the bits in 7.1 to cover your mold design, and - and down the road, if you find value in the planning and other control parts of 7.3, then include that as well.

I find this fairly exact situation quite often.
 
Thread starter Similar threads Forum Replies Date
D ISO/TS16949 Internal Calibration Lab need to include Production Equipments IATF 16949 - Automotive Quality Systems Standard 26
N FDA UDI - Label vs. Labeling - Does the insert need to include UDI? Other US Medical Device Regulations 1
shimonv Does 510(k) submission need to include UDI Data Other US Medical Device Regulations 6
D Need to include Premise of Outsourced Call Center in ISMS Surveillance Audit? IEC 27001 - Information Security Management Systems (ISMS) 4
T Do I need to approve my Registrar and include them in the Approved Supplier List? ISO 9000, ISO 9001, and ISO 9004 Quality Management Systems Standards 11
K Need help with AS9100 Scope Change to include Manufacturing Process Maps, Process Mapping and Turtle Diagrams 1
B Quality Policy - Need to include "Customer Satisfaction & Continual Improvement? ISO 9000, ISO 9001, and ISO 9004 Quality Management Systems Standards 10
Howard Atkins What does the internal audit procedure for TS 16949 need to include? Clause 8.2.2 General Auditing Discussions 7
E Documenting Titration Testing - How much information do I need to include? Other ISO and International Standards and European Regulations 8
D Low risk IVD study in the UK, do I need MHRA approval? UK Medical Device Regulations 0
A Medical Device Contract Manufacturer - Does the CM need to register with FDA? 21 CFR Part 820 - US FDA Quality System Regulations (QSR) 2
J Records Control - Does each individual record need to be numbered? Records and Data - Quality, Legal and Other Evidence 2
N Is there a need for clinical test of Class IIa products (for MDR)? EU Medical Device Regulations 2
J Do Software Subcontractors need to be ISO13485 compliant in the EU? EU Medical Device Regulations 3
K Do I need a "State of the art" plan? CE Marking (Conformité Européene) / CB Scheme 1
S Need advice for schooling Quality Manager and Management Related Issues 6
R What information do i need to get from the device manufacturer 21 CFR Part 820 - US FDA Quality System Regulations (QSR) 0
S Need guidance on project ISO 13485:2016 - Medical Device Quality Management Systems 2
H Need MSA 4th ed. compliant attribute MSA template General Measurement Device and Calibration Topics 4
J Need Change Control Yes/No Decision Tree Template ISO 9000, ISO 9001, and ISO 9004 Quality Management Systems Standards 1
C Does an accessory need an IFU if it use is discussed in the Parent device IFU? 21 CFR Part 820 - US FDA Quality System Regulations (QSR) 5
B Countries with no need for FSC (Free sales certificate) Other Medical Device Regulations World-Wide 0
R The term "Benefit Risk Ratio" in EU MDR, do I need to present benefit risk analysis as a RATIO Risk Management Principles and Generic Guidelines 4
A Brexit When does the UK responsible person need to be in place? UK Medical Device Regulations 10
R Do we need issue ECN (Engineering Change Notice) towards updated Material Specification? Design and Development of Products and Processes 2
N IPC-A-630 - Is this free or do i really need to pay for it? Manufacturing and Related Processes 4
C ISO/ IEC 17021 Resource requirement (need help) Document Control Systems, Procedures, Forms and Templates 5
P Need a programmer for QVI's VMS software for optical inspection machine Inspection, Prints (Drawings), Testing, Sampling and Related Topics 0
silentmonkey How to decide what characteristics need to be verified during incoming inspection? ISO 13485:2016 - Medical Device Quality Management Systems 5
D Change Approval Requirements - Does every change need formal customer approval? Design and Development of Products and Processes 17
T Do I need a qualified compiler for class B software? IEC 62304 - Medical Device Software Life Cycle Processes 3
E 13485:2016, Sections 4.1.6, 7.5.6 and 7.6 - Validation of Software - Need some Advice please ISO 13485:2016 - Medical Device Quality Management Systems 3
C ISO 13485 :2016 - CAPA - Does every CAPA need to be checked by regulations? ISO 13485:2016 - Medical Device Quality Management Systems 9
L Proof of Concept Studies - Do we need to comply with SAE reporting? Medical Device and FDA Regulations and Standards News 3
gunnyshore Adding a new facility - do I need to submit an amendment to the MDL or MDEL, or both? Canada Medical Device Regulations 3
SocalSurfer AS9100 new certificate, but need QMS software, help Quality Assurance and Compliance Software Tools and Solutions 2
A Demonstration of Equivalence - Need for comparing biological characteristics for an SamD EU Medical Device Regulations 1
G Need to change KPI we called NC parts (maximum 3%.) to FTQ (first time quality) IATF 16949 - Automotive Quality Systems Standard 4
W Need for current design or process control FMEA and Control Plans 2
L Turkish Requirements - Does the Software need to be translated? CE Marking (Conformité Européene) / CB Scheme 2
J Need for a cleanroom in the manufacture of a medical device for a clinical trial EU Medical Device Regulations 4
S Need help with analysing a survey on minitab Using Minitab Software 1
M IATF 16949 8.5.1.3 Verification of job set-ups - Do we need secondary check? IATF 16949 - Automotive Quality Systems Standard 7
P Electrosurgical Device User Need: Cord Flexibility -> Requirement Other Medical Device and Orthopedic Related Topics 4
P Do I need to get registered or have German entity to sell IVD products in Germany? CE Marking (Conformité Européene) / CB Scheme 2
J Documentation structure - Do I need Work Instructions? Document Control Systems, Procedures, Forms and Templates 23
G Need resources / tutorials about OPS (Operation) for ISO IT (Information Technology) Service Management 8
D Do non-IATF customers need to be included in audit scope? IATF 16949 - Automotive Quality Systems Standard 23
M Do you need an Applicable general safety and performance requirements Checklist? EU Medical Device Regulations 2
Y Does Solidworks (2D/3D drafting modules) need validation? Other Medical Device and Orthopedic Related Topics 5

Similar threads

Top Bottom