Thank you sir for your concern, nope i don't really mind, because i can't seem to find that i should really update my work instruction if the process were still the same, outdated sir out of date, the work instruction was revised last 2013 but still in use up to today, but my Lead Auditor call it out, because it is said to be outdated, and the document is accurate, yes it is included in the procedure that the documents need to review periodically, but does not mean to revise it, and it doesn't include there, i just can't find the right words in the standard that the documents should be updated. If the work instruction dated in 2013 but still accurate about the process itself, why does my team leader call it out as a Findings. I just can't comprehend sir, i was thought by our SGS trainer that the audit is to find compliance not the opposite, the non compliance itself will come out once the process to complying doesn't match right sir?