Documents not controlled by the ECO (Engineering Change Order) process

#1
I received the following observation from my DNV auditor and I want to address it in the best possible way:
"Assure the procedure for document control addresses control of department documents not controlled by the ECO process like customer profiles utilized in Sales"

I am trying to collect ideas (brainstorm) to come out with the best alternative.

I would appreciate your input.
Thanks.
 
Elsmar Forum Sponsor
#2
I received the following observation from my DNV auditor and I want to address it in the best possible way:
"Assure the procedure for document control addresses control of department documents not controlled by the ECO process like customer profiles utilized in Sales"

I am trying to collect ideas (brainstorm) to come out with the best alternative.

I would appreciate your input.
Thanks.
Your document control procedure will direct required actions on relevant documents that will need a re-visit and change when an ECO is released.
Your auditor perhaps is asking you to document and make stronger your document control procedure. This is by way of linking ECO process to Document control process (improved process interaction) which is a sign of system maturity, if not done.
 
#4
I added the following paragraph to my procedure but my auditors is saying:

"The revision is not adequate. The requirements of ISO 9001 clause 4.2.3 need to be specifically addressed in the procedure for document control regarding control of documents not controlled by the ECO process"

This is my paragraph:

Documents not controlled by the ECO process
Some departments create other type of controlled documents that
require frequent updates; in this case it would be unproductive to
create an ECO every time, therefore, these documents are controlled
by the head of the department or designees, and should be protected
(as applicable) to prevent unauthorized changes.

Please I need feedback, thanks.
 
Last edited:

yodon

Leader
Super Moderator
#5
Maybe I'm off base here but the requirement states:

"Documents required by the quality management system shall be controlled." (my emphasis)

Are (Customer Profile and other) documents really *required* by your QMS?

I would agree that if these are required by your QMS then your statement about how they are controlled doesn't come close to meeting the requirement.

If these docs truly are required by your QMS (and need to be), you probably need a work instruction for how all the required controls (a..g) are met (outside of the ECO process).
 
Thread starter Similar threads Forum Replies Date
D MDR technical file: does it need to contain duplicates of controlled documents EU Medical Device Regulations 2
D Are there Controlled Documents in a DMR (Device Master Record)? ISO 13485:2016 - Medical Device Quality Management Systems 3
A Distribution of controlled documents through e-mail, is it ok? Document Control Systems, Procedures, Forms and Templates 3
M Do employee training records need to be controlled documents? AS9100, IAQG, NADCAP and Aerospace related Standards and Requirements 4
was named killer AS 9100D - Calibration Instructions - Controlled documents? AS9100, IAQG, NADCAP and Aerospace related Standards and Requirements 6
J Controlled information versus defined documents / records ISO 13485:2016 - Medical Device Quality Management Systems 3
I Dating controlled documents after changes - Revision History Document Control Systems, Procedures, Forms and Templates 13
I R&D prototype documents need to be controlled? ISO 9000, ISO 9001, and ISO 9004 Quality Management Systems Standards 5
D Controlled Documents & Note Making ISO 13485:2016 - Medical Device Quality Management Systems 4
Uriel Alejandro Including "Internal Rules" as Controlled Documents in a QMS Document Control Systems, Procedures, Forms and Templates 7
R How to Cross-Reference Controlled Documents Document Control Systems, Procedures, Forms and Templates 3
L Specific Question about Printing Controlled Documents. ISO 9000, ISO 9001, and ISO 9004 Quality Management Systems Standards 7
C Control of Records - Differences between Controlled Documents and Controlled Records Records and Data - Quality, Legal and Other Evidence 18
Q Modification in Controlled Documents AS9100, IAQG, NADCAP and Aerospace related Standards and Requirements 4
J Employee Contracts : Controlled and Uncontrolled Documents Document Control Systems, Procedures, Forms and Templates 6
R Part Prints - Controlled and Uncontrolled Documents (e.g.: The Production Floor) Document Control Systems, Procedures, Forms and Templates 13
F ISO 9001:2008 Fundamentals: Basic Questions - Controlled Documents ISO 9000, ISO 9001, and ISO 9004 Quality Management Systems Standards 16
A Do controlled documents require a signature on every page as per 21 CFR 820.40? 21 CFR Part 820 - US FDA Quality System Regulations (QSR) 5
x-files Documents required by the quality management system shall be controlled ISO 9000, ISO 9001, and ISO 9004 Quality Management Systems Standards 12
A How are Electronic Editable Documents Controlled Document Control Systems, Procedures, Forms and Templates 7
K Printed documents can't be controlled Document Control Systems, Procedures, Forms and Templates 16
J Are SPC Charts Controlled Documents according to TS 16949? Quality Manager and Management Related Issues 4
G Document Control-AS9100 - Marking of Documents as Master Copy of Controlled Copy AS9100, IAQG, NADCAP and Aerospace related Standards and Requirements 3
S Document Control - Different documents which must be controlled not identified Document Control Systems, Procedures, Forms and Templates 11
R Controlled Documents vs. Signage Papers (ie, reminders, general information) Document Control Systems, Procedures, Forms and Templates 1
J Add Safety Policies/LOTO/etc. to Controlled Documents? ISO 13485:2016 - Medical Device Quality Management Systems 9
Q Documents uncontrolled when printed, if is not printed is controlled? Document Control Systems, Procedures, Forms and Templates 4
T Which controlled documents should be labeled "Confidential and Proprietary" Document Control Systems, Procedures, Forms and Templates 7
N Controlled Documents Distribution Query - Home Care Company ISO 9000, ISO 9001, and ISO 9004 Quality Management Systems Standards 1
N Is this footer okay for our Controlled Documents? Document Control Systems, Procedures, Forms and Templates 14
B What to include on Controlled Documents that are managed Electronically? Document Control Systems, Procedures, Forms and Templates 2
H Document Control Defined? Determining what documents must be controlled ISO 9000, ISO 9001, and ISO 9004 Quality Management Systems Standards 15
T Inheriting Another Company's Controlled Documents? Document Control Systems, Procedures, Forms and Templates 4
M AS9100 Clause 4.2.3 requirements - Documents required by the QMS shall be Controlled AS9100, IAQG, NADCAP and Aerospace related Standards and Requirements 13
A Are Job Descriptions and Organizational Charts Controlled Documents? ISO 13485:2016 - Medical Device Quality Management Systems 13
A Document Control File - Identifying all documents which need to be controlled Document Control Systems, Procedures, Forms and Templates 11
T Controlled Documents - Can a word document and excel spreadsheet be controlled? Document Control Systems, Procedures, Forms and Templates 5
J Lock-out / Tag-Out Procedures as Quality Controlled Documents? ISO 9000, ISO 9001, and ISO 9004 Quality Management Systems Standards 25
W Electronic Distribution of Controlled Documents: Validation required? Qualification and Validation (including 21 CFR Part 11) 5
E Wiki vs. Controlled Documents - Eliminating Conflicts Quality Manager and Management Related Issues 5
B Stamping Documents as "Controlled Copy" - Clause 4.2.3 Document Control Stamp Document Control Systems, Procedures, Forms and Templates 17
A Equipment List - Control or not to Control (Controlled Documents) Document Control Systems, Procedures, Forms and Templates 8
M Should Internal Audit Checklists be Controlled Documents? Document Control Systems, Procedures, Forms and Templates 9
A List of controlled documents for ISO9001:2008 Call / Contact Center ISO 9000, ISO 9001, and ISO 9004 Quality Management Systems Standards 4
B Electronic Copies of previous versions of Controlled Documents in editable format Document Control Systems, Procedures, Forms and Templates 3
M All Internally Generated Documents ? Required to be Controlled or Not All? ISO 9000, ISO 9001, and ISO 9004 Quality Management Systems Standards 19
M Reissue of controlled documents - No changes identified Document Control Systems, Procedures, Forms and Templates 3
B Printed Copies of Controlled Documents Document Control Systems, Procedures, Forms and Templates 9
B "Controlled" stamp for Controlled Documents - Any alternatives? ISO 9000, ISO 9001, and ISO 9004 Quality Management Systems Standards 17
P Removal of Obsolete copies of Controlled Documents ISO 13485:2016 - Medical Device Quality Management Systems 8

Similar threads

Top Bottom