Hi,
I have a doubt, while SPC is in place with QMS- do we still need to perform Final/Pre-dispatch ispection ?
Is it required by ISO/TS 16949:2009 to perform final/Pre-dispatch ispection, while you are also performing SPC?
If it is mandatory in TS, can we reduce Sampling frequency as we are performing SPC?
Thanks,
Amit
100% inspection will guarantee trouble.!!!
-Dr.W.Edward Deming
I have a doubt, while SPC is in place with QMS- do we still need to perform Final/Pre-dispatch ispection ?
Is it required by ISO/TS 16949:2009 to perform final/Pre-dispatch ispection, while you are also performing SPC?
If it is mandatory in TS, can we reduce Sampling frequency as we are performing SPC?
Thanks,
Amit
100% inspection will guarantee trouble.!!!
-Dr.W.Edward Deming
Last edited: