Hello everyone!

In our manufacturing (Electronics) we would like to introduce a control chart to monitor the reflow oven parameters. The parameters to monitor are temperature and time
In specific: Soak Time, Peak Temp, Cooling time.

Currently we use a profiler to measure the parameters. The profiler uses 3 probes to measure the temperature and we have therefore 3 measures to fill the control chart.
The profiler is done once a month.

Which is the correct control chart? I-MR or X-bar / R-chart?

Thanks!
 
Elsmar Forum Sponsor

Beth Savage

Helping organizations optimize quality
Leader
PQ Systems
#2
It boils down to your subgroup size for each characteristic.

With an I-MR chart, each plotted value on the I (individuals) chart represents one measured value. Each plotted value on the MR (moving range) chart represents the difference between successive individual measurements.

If you are collecting one measurement for each characteristic (Peak Temp, Soak Time, Cooling Time), the I-MR chart would be appropriate.

With an X-bar/R chart, each plotted value on the X-bar chart represents the average (or mean) for a subgroup of data. The subgroup (or sample) must contain two or more measured values. Each plotted value on the R (range) chart represents the range (highest minus lowest) for the subgroup of data.

If you are collecting multiple measurements for each characteristic (e.g. 5 samples each for Peak Temp, Soak Time, Cooling Time), the X-bar/R chart would be appropriate.
 

Steve Prevette

Deming Disciple
Leader
Super Moderator
#3
I agree with Beth above - great post. I will say my personal preference is I-mR, which Dr. Don Wheeler is a big proponent of. But since you do have three readings of the same parameter - it is a great opportunity to see if they are consistent between the three readings and detect if one is drifting.
 

Miner

Forum Moderator
Leader
Admin
#4
How are you using the three probes? Are these measuring different sections of the reflow oven? Are you recording a literal profile as it passes through the oven with the three probes in a right/center/left configuration such as the 6-probe example below?

1646239614319.png
 
Last edited:

Bev D

Heretical Statistician
Leader
Super Moderator
#5
It boils down to your subgroup size for each characteristic.
Mathematically that is correct. Theoretically and practically that isn’t the best answer. The first step is to understand the variation and it’s homogeneity - lack of it. We rationally subgroup to place the random/homogenous variation within the subgroup. Then we can determine the bets sample size and the best control chart.

I have never used a control chart of temp profiles mostly because the variation is not all that random. My suggestion would be to really think about how the process varies and how it can change or go wrong. Plotting the data over multiple runs and looking at it will help. I think inner is going in that direction with his questions…
 
#7
Thanks to all of you first of all!

To answer Miner: The three probes are placed on a PCB sample that is travelling through the oven. The probes are placed at different positions on the PCB (I am not sure where exactly).
 

Steve Prevette

Deming Disciple
Leader
Super Moderator
#8
I'd suggest try it multiple ways (ImR, xbar-R) and see which gives the best picture. Also, if you've had a known fault in the past, see what chart detects it. Likely they all will, but some may be better than others. You may want to try ImR on each individual temperature.
 

Miner

Forum Moderator
Leader
Admin
#9
To answer Miner: The three probes are placed on a PCB sample that is travelling through the oven. The probes are placed at different positions on the PCB (I am not sure where exactly).
So the probes are either placed randomly on the PCB, or strategically on components with a high thermal mass. Either way, the variation between probes will consist of component to component differences + measurement variation. Within oven variation is excluded due to the relatively small size of a PCB.

I think both IMR and XbarR charts are an option, but this leads to the next question. How do you plan to collect each sample? Do you intend to take one sample at a specific time/location in the oven each time you run the profiler through, or do you intend to take multiple samples from one profiler pass through the oven? The first option would track oven temperature variation in the same location over time. The second option would track oven temperature variation over distance (location) in the oven.
 
#10
To answer to Miner: To goal is to track the stability of the oven temperature over time and we have therefore decided to take only one measure from only one of the 3 probes. As you pointed out, we don't want to check a specific PCB profile (and placing the probes strategically on components with a high thermal mass). Further, we intend to take one sample once a month.
It seems that IMR chart is the best one to detect points out of the limits.

Now, my next question is... When do I need to react with a corrective action? At every single point out of the 3-sigma limit?
 
Thread starter Similar threads Forum Replies Date
K Doubt on insulation class of a device IEC 60601 - Medical Electrical Equipment Safety Standards Series 3
T ISO 14971-2019 doubt - Evaluate if estimated risks are acceptable ISO 14971 - Medical Device Risk Management 9
A Doubt on multiple inspection carrying out for same balloon number during Stage Inspection and Final Inspection? Inspection, Prints (Drawings), Testing, Sampling and Related Topics 3
M Doubt about Customer Changes to Product Design Features AS9100, IAQG, NADCAP and Aerospace related Standards and Requirements 7
N Doubt on Bias study for EOLT (End Of Line Tester) Gage R&R (GR&R) and MSA (Measurement Systems Analysis) 2
P Doubt about MSA for Attributes Gaging - Reference Value Gage R&R (GR&R) and MSA (Measurement Systems Analysis) 8
K Standard Deviation - Doubt and Clarification of my Understanding Statistical Analysis Tools, Techniques and SPC 28
M Attribute Gage MSA - What is the width of the gray area of ​​doubt? Gage R&R (GR&R) and MSA (Measurement Systems Analysis) 5
S Is TS16949 a standard by itself? A basic doubt IATF 16949 - Automotive Quality Systems Standard 5
V Mandatory to send to the Customers FMEA in a PPAP level 3 - Doubt IATF 16949 - Automotive Quality Systems Standard 36
V MSA (Measurement System Analysis) Doubt on Analytic Method (Attribute Study) IATF 16949 - Automotive Quality Systems Standard 8
Z Doubt about the Location of Car GPS Navigators Funny Stuff - Jokes and Humour 13
A Doubt on "MSA 3rd Linearity Example.xls" formula Gage R&R (GR&R) and MSA (Measurement Systems Analysis) 4
S Doubt on Thread Measurement - Measuring Fluted (Odd) Taps for its pitch diameter Inspection, Prints (Drawings), Testing, Sampling and Related Topics 4
Marc Future of APQP and PPAP in Doubt? 2005 Update APQP and PPAP 26
M Doubt about the element 15.3 (VDA) - Periodic cross-check and repeated inspections VDA Standards - Germany's Automotive Standards 3
S What is the correct statement? EU Medical Device Regulations 7
keya1tos EU to UK plug adapter correct testing standard CE Marking (Conformité Européene) / CB Scheme 9
D New license submission - Correct Email Canada Medical Device Regulations 1
E Choosing correct MOPs IEC 60601 - Medical Electrical Equipment Safety Standards Series 2
Ron Rompen GDT Question - is this even correct? Inspection, Prints (Drawings), Testing, Sampling and Related Topics 3
lanley liao How to correct this NC? Oil and Gas Industry Standards and Regulations 11
lanley liao How to correct these NCs? Oil and Gas Industry Standards and Regulations 4
lanley liao Would you helpe me that how to correct these NCRs? Oil and Gas Industry Standards and Regulations 6
G How to ensure dimension of tapping hole before plating is correct? Manufacturing and Related Processes 2
C Correct Calibration Method for Dial Depth Gage General Measurement Device and Calibration Topics 6
S Is using ANSI/ASQ Z1.4-2008 the correct sampling plan to determine Pass/Fail of Apparel measurements? AQL - Acceptable Quality Level 8
K AS9100 - 7.3 - Are these black and white questions with specific correct answers AS9100, IAQG, NADCAP and Aerospace related Standards and Requirements 1
E Correct way to certify hydrostatic testing when it is not 100% (and Sample Size) Various Other Specifications, Standards, and related Requirements 6
R What is the correct way to refer to NIST? Calibration Frequency (Interval) 4
T Correct MSA study for an automated camera system which makes attribute inspection Gage R&R (GR&R) and MSA (Measurement Systems Analysis) 1
M NANDO codes of products - These are not the GMDN codes, correct? EU Medical Device Regulations 4
K The correct way of doing a 2 Sample T test Reliability Analysis - Predictions, Testing and Standards 7
B PED 2014/68/EU - Is this Traceability audit finding correct? Other ISO and International Standards and European Regulations 4
K Assigning the Correct Procedures Applicable to Job Titles General Auditing Discussions 15
JoshuaFroud How important is using the "correct" GMDN? Other Medical Device Regulations World-Wide 14
M Specifications Aerospace - Who is responsible for providing the correct specification(s) AS9100, IAQG, NADCAP and Aerospace related Standards and Requirements 14
supadrai OEM Changing the name of the manufacturer - length of process? Is 1-3 months correct? Other Medical Device Regulations World-Wide 0
J How long should I have to correct an audit finding? VDA Standards - Germany's Automotive Standards 7
E SPC for Dummies - The correct meaning of all the graphs Statistical Analysis Tools, Techniques and SPC 3
C UDI Label Verification - How do we ensure the barcode is correct and prove it? 21 CFR Part 820 - US FDA Quality System Regulations (QSR) 18
N Correct reading for analog pressure gauge ISO 17025 related Discussions 2
J How to measure process quality? Is DPPM the correct metric? Capability, Accuracy and Stability - Processes, Machines, etc. 5
P The correct way to do a Linearity and Stability Study on a Critical Dimension Gage R&R (GR&R) and MSA (Measurement Systems Analysis) 8
L Choosing the correct Distribution for Acceptance Sampling Inspection, Prints (Drawings), Testing, Sampling and Related Topics 19
A Safety Shoes & Temporary Workers - Is it correct to reuse again or not? Occupational Health & Safety Management Standards 11
S Definition MTBF and MCBF Correct Definitions Definitions, Acronyms, Abbreviations and Interpretations Listed Alphabetically 5
T What is the correct UMDNS Code for Tracheostomy Tube? Other Medical Device Regulations World-Wide 2
E Correct Statistical Test comparing 2 Groups Statistical Analysis Tools, Techniques and SPC 14
N What is the easiest way to verify we have the correct customer supplied materials? Misc. Quality Assurance and Business Systems Related Topics 5

Similar threads

Top Bottom