J
JSmith
Drawing Control
I have a question regarding drawing control. Any feedback would be greatly appreciated. I have been recently asked to compile a master list of our released engineering drawings. Right now we have about 25 different programs and probably over 200 released drawings (these include assemblies and components). I was wondering if it would be sufficient to state in our procedures that we refer to the bill of materials as our master list for engineering drawings? My reasoning behind this is: instead of listing those 200 drawings, I could list each bill of material and its revision level. Please let me know what you think.
Thanks in advance.
I have a question regarding drawing control. Any feedback would be greatly appreciated. I have been recently asked to compile a master list of our released engineering drawings. Right now we have about 25 different programs and probably over 200 released drawings (these include assemblies and components). I was wondering if it would be sufficient to state in our procedures that we refer to the bill of materials as our master list for engineering drawings? My reasoning behind this is: instead of listing those 200 drawings, I could list each bill of material and its revision level. Please let me know what you think.
Thanks in advance.