Hello,
Is there any option to get a waiver for “Earth leakage current test”(per 60601-1) in case of a large scale, permanently installed , light ion beam accelerator where floating the device is almost impossible?
(The large-scale cyclotron is grounded by multiple points through the structure. It is almost impossible to float it even when the main ground rod/bar is disconnected.)
Is there any option to get a waiver for “Earth leakage current test”(per 60601-1) in case of a large scale, permanently installed , light ion beam accelerator where floating the device is almost impossible?
(The large-scale cyclotron is grounded by multiple points through the structure. It is almost impossible to float it even when the main ground rod/bar is disconnected.)