Earthing of moving parts, designing tips

#1
Hi everyone,
We are a small company developing a medical device, our device is class I, meaning the metallic parts of the device are protectively earthed.
However our device have a metallic drawer that would allow the surgeon to put instrumentation on it, what would you suggest regarding the earthing of this moving part ? Will we be able to have 0.1 Ohm from the drawer to the ground pin through all the metallic connections in between ?
Thank you for your answers
 
Elsmar Forum Sponsor
Thread starter Similar threads Forum Replies Date
N Protective Earthing of Medical Device Moving Parts IEC 60601 - Medical Electrical Equipment Safety Standards Series 3
F Earthing system (IT, TT or TN) and IEC 60601 Requirements IEC 60601 - Medical Electrical Equipment Safety Standards Series 2
J Protective Earthing for Medical Device with two wire power cord in metal enclosure IEC 60601 - Medical Electrical Equipment Safety Standards Series 9
S How MR (Moving Range) in Z-MR chart is calculated Using Minitab Software 5
A Moving and positioning of patient - Mechanical hazard IEC 60601 - Medical Electrical Equipment Safety Standards Series 18
D Company Moving - Relabelling Question Medical Device and FDA Regulations and Standards News 0
Jen Kirley Moving on - I accepted an offer to be a Supplier Quality Engineer at GE Healthcare Coffee Break and Water Cooler Discussions 42
S Moving from client-server to cloud-based, is that a new submission? Medical Information Technology, Medical Software and Health Informatics 3
M How to calculate benefits? Moving some developed non controlled software/automation systems Service Industry Specific Topics 2
Ed Panek Moving from Contract Manufacturing to Production In-House ISO 13485:2016 - Medical Device Quality Management Systems 3
supadrai What to expect when moving to higher-risk medical devices? Other Medical Device and Orthopedic Related Topics 1
F It is acceptable moving remote locations staff to manufacturing plant for auditing? IATF 16949 - Automotive Quality Systems Standard 3
N How is documentation affected moving to an electronic system? ISO 13485:2016 - Medical Device Quality Management Systems 13
L Moving from ProArc to IFS Document Management Document Control Systems, Procedures, Forms and Templates 1
K Sister Company Moving to AS - First time "consultant" - Help? AS9100, IAQG 9100, Nadcap and related Aerospace Standards and Requirements 17
I Moving into Clinical Trials and need to find GMP Suppliers 21 CFR Part 820 - US FDA Quality System Regulations (QSR) 1
B Moving (Transition) From ISO 14001:2004 to ISO 14001:2015 ISO 14001:2015 Specific Discussions 3
P Moving from a Paper based Quality System to an Electronic Quality System Manufacturing and Related Processes 14
S Validation requirement after moving labeling data base to different drive Software Quality Assurance 7
Q REACH due dilligence and meeting the ever moving SVHC target RoHS, REACH, ELV, IMDS and Restricted Substances 5
C Moving to a different Notified Body Quality Manager and Management Related Issues 5
R What Documentation is done by QA in FMCG (Fast Moving Consumer Goods) Misc. Quality Assurance and Business Systems Related Topics 2
T Risk Analysis for moving manufacturing equipment ISO 14971 - Medical Device Risk Management 17
C ISO9001: Moving from site certification to corporate certification Quality Manager and Management Related Issues 9
T Moving a Calibration/Test Laboratory to a new Location General Measurement Device and Calibration Topics 5
R Moving from ISO 9001 to AS9120A Document Control Systems, Procedures, Forms and Templates 2
Q Moving steps from ISO 9001 to TL 9000 TL 9000 Telecommunications Standard and QuEST 4
M SPC, Moving Range Chart and Weighted Graph Basic Questions Statistical Analysis Tools, Techniques and SPC 1
F Moving our Distribution Company - ISO 9001 Certification Impact ISO 9000, ISO 9001, and ISO 9004 Quality Management Systems Standards 4
N NCR and CAPA in the FMCG (Fast Moving Consumer Goods) Industry Nonconformance and Corrective Action 1
D A2LA Certification and moving to a new Facility General Measurement Device and Calibration Topics 6
S Moving to a New Company for a New Position Coffee Break and Water Cooler Discussions 3
D IMR (Individuals and Moving Range) Chart for Short-Run SPC - How much data to include Statistical Analysis Tools, Techniques and SPC 1
S Validation and Qualification when moving to another Facility Qualification and Validation (including 21 CFR Part 11) 2
L Moving SPC Data from Variables to an Attributes Chart Statistical Analysis Tools, Techniques and SPC 4
S Advice on moving QMS Documents and Maintaining Revision History Quality Manager and Management Related Issues 9
N Requirements when moving locations - Class 1 Medical Device Manufacturer in the US Other Medical Device Regulations World-Wide 4
D AS9100 Shop Moving to a New Location AS9100, IAQG 9100, Nadcap and related Aerospace Standards and Requirements 5
C Moving On Coffee Break and Water Cooler Discussions 12
C Test Correlation - Moving Test Equipment to a New Location Manufacturing and Related Processes 7
W Moving M&TE (Measuring & Test Equipment) to New Facility General Measurement Device and Calibration Topics 3
E Moving Window Test - Is this test about determining the Threshold Voltage? Quality Tools, Improvement and Analysis 2
D Moving Manufacturing Equipment from USA to Europe - Is CE certification required?? CE Marking (Conformité Européene) / CB Scheme 12
R Moving to an Electronic System - Quality System Software Recommendations ISO 13485:2016 - Medical Device Quality Management Systems 5
S ISO 13485 - Moving towards common (single) certification for multiple locations ISO 13485:2016 - Medical Device Quality Management Systems 13
R Preventative Maintenance - Moving to a Predictive Maintenance Program Manufacturing and Related Processes 10
L Validation Plan Requirements when moving to a new Plant - Medical Device Industry Qualification and Validation (including 21 CFR Part 11) 19
V Supplier Moving Manufacturing Location after original PPAP APQP and PPAP 4
P Statistical Sampling of Packaging Material Testing? Fast Moving Consumer Goods Supplier Quality Assurance and other Supplier Issues 4
M When a moving range is 0, is it acceptable to have a PP/PPK of 0 also? Statistical Analysis Tools, Techniques and SPC 8
Similar threads


















































Top Bottom