Hi Everyone,
I am a new from this site. I was delighted and happy that there is a place like this wherein I could ask questions then in return I can also make a comment.
So far I'm working on the Documentation of our Document control procedure, revising and pull-out things that were not applicable on our system. I'm having a problem in documenting an ECN that shall be incorporated in our current Document Control System.
It starts with this: Whenever we made changes in our document/drawings/setup-sheets, we make use of the ECN (Engineering Change Notice)...we have an effectivity date reflected on the ECN...however when we generate the standard operating procedure for a document control there is another date reflects to it.
My concern(s):
1. Are we going to have the effectivity date equal to the effectivity date on the generated specs? (Note that we have in our current specs is five days allowance for effectivity date) Please advice.
2. I'm also having a problem how am I gonna change the format?
3. How am i gonna show the effectiveness of our Documentation System?
Any feedback would be appreciated.
Thanks in advance,
Raffy
I am a new from this site. I was delighted and happy that there is a place like this wherein I could ask questions then in return I can also make a comment.
So far I'm working on the Documentation of our Document control procedure, revising and pull-out things that were not applicable on our system. I'm having a problem in documenting an ECN that shall be incorporated in our current Document Control System.
It starts with this: Whenever we made changes in our document/drawings/setup-sheets, we make use of the ECN (Engineering Change Notice)...we have an effectivity date reflected on the ECN...however when we generate the standard operating procedure for a document control there is another date reflects to it.
My concern(s):
1. Are we going to have the effectivity date equal to the effectivity date on the generated specs? (Note that we have in our current specs is five days allowance for effectivity date) Please advice.
2. I'm also having a problem how am I gonna change the format?
3. How am i gonna show the effectiveness of our Documentation System?
Any feedback would be appreciated.
Thanks in advance,
Raffy