ECO (Engineering Change Order) presentation

R

recados

#1
Hi Guys,

I have posted a few questions these days in this site on ECOs.
First, I wanted to thank you all to taking the time for those.
I know your time is very valuable and a really appreciate.
On all my e-mails I mention that I am new to the manufacturing world. So, since I have this background I thought, instead of asking questions that are too broad, that I perhaps ask you for an ECO presentation. In that way I may be able to look to the process, and perhaps ask better questions.
Would you have ECO process presentations that you can share with me?

Thank you very much !!
:thanx:
 
Elsmar Forum Sponsor

Stijloor

Leader
Super Moderator
#3
Re: ECO presentation

Hi Guys,

I have posted a few questions these days in this site on ECOs.
First, I wanted to thank you all to taking the time for those.
I know your time is very valuable and a really appreciate.
On all my e-mails I mention that I am new to the manufacturing world. So, since I have this background I thought, instead of asking questions that are too broad, that I perhaps ask you for an ECO presentation. In that way I may be able to look to the process, and perhaps ask better questions.
Would you have ECO process presentations that you can share with me?

Thank you very much !!
:thanx:
Hello recados,

Would this information help with preparing your ECO presentation?

http://www.npd-solutions.com/configmgt.html

http://www.visitask.com/engineering-change-order.asp
 
Thread starter Similar threads Forum Replies Date
D ECO (Engineering Change Order) process questions ISO 13485:2016 - Medical Device Quality Management Systems 7
D Engineering Change Order (ECO) metrics to track ISO 13485:2016 - Medical Device Quality Management Systems 6
M ECO (Engineering Change Order) Record Filing Question Records and Data - Quality, Legal and Other Evidence 1
T Need help developing an ECO (Engineering Change order) procedure Document Control Systems, Procedures, Forms and Templates 3
C Documents not controlled by the ECO (Engineering Change Order) process ISO 9000, ISO 9001, and ISO 9004 Quality Management Systems Standards 4
D How to process Customer ECO's (Engineering Change Orders) ISO 9000, ISO 9001, and ISO 9004 Quality Management Systems Standards 5
J ECO (Engineering Change Order) Control for Unreleased Products Document Control Systems, Procedures, Forms and Templates 3
Q How to close the circle QMS and ECO (Engineering Change Order)? ISO 9000, ISO 9001, and ISO 9004 Quality Management Systems Standards 5
Q Document Control ECO (Engineering Change Order) or QMS? ISO 9000, ISO 9001, and ISO 9004 Quality Management Systems Standards 14
D ECO (Engineering Change Order) Risk Management Criteria and QA Document Control Systems, Procedures, Forms and Templates 19
M ECO (Engineering Change Order) Tracking and Status Report Document Control Systems, Procedures, Forms and Templates 1
T ECO (Engineering Change Order) Implementation checklist/work instruction Document Control Systems, Procedures, Forms and Templates 6
V How to measure ECO (Engineering Change Order) ISO 9000, ISO 9001, and ISO 9004 Quality Management Systems Standards 2
M Engineering Change Request/Order (ECR/ECO) or Document Change Request/Order (DCR/DCO) Document Control Systems, Procedures, Forms and Templates 30
R ECO (Engineering Change Order) Question for all experts (fill the blanks) Document Control Systems, Procedures, Forms and Templates 4
K ECO (Engineering Change Order) Revision - Letter change or part number change? Manufacturing and Related Processes 13
Raffy ECN (Engineering Change Notice) / ECO (Engineering Change Order) System Document Control Systems, Procedures, Forms and Templates 1
N Engineering Changes (ECR, ECO, ECN) and how they should be Structured Document Control Systems, Procedures, Forms and Templates 6
Q Filtering ECR/ECO by quality management? Managing Engineering Changes ISO 9000, ISO 9001, and ISO 9004 Quality Management Systems Standards 2
A Design Change/ECO Related Question 21 CFR Part 820 - US FDA Quality System Regulations (QSR) 1
D Question regarding ECO process, specifically for Life Science products and defining form fit and function ISO 13485:2016 - Medical Device Quality Management Systems 1
P ECO Disposition - Deviation Needed for Use As Is? AS9100, IAQG, NADCAP and Aerospace related Standards and Requirements 5
T Electronic ECO/ECR Process - Software recommendations Document Control Systems, Procedures, Forms and Templates 3
R Parts included/not included in ECO/ECN Document Control Systems, Procedures, Forms and Templates 1
H Drowning in ECR/ECO/ECN Document Changes Document Control Systems, Procedures, Forms and Templates 11
J ECR to ECO to ECN Procedure and numbering system Document Control Systems, Procedures, Forms and Templates 4
J Introducing a new Product Variant - ECO Process? Document Control Systems, Procedures, Forms and Templates 3
Q Are ECO's closed after they are shown to be Effective? ISO 9000, ISO 9001, and ISO 9004 Quality Management Systems Standards 9
Q How raise en ECO starting from a NC - ECO after NCR? ISO 9000, ISO 9001, and ISO 9004 Quality Management Systems Standards 8
L Developing an Access ECO Tracking Database - Need help Document Control Systems, Procedures, Forms and Templates 8
D Official Clarification of ECO, PDR, PCR Acronym Definitions ISO 9000, ISO 9001, and ISO 9004 Quality Management Systems Standards 12
M How NCR CAR and ECO Interact - Customer Rejection Document Control Systems, Procedures, Forms and Templates 5
M CAR vs ECO/ECN - How do I merge CAR with ECO or ECR/ECN procedure seemlessly Document Control Systems, Procedures, Forms and Templates 5
M Differences between ISO 14001 and EU Eco-Management and Audit Scheme (EMAS) ISO 14001:2015 Specific Discussions 2
M Looking for an ECO/ECN logging software Document Control Systems, Procedures, Forms and Templates 3
M Documentation for Health & Safety (OSHA) require ECO's? ISO 13485:2016 - Medical Device Quality Management Systems 11
J Drawing Revision History Question... Signature on EO or ECO Document Control Systems, Procedures, Forms and Templates 18
N Corrective Actions and ECOs - If an ECO addresses the issue, why do we do CARs ? Nonconformance and Corrective Action 16
ScottK Opening for Manager, Supplier Quality Engineering on my team- Orangeburg, NY - On-site Job Openings, Consulting and Employment Opportunities 0
H Regarding Usability Engineering File according to IEC 62366-1 CE Marking (Conformité Européene) / CB Scheme 2
Stefan Mundt AS9100D Engineering sample purchases - Supplier not approved AS9100, IAQG, NADCAP and Aerospace related Standards and Requirements 3
J Quality Engineering Long Term Career Advice Career and Occupation Discussions 6
Q Is engineering a process and should it have its own process turtle? IATF 16949 - Automotive Quality Systems Standard 7
D Engineering Change order vs. Change Control ISO 13485:2016 - Medical Device Quality Management Systems 3
K Bioreactor/ incubator system in tissue engineering EU Medical Device Regulations 9
K Supplier Qualification for Engineering Consultant? Supplier Quality Assurance and other Supplier Issues 3
Marc Engineering Technician - Suspense 5 April 2021 Job Openings, Consulting and Employment Opportunities 0
Marc Engineering Technician - Suspense 11 February 2021 Job Openings, Consulting and Employment Opportunities 0
Bev D Essential References for Practical Quality Engineering Misc. Quality Assurance and Business Systems Related Topics 0
Revision36 Engineering Change Order Industry Standards Other Medical Device and Orthopedic Related Topics 7

Similar threads

Top Bottom