Engineering Change Order (ECO) metrics to track

duff999

Involved In Discussions
#1
I am wondering what type of metrics folks are tracking for engineering change order implementations. Any feedback is appreciated.

Thanks
 
Elsmar Forum Sponsor

duff999

Involved In Discussions
#3
Part of our SOP creation process has a section for process metrics, I was doing some brainstorming on what other might track
 

Tidge

Trusted Information Resource
#5
Part of our SOP creation process has a section for process metrics, I was doing some brainstorming on what other might track
This is a somewhat loaded statement. As @Jim Wynne notes: without knowing the details of the process (including what is expected), it can be hard to come up with a meaningful metric for you.

There could be all sorts of metrics depending on the implementation of the ECO process. For example: Time between initiation of a change and completion of the change (changes that take a long time could imply ECO started too soon), effectiveness of the change (any NCRs as a result of the change?), number of incomplete ECO (could be a lack of personnel), etc.
 

duff999

Involved In Discussions
#6
This is a somewhat loaded statement. As @Jim Wynne notes: without knowing the details of the process (including what is expected), it can be hard to come up with a meaningful metric for you.

There could be all sorts of metrics depending on the implementation of the ECO process. For example: Time between initiation of a change and completion of the change (changes that take a long time could imply ECO started too soon), effectiveness of the change (any NCRs as a result of the change?), number of incomplete ECO (could be a lack of personnel), etc.
This is a somewhat loaded statement. As @Jim Wynne notes: without knowing the details of the process (including what is expected), it can be hard to come up with a meaningful metric for you.

There could be all sorts of metrics depending on the implementation of the ECO process. For example: Time between initiation of a change and completion of the change (changes that take a long time could imply ECO started too soon), effectiveness of the change (any NCRs as a result of the change?), number of incomplete ECO (could be a lack of personnel), etc.

Great feedback, thanks
 

Steve Prevette

Deming Disciple
Staff member
Super Moderator
#7
I've monitored ECN (Engineering Change Notice) systems in the past. A lot also depends on if you system allows for "pen and ink" / temporary changes that are applied immediately to keep the job going, and the documentation gets caught up later. I'd look at:

Time to process change
Verification / Validation (percent compliant) data that the change was properly done
Backlog of unprocessed changes
Age histogram of how many days the unprocessed changes have been open
Why were the changes needed in the first place (a design problem versus a planned upgrade / modification for example)
Verification (percent compliant) that the documentation in use in the field is current based upon periodic observations.
 
Thread starter Similar threads Forum Replies Date
D Engineering Change order vs. Change Control ISO 13485:2016 - Medical Device Quality Management Systems 3
Revision36 Engineering Change Order Industry Standards Other Medical Device and Orthopedic Related Topics 6
D ECO (Engineering Change Order) process questions ISO 13485:2016 - Medical Device Quality Management Systems 7
Icy Mountain Engineering Change Order...Modification Order Document Control Systems, Procedures, Forms and Templates 18
S Engineering change order versus a design change request ISO 13485:2016 - Medical Device Quality Management Systems 1
M ECO (Engineering Change Order) Record Filing Question Records and Data - Quality, Legal and Other Evidence 1
T Need help developing an ECO (Engineering Change order) procedure Document Control Systems, Procedures, Forms and Templates 3
C Documents not controlled by the ECO (Engineering Change Order) process ISO 9000, ISO 9001, and ISO 9004 Quality Management Systems Standards 4
J ECO (Engineering Change Order) Control for Unreleased Products Document Control Systems, Procedures, Forms and Templates 3
Q How to close the circle QMS and ECO (Engineering Change Order)? ISO 9000, ISO 9001, and ISO 9004 Quality Management Systems Standards 5
Q Document Control ECO (Engineering Change Order) or QMS? ISO 9000, ISO 9001, and ISO 9004 Quality Management Systems Standards 14
D ECO (Engineering Change Order) Risk Management Criteria and QA Document Control Systems, Procedures, Forms and Templates 19
M ECO (Engineering Change Order) Tracking and Status Report Document Control Systems, Procedures, Forms and Templates 1
T ECO (Engineering Change Order) Implementation checklist/work instruction Document Control Systems, Procedures, Forms and Templates 6
V How to measure ECO (Engineering Change Order) ISO 9000, ISO 9001, and ISO 9004 Quality Management Systems Standards 2
M Engineering Change Request/Order (ECR/ECO) or Document Change Request/Order (DCR/DCO) Document Control Systems, Procedures, Forms and Templates 30
R ECO (Engineering Change Order) presentation Document Control Systems, Procedures, Forms and Templates 2
R ECO (Engineering Change Order) Question for all experts (fill the blanks) Document Control Systems, Procedures, Forms and Templates 4
K ECO (Engineering Change Order) Revision - Letter change or part number change? Manufacturing and Related Processes 13
M Using M-1 Software for Quality - Manual Engineering Change Order Entry Quality Assurance and Compliance Software Tools and Solutions 1
CarolX Preventive Action (PA) - Employee Suggestion Box, Engineering Change Order? Preventive Action and Continuous Improvement 12
Raffy ECN (Engineering Change Notice) / ECO (Engineering Change Order) System Document Control Systems, Procedures, Forms and Templates 1
R Do we need issue ECN (Engineering Change Notice) towards updated Material Specification? Design and Development of Products and Processes 2
C E signatures on Engineering Change Notes AS9100 / AS9116 AS9100, IAQG, NADCAP and Aerospace related Standards and Requirements 3
J Class 1 Medical Device ECR (Engineering Change Request) Changes 21 CFR Part 820 - US FDA Quality System Regulations (QSR) 4
A Software Suggestions for Engineering Change/QMS Design and Development of Products and Processes 2
Q Change of fields - Quality Engineering Electronics Vs medical Devices Career and Occupation Discussions 20
T Engineering Change Management Systems Document Control Systems, Procedures, Forms and Templates 3
M Engineering Change Management Generic Procedure Manufacturing and Related Processes 3
S Ford Motor Engineering Change Level definition Customer and Company Specific Requirements 6
D How to process Customer ECO's (Engineering Change Orders) ISO 9000, ISO 9001, and ISO 9004 Quality Management Systems Standards 5
Q ECR (Engineering Change Request) or NCR (Nonconformance Report) in Fabrication? ISO 9000, ISO 9001, and ISO 9004 Quality Management Systems Standards 12
L Engineering Change Control Software Systems - Recommendations? Document Control Systems, Procedures, Forms and Templates 2
L The Perfect Engineering Change and Concessions Management System Document Control Systems, Procedures, Forms and Templates 8
M Formula for Prioritizing Engineering Change Requests (ECR)? Document Control Systems, Procedures, Forms and Templates 1
D Management of Change - MOC Procedure and Forms - Engineering, Project, Safety Systems Manufacturing and Related Processes 1
Q ECR?s (Engineering Change Requests) in Engineering? ISO 9000, ISO 9001, and ISO 9004 Quality Management Systems Standards 4
M Is ECN (Engineering Change Notice) Necessary for Part Number Change IATF 16949 - Automotive Quality Systems Standard 4
Q How to monitor Engineering Change Requests? Document Control Systems, Procedures, Forms and Templates 7
D Launch Change Request Form vs. Engineering Change Form Document Control Systems, Procedures, Forms and Templates 5
J Engineering/Document Change Notice Procedure required? ISO 9000, ISO 9001, and ISO 9004 Quality Management Systems Standards 4
P How to specify criteria for TECN (Temporary Engineering Change Notice) Document Control Systems, Procedures, Forms and Templates 3
T From ECR (Engineering Change Request) to ECN (Engineering Change Note) - double work! Document Control Systems, Procedures, Forms and Templates 2
M Definition Engineering Change and Document Change - Definitions Definitions, Acronyms, Abbreviations and Interpretations Listed Alphabetically 2
9 ECR (Engineering Change Request) process - Please critique / review Document Control Systems, Procedures, Forms and Templates 10
P Managing ECN (Engineering Change Notice) Blueprints Database..any solutions? Document Control Systems, Procedures, Forms and Templates 2
Q How to implement an External Engineering Change ISO 9000, ISO 9001, and ISO 9004 Quality Management Systems Standards 2
W Engineering ECR (Engineering Change Request) and ECN (Eng Change Notice) Procedures Document Control Systems, Procedures, Forms and Templates 3
K When to use an Engineering Change Request (ECR) Document Control Systems, Procedures, Forms and Templates 8
J Automated Engineering Specification Change Notifications? IATF 16949 - Automotive Quality Systems Standard 5

Similar threads

Top Bottom