Engineering change order versus a design change request

S

snoopy2017

#1
Hi everyone,

Working at a small company with a not quite-so mature QMS, I have noticed that there is no engineering change control for various changes to technical documents including DHFs and DMRs. There is a design change request but only for changes to design including changes to various components in the devices. In the past, changes to tech documents have bee implemented through the general change control system used for revisions to SOPs and etc.
Does anyone recommend an ECO system? Thanks.
 
Elsmar Forum Sponsor

John Broomfield

Staff member
Super Moderator
#2
Hi everyone,

Working at a small company with a not quite-so mature QMS, I have noticed that there is no engineering change control for various changes to technical documents including DHFs and DMRs. There is a design change request but only for changes to design including changes to various components in the devices. In the past, changes to tech documents have bee implemented through the general change control system used for revisions to SOPs and etc.
Does anyone recommend an ECO system? Thanks.
Snoopy,

Larger projects and engineering companies split the process of controlling design changes in two:

1. Anyone can request a design change with their boss’s approval using an ECR.

2. That ECR (and, possibly, other ECRs for the same item) may result in an ECO with updated drawings and specs after verifying and then validating the change.

Smaller organizations route approved ECRs to the design team for action that then results in updated drawings/specs being issued to the users.

So, the ECO is a way of announcing a change without all the recipients having to review the design information itself.

So, it depends on what your organization needs to be effective.

John
 
Thread starter Similar threads Forum Replies Date
D Engineering Change order vs. Change Control ISO 13485:2016 - Medical Device Quality Management Systems 3
Revision36 Engineering Change Order Industry Standards Other Medical Device and Orthopedic Related Topics 6
D ECO (Engineering Change Order) process questions ISO 13485:2016 - Medical Device Quality Management Systems 7
D Engineering Change Order (ECO) metrics to track ISO 13485:2016 - Medical Device Quality Management Systems 6
Icy Mountain Engineering Change Order...Modification Order Document Control Systems, Procedures, Forms and Templates 18
M ECO (Engineering Change Order) Record Filing Question Records and Data - Quality, Legal and Other Evidence 1
T Need help developing an ECO (Engineering Change order) procedure Document Control Systems, Procedures, Forms and Templates 3
C Documents not controlled by the ECO (Engineering Change Order) process ISO 9000, ISO 9001, and ISO 9004 Quality Management Systems Standards 4
J ECO (Engineering Change Order) Control for Unreleased Products Document Control Systems, Procedures, Forms and Templates 3
Q How to close the circle QMS and ECO (Engineering Change Order)? ISO 9000, ISO 9001, and ISO 9004 Quality Management Systems Standards 5
Q Document Control ECO (Engineering Change Order) or QMS? ISO 9000, ISO 9001, and ISO 9004 Quality Management Systems Standards 14
D ECO (Engineering Change Order) Risk Management Criteria and QA Document Control Systems, Procedures, Forms and Templates 19
M ECO (Engineering Change Order) Tracking and Status Report Document Control Systems, Procedures, Forms and Templates 1
T ECO (Engineering Change Order) Implementation checklist/work instruction Document Control Systems, Procedures, Forms and Templates 6
V How to measure ECO (Engineering Change Order) ISO 9000, ISO 9001, and ISO 9004 Quality Management Systems Standards 2
M Engineering Change Request/Order (ECR/ECO) or Document Change Request/Order (DCR/DCO) Document Control Systems, Procedures, Forms and Templates 30
R ECO (Engineering Change Order) presentation Document Control Systems, Procedures, Forms and Templates 2
R ECO (Engineering Change Order) Question for all experts (fill the blanks) Document Control Systems, Procedures, Forms and Templates 4
K ECO (Engineering Change Order) Revision - Letter change or part number change? Manufacturing and Related Processes 13
M Using M-1 Software for Quality - Manual Engineering Change Order Entry Quality Assurance and Compliance Software Tools and Solutions 1
CarolX Preventive Action (PA) - Employee Suggestion Box, Engineering Change Order? Preventive Action and Continuous Improvement 12
Raffy ECN (Engineering Change Notice) / ECO (Engineering Change Order) System Document Control Systems, Procedures, Forms and Templates 1
R Do we need issue ECN (Engineering Change Notice) towards updated Material Specification? Design and Development of Products and Processes 2
C E signatures on Engineering Change Notes AS9100 / AS9116 AS9100, IAQG, NADCAP and Aerospace related Standards and Requirements 3
J Class 1 Medical Device ECR (Engineering Change Request) Changes 21 CFR Part 820 - US FDA Quality System Regulations (QSR) 4
A Software Suggestions for Engineering Change/QMS Design and Development of Products and Processes 2
Q Change of fields - Quality Engineering Electronics Vs medical Devices Career and Occupation Discussions 20
T Engineering Change Management Systems Document Control Systems, Procedures, Forms and Templates 3
M Engineering Change Management Generic Procedure Manufacturing and Related Processes 3
S Ford Motor Engineering Change Level definition Customer and Company Specific Requirements 6
D How to process Customer ECO's (Engineering Change Orders) ISO 9000, ISO 9001, and ISO 9004 Quality Management Systems Standards 5
Q ECR (Engineering Change Request) or NCR (Nonconformance Report) in Fabrication? ISO 9000, ISO 9001, and ISO 9004 Quality Management Systems Standards 12
L Engineering Change Control Software Systems - Recommendations? Document Control Systems, Procedures, Forms and Templates 2
L The Perfect Engineering Change and Concessions Management System Document Control Systems, Procedures, Forms and Templates 8
M Formula for Prioritizing Engineering Change Requests (ECR)? Document Control Systems, Procedures, Forms and Templates 1
D Management of Change - MOC Procedure and Forms - Engineering, Project, Safety Systems Manufacturing and Related Processes 1
Q ECR?s (Engineering Change Requests) in Engineering? ISO 9000, ISO 9001, and ISO 9004 Quality Management Systems Standards 4
M Is ECN (Engineering Change Notice) Necessary for Part Number Change IATF 16949 - Automotive Quality Systems Standard 4
Q How to monitor Engineering Change Requests? Document Control Systems, Procedures, Forms and Templates 7
D Launch Change Request Form vs. Engineering Change Form Document Control Systems, Procedures, Forms and Templates 5
J Engineering/Document Change Notice Procedure required? ISO 9000, ISO 9001, and ISO 9004 Quality Management Systems Standards 4
P How to specify criteria for TECN (Temporary Engineering Change Notice) Document Control Systems, Procedures, Forms and Templates 3
T From ECR (Engineering Change Request) to ECN (Engineering Change Note) - double work! Document Control Systems, Procedures, Forms and Templates 2
M Definition Engineering Change and Document Change - Definitions Definitions, Acronyms, Abbreviations and Interpretations Listed Alphabetically 2
9 ECR (Engineering Change Request) process - Please critique / review Document Control Systems, Procedures, Forms and Templates 10
P Managing ECN (Engineering Change Notice) Blueprints Database..any solutions? Document Control Systems, Procedures, Forms and Templates 2
Q How to implement an External Engineering Change ISO 9000, ISO 9001, and ISO 9004 Quality Management Systems Standards 2
W Engineering ECR (Engineering Change Request) and ECN (Eng Change Notice) Procedures Document Control Systems, Procedures, Forms and Templates 3
K When to use an Engineering Change Request (ECR) Document Control Systems, Procedures, Forms and Templates 8
J Automated Engineering Specification Change Notifications? IATF 16949 - Automotive Quality Systems Standard 5

Similar threads

Top Bottom