Establishing a QMS - What Daily/Weekly/Monthly activities in Auto Industry

M

maria1001

Hello, I have joined as Manager in Auto Industry. System and Manpower is lacking. I need to reestablish QMS. Can you tell me what daily/weekly/monthly/quarterly/annually to be carried out.
Sections
BIW
Body Fabrication
Vehicle Assembly
Painting
Machining
Final Inspection
 

Jen Kirley

Quality and Auditing Expert
Leader
Admin
Welcome to the Cove!

I am afraid I do not understand your question. Can you please present a question in more specific terms?
 
S

ssz102

sorry, i don't understand what 's daily and weekly activities you mentioned
but, you should develop a plan for establish QMS and assign some responsibilities to ralate depts
 
A

amit_rd

Hello,

Before identifying what you need to do daily, weekly, monthly or annualy.You need to find out the exact scope of QMS for your organization and present to the management how it may be achieved (an initial gap analysis may be required). This will give you a chance to identify all resource requirements and also the management support.

If you don't get direct team members, try getting representative from every function so that they work as QMS representatives in their respective area. This way you may have un accounted resources and also lesser people to interact with.

This initial step should tell you already your priorities and how should you monitor them - daily, weekly, monthly or annualy. Best of luck.
 

qusys

Trusted Information Resource
Hello, I have joined as Manager in Auto Industry. System and Manpower is lacking. I need to reestablish QMS. Can you tell me what daily/weekly/monthly/quarterly/annually to be carried out.
Sections
BIW
Body Fabrication
Vehicle Assembly
Painting
Machining
Final Inspection

Agree with all other Covers. You could start as a first stage to fix the gaps vs the ISO standard that you have found with your gap assessment, based upon the outcomes you have written.
needed a project mgmt approach, multidisciplinary approach and above all top management sponsorship.
You should work at each level to renew the quality culture, starting from the little things and celebrate success. Then , step by step, put n place a quality program, including training, internal audit, quality tools understanding and usage and montioring progresses.:bigwave:
 
Thread starter Similar threads Forum Replies Date
A How to do Equipment Validation - Establishing our ISO 13485 QMS procedures Qualification and Validation (including 21 CFR Part 11) 34
Douglas E. Purdy Transition to ISO 9001:2000 - RFI - 009, RFI-003, & Establishing a QMS ISO 9000, ISO 9001, and ISO 9004 Quality Management Systems Standards 9
A Help required in establishing Laboratory Information Management System as per ISO 17025, Cl.7.11.2 ISO 17025 related Discussions 0
A Establishing an initial audit schedule for Pharma Suppliers General Auditing Discussions 2
B Establishing topics for IATF internal audit processes Internal Auditing 9
qualprod Criteria % to be useful in establishing Kpis ISO 9000, ISO 9001, and ISO 9004 Quality Management Systems Standards 19
B Establishing a Data Analysis Procedure ISO 9000, ISO 9001, and ISO 9004 Quality Management Systems Standards 6
A Help establishing regulatory requirements - Plastic dental cartridge syringe US Food and Drug Administration (FDA) 0
K ISO 13485 section 5.3 Quality Policy - No framework for establishing and reviewing quality objectives ISO 13485:2016 - Medical Device Quality Management Systems 2
N Use part of high risk device for establishing low risk device EU Medical Device Regulations 0
J ISO 13485:2016 Section 6.2 - Documenting the process for establishing competence ISO 13485:2016 - Medical Device Quality Management Systems 6
M Establishing a FTQ (First Time Quality) process for an engine assembly line Quality Tools, Improvement and Analysis 1
R Establishing the quality policy for ISO 9001:2015 ISO 9000, ISO 9001, and ISO 9004 Quality Management Systems Standards 10
N Establishing a monthly scrap cost target Lean in Manufacturing and Service Industries 11
T Establishing -F- datum - need advice Inspection, Prints (Drawings), Testing, Sampling and Related Topics 2
S Establishing a Gage R&R Studies Program in a Testing Laboratory Gage R&R (GR&R) and MSA (Measurement Systems Analysis) 1
M Establishing traceability from calibrated glassware to non calibrated ones General Measurement Device and Calibration Topics 5
O Establishing SPC for small batches of 10-15 units Statistical Analysis Tools, Techniques and SPC 10
M Establishing Metrics - Where do you document metrics? AS9100, IAQG, NADCAP and Aerospace related Standards and Requirements 7
alonFAI Establishing a Receiving Inspection Procedure Document Control Systems, Procedures, Forms and Templates 5
optomist1 Establishing Sigma or Capabilty Indices for Automotive Safety Quality Tools, Improvement and Analysis 1
S Establishing an MSA Plan and Justification Suggestions wanted Gage R&R (GR&R) and MSA (Measurement Systems Analysis) 1
T Help establishing a good Customer Complaints Procedure? ISO 9000, ISO 9001, and ISO 9004 Quality Management Systems Standards 3
V Process Validation Guidance establishing the Integration with QbD - April 2012 Pharmaceuticals (21 CFR Part 210, 21 CFR Part 211 and related Regulations) 1
M Establishing Ranges for Weights for Calibration Verification of a Micro-Balance Calibration Frequency (Interval) 1
D Preparing for ISO 29001/API Q1- Establishing Control Features Oil and Gas Industry Standards and Regulations 3
D Establishing Key Process Characteristics (KPC's) Quality Tools, Improvement and Analysis 6
C New Quality Manager - Establishing Teams in different Business Units Quality Manager and Management Related Issues 4
H Noob Frequency Distribution and establishing achievable goals Using Minitab Software 2
K How to apply IEC 62366 and what shall be changed in establishing a Technical File ISO 13485:2016 - Medical Device Quality Management Systems 2
M Establishing monthly production targets with varying number of employees Lean in Manufacturing and Service Industries 6
A Why do I need batch size in establishing control plan to certain AQL?? AQL - Acceptable Quality Level 4
E Need help establishing a DMR (Device Master Record) 21 CFR Part 820 - US FDA Quality System Regulations (QSR) 3
K Basis for Establishing Gage Tolerancing - "Gage Maker's Tolerances" General Measurement Device and Calibration Topics 4
K Establishing the Environmental Aspects and Impacts for a Septic Tank Miscellaneous Environmental Standards and EMS Related Discussions 5
M Establishing simple procedure and work instruction using chart or photo or video Document Control Systems, Procedures, Forms and Templates 2
L Criteria for Establishing Control Plan Sample Size and Inspection Frequency FMEA and Control Plans 7
K Inventory Management - Establishing a procedure for Inventory Management Document Control Systems, Procedures, Forms and Templates 2
K Establishing Item Codes for Production Raw Materials Misc. Quality Assurance and Business Systems Related Topics 2
O Establishing the current value of KPI's (Key Performance Indicators) Manufacturing and Related Processes 1
Y Establishing and Measuring Individual Performance to Product Quality Standards Misc. Quality Assurance and Business Systems Related Topics 5
C Establishing alert and action limits for clean room bioburden Other Medical Device and Orthopedic Related Topics 9
E Establishing a biocompability test lab for testing EN 10993 series EU Medical Device Regulations 1
D Establishing and controlling process capability - Meaning of Phrases Capability, Accuracy and Stability - Processes, Machines, etc. 2
P Establishing Thickness Specifications from Measured Data Capability, Accuracy and Stability - Processes, Machines, etc. 11
armani Initial condition for establishing significant environmental aspects Miscellaneous Environmental Standards and EMS Related Discussions 1
S Establishing Control of Regulations that concern my company Quality Manager and Management Related Issues 12
D Establishing New Training Procedure - Past Training of Existing Employees Training - Internal, External, Online and Distance Learning 6
J Establishing Proposal Metrics in a Factory Construction Company Quality Tools, Improvement and Analysis 6
B True Position without tertiary datum? Establishing a proper rotation Inspection, Prints (Drawings), Testing, Sampling and Related Topics 12

Similar threads

Top Bottom