Example APQP Characteristics Matrix

B

bool2004

#1
I am student,just want to review the form of the Matrix.
Another problem is if I will draw a detailed flow chart of the APQP process,the first layer coves the 5 main steps,but how to draw a more detailed and decomposed diagram for each step? Can anyone do a help for me to show a example.
I am very regret for it's so expensive for me to purchase the APQP manual.
 
Last edited by a moderator:
Elsmar Forum Sponsor
S

s-bell

#2
bool2004 said:
I am student,just want to review the form of the Matrix.
Another problem is if I will draw a detailed flow chart of the APQP process,the first layer coves the 5 main steps,but how to draw a more detailed and decomposed diagram for each step? Can anyone do a help for me to show a example.
I am very regret for it's so expensive for me to purchase the APQP manual.
I have sent a copy of a characteristics matrix to your e-mail address.

With regards to your flow chart, are you looking to determine when and where items such as FMEA's fit into the APQP process?
 

Marc

Hunkered Down for the Duration with a Mask on...
Staff member
Admin
#3
s-bell said:
I have sent a copy of a characteristics matrix to your e-mail address.
Any chance I could beg you to upload it here as an attachment for others as well?
 

Marc

Hunkered Down for the Duration with a Mask on...
Staff member
Admin
#5
Re: Seeking: Example APQP Characteristics Matrix

Thank you! Attachment appreciated!
 
M

mexicanita

#6
s-bell said:
I have sent a copy of a characteristics matrix to your e-mail address.

With regards to your flow chart, are you looking to determine when and where items such as FMEA's fit into the APQP process?
Taking advantaje of bool2004 request.... I'm also working trying to diagram the APQP process and determinate each activitie's input/output( special interest in predecessors activities).
We currently are using a excell work sheet to list all activities related, but honestly isn't help to much to see who is waiting from who to initiate the documentation/activity......any help will be appreciated.
 
A

amr1234

#7
Process Flow Diagram

We are having a discussion on the numbering of "Storage" and "Moves" on the process flow diagrams. Do we number these moves or do we leave them un numbered? Then, does the numbering carry over to the FMEA and the Control Plan OR.. may we eliminate the numbers for the storage and the moves?

Thanks :bonk:
 
B

Bill Ryan - 2007

#8
amr1234 said:
We are having a discussion on the numbering of "Storage" and "Moves" on the process flow diagrams. Do we number these moves or do we leave them un numbered? Then, does the numbering carry over to the FMEA and the Control Plan OR.. may we eliminate the numbers for the storage and the moves?

Thanks :bonk:
I number all storages, moves and inspection steps and, YES, they carry over to the PFMEA and Control Plan. A couple of our customers have stated that "if it is a step in your processing flow, it needs to be numbered". I have just carried it over to all customers.

Is it really necessary to number any "step"? Probably not as long as the processing actions flow the same way between documents. I'm not sure of the history of the "requirement".

Good luck!!

Bill
 
M

martin elliott

#9
amr1234 said:
We are having a discussion on the numbering of "Storage" and "Moves" on the process flow diagrams. Do we number these moves or do we leave them un numbered? Then, does the numbering carry over to the FMEA and the Control Plan OR.. may we eliminate the numbers for the storage and the moves?

Thanks :bonk:
I like Bill also number moves storage inspection etc and include all numbered operations on all documents but additionally, where applicable ,put a comment such as "Process Included for Information Only – Inspection element of each failure mode is included within the Detection criteria on individual process failure modes"

Always found it far easier to explain if numbering is consistent and hate checking incoming PPAP's which are inconsistent in numbering.

Regards Martin
 

Howard Atkins

Forum Administrator
Staff member
Admin
#10
Storage and moves are actions that need to be controlled and I am sure that you control them. Some components or raw materials need special conditions. Movement can be to the wrong places, wrong times etc.
These should be refered to in the FMEA and the control plan. Most of the Failure Modes are plant wide but some could be specific depending on your industry and/or product.
A manner of dealing with these operations is to perform a plant wide FMEA on storage, movement and other general issues, after all this is not only to submit to the customer it is for you.
This is a good way to get staff that might never be involved in such actions aligned with the tools.
You might be surprised at what you learn.
Update these FMEA's every year, after all the control plan for these operations is in fact your procedures/work instructions etc.

As for numbering I always used increments of 10 to enable me to number additional stages with the sequential number.
 
Thread starter Similar threads Forum Replies Date
B Would anyone have an example of an APQP flowchart? APQP and PPAP 8
C APQP Meeting Agenda - Need Example and How to keep the meetings focused & on track APQP and PPAP 7
O APQP Procedure Example Needed APQP and PPAP 1
J Example of a defined procedure for carrying out Material Review Board (MRB) Manufacturing and Related Processes 0
S IATF 16949 Internal Audit Example IATF 16949 - Automotive Quality Systems Standard 7
N Example for design and development planning,input,output,review,verification,validation and transfer Misc. Quality Assurance and Business Systems Related Topics 4
optomist1 Paynter Chart Example APQP and PPAP 1
M Data Protection and Privacy Policy - looking for a template/example EU Medical Device Regulations 1
A Verification protocol example Design and Development of Products and Processes 2
Q Example Process orientation to the process leadership, management, goals (tasks of the top management) ISO 9000, ISO 9001, and ISO 9004 Quality Management Systems Standards 10
Q Example of the Risk Template Document Control Systems, Procedures, Forms and Templates 1
D Test summary report example for design validation wanted - ISO 13485 ISO 13485:2016 - Medical Device Quality Management Systems 1
M Risk managment report of Surgical Mask Example ISO 14971 - Medical Device Risk Management 14
M Example of statement for procedure pack MDR Article 22? Elsmar Cove Forum Suggestions, Complaints, Problems and Bug Reports 0
A 5 x 5 Risk Matrix - Looking for a good example Manufacturing and Related Processes 2
N Post Market Surveillance Package Example Wanted ISO 13485:2016 - Medical Device Quality Management Systems 1
D Calibration Process Flow Map Example Wanted General Measurement Device and Calibration Topics 3
D Redacted 510(k)s - Example wanted Document Control Systems, Procedures, Forms and Templates 17
F Hi friends, can anyone show me an example of a procedure for ISO 13485 6.4.1 Work Environment? ISO 13485:2016 - Medical Device Quality Management Systems 2
DuncanGibbons Looking for example aerospace part CAD files to be used for a case study Career and Occupation Discussions 2
M An example of risk analysis of class I MD ISO 14971 - Medical Device Risk Management 36
Jimmy123 Example of a P-Diagram for Process FMEA - Uncontrollable noises FMEA and Control Plans 39
D Monitoring and measuring resources - Example of how section ISO 9001 7.1.5 would apply to a manufacture of software ISO 9000, ISO 9001, and ISO 9004 Quality Management Systems Standards 4
D Validation of existing equipment - Risk based approach example ISO 13485:2016 - Medical Device Quality Management Systems 3
A ISO/TS 22163 Item 5.2.4 Safety policy - Example wanted Other ISO and International Standards and European Regulations 2
F Internal Audit - Procedure example Internal Auditing 5
I Functional Safety Analysis/Report Example IEC 60601 - Medical Electrical Equipment Safety Standards Series 6
H Man Hour Plan 145.A.30 example needed EASA and JAA Aviation Standards and Requirements 0
R Real Example of a currently marketed Procedure Pack CE Marking (Conformité Européene) / CB Scheme 1
D Example for Accessories of "Annex XVI non-medical devices" and how to classify it now with respect ot EU MDR Other Medical Device Regulations World-Wide 1
MichaelDRoach Oganization's Self Declaration of Conformance to ISO 28000 wording example wanted Supply Chain Security Management Systems 1
A Australia TGA Medical Device Sponsor Agreement - Example or Template Other Medical Device Regulations World-Wide 18
J ISO 13485 8.4 Analysis of Data - Procedure example ISO 13485:2016 - Medical Device Quality Management Systems 1
S Question about a basic additive variance/tolerance example Quality Tools, Improvement and Analysis 2
N ISO 9001: 2015 - Example standards policies, procedures, acknowledgements and checklists ISO 9000, ISO 9001, and ISO 9004 Quality Management Systems Standards 1
M AS9100d (section 7.1.3) example of compliance in machine shop environment. AS9100, IAQG, NADCAP and Aerospace related Standards and Requirements 3
supadrai How does the FDA count violations of, for example, misbranding? (Medical Devices) Other US Medical Device Regulations 1
E Labware cleaning validation protocol example Qualification and Validation (including 21 CFR Part 11) 1
D Laboratory Manual ISO/IEC 17025 Example wanted ISO 17025 related Discussions 2
P Template or example Excel list of ISO certificates issued to clients ISO 9000, ISO 9001, and ISO 9004 Quality Management Systems Standards 5
T Example wanted - Template for internal audit IATF 16949 IATF 16949 - Automotive Quality Systems Standard 1
M Example ISO 14971 policy and risk criteria ISO 14971 - Medical Device Risk Management 0
D System Level FMEA example wanted FMEA and Control Plans 2
E Example of 9001:2015 audit report with non-conformances ISO 9000, ISO 9001, and ISO 9004 Quality Management Systems Standards 5
A IATF 16949 Cl. 8.4.1.2 Supplier Selection Process - assessment example IATF 16949 - Automotive Quality Systems Standard 11
D Where I can find an ISO 13485:2016 Audit Schedule example? ISO 13485:2016 - Medical Device Quality Management Systems 4
R Clinical evaluation Meddev (2.7.1 revision 4) - Example or Template EU Medical Device Regulations 4
A IATF 16949 - 9.2.2.1 Internal Audit Programme - looking for example IATF 16949 - Automotive Quality Systems Standard 5
S Looking for an example of a medical device file ISO 13485:2016 - Medical Device Quality Management Systems 1
C PFMEA example with machining (lathe+mill) FMEA and Control Plans 1

Similar threads