Exclusion of AS9100C Clause 7.1.1 and Clause 7.1.3 for a Small Shop

dsanabria

Quite Involved in Discussions
#1
We just had our upgrade to AS9100 Rev C and the auditors told us that because we are a small shop (12 individuals) and all we do is cut large pieces to small shape (per print) that we could invoke the exclusion requirements of 7.1.1 Project Management and 7.1.3 Configuration Management.

Just wanted to know if any small shops have a different take on this requirements.
 
Elsmar Forum Sponsor

DannyK

Trusted Information Resource
#2
Re: Exclusion of AS9100C 7.1.1 and 71.3 for a small shop

We just had our upgrade to AS9100 Rev C and the auditors told us that because we are a small shop (12 individuals) and all we do is cut large pieces to small shape (per print) that we could invoke the exclusion requirements of 7.1.1 Project Management and 7.1.3 Configuration Management.

Just wanted to know if any small shops have a different take on this requirements.
I totally disagree with excluding Project Management & Configuration Management.
When the small shop gets an order, isn't there any configuration information provided?
Does anyone in the shop plan the production to ensure that the required resources are available and the schedule is being met?
 

Sidney Vianna

Post Responsibly
Leader
Admin
#3
Re: Exclusion of AS9100C 7.1.1 and 7.1.3 for a small shop

We just had our upgrade to AS9100 Rev C and the auditors told us that because we are a small shop (12 individuals) and all we do is cut large pieces to small shape (per print) that we could invoke the exclusion requirements of 7.1.1 Project Management and 7.1.3 Configuration Management.

Just wanted to know if any small shops have a different take on this requirements.
Personally, I do agree with the exclusions in that scenario. However, the "authors" of AS9100 seem to think that PM and CM must apply to ALL AS&D organizations, irrespective of size, product, etc... At least, that is what I conclude after reading the IAQG 9100 Change & Rationale document, which stipulates:
Project management is an important new topic introduced at this update- important because every type and size of organization carries out ‘project management’ in some form or other. Project management is included in clause 7.1 because its requirements apply to all phases of the lifecycle
and
Configuration management is included now in clause 7.1 because its requirements apply to all phases of the lifecycle of products realization and use
I have repeatedly voiced my request for guidance on the scalability of PM, RM & CM for AS9100/9110 users that fit the Small & Medium size category. So far, nobody has listened.

It will be interesting to see if your CB will be able to identify PM and CM as non-applicable when they are entering the organization's data into OASIS.
 

Sidney Vianna

Post Responsibly
Leader
Admin
#4
Re: Exclusion of AS9100C 7.1.1 and 71.3 for a small shop

Does anyone in the shop plan the production to ensure that the required resources are available and the schedule is being met?
Wouldn't an ISO 9001-compliant machine shop have to do that, as well? ISO 9001 has no requirements for CM nor PM.
 

dsanabria

Quite Involved in Discussions
#5
Re: Exclusion of AS9100C 7.1.1 and 71.3 for a small shop

I totally disagree with excluding Project Management & Configuration Management.
When the small shop gets an order, isn't there any configuration information provided?
Does anyone in the shop plan the production to ensure that the required resources are available and the schedule is being met?
Section 7.1 covers that point completely in a small shop

And I quote
"The organization shall plan and develop the processes needed for product realization. Planning of product realization shall be consistent with the requirements of the other processes of the quality management system (see 4.1).
In planning product realization, the organization shall determine the following, as appropriate:

a) quality objectives and requirements for the product;
NOTE Quality objectives and requirements for the product include

consideration of aspects such as
- product and personal safety,
- reliability, availability and maintainability,
- producibility and inspectability,
- suitability of parts and materials used in the product,
- selection and development of embedded software, and
- recycling or final disposal of the product at the end of its life.
b) the need to establish processes and documents, and to provide resources specific to the product;
c) required verification, validation, monitoring, measurement, inspection and test activities specific to the product and the criteria for product acceptance;
d) records needed to provide evidence that the realization processes and resulting product meet requirements (see 4.2.4);
e"end of Quote) configuration management appropriate to the product;

Furthermore, if you read the note on 7.1.3 - it makes a reference to ISO 10007. After reading that spec, you will realize that an exclusion is justifiable.

This is what the 3rd party was pointing out - and we are taking it.
 
H

Hodgepodge

#6
We just had our upgrade to AS9100 Rev C and the auditors told us that because we are a small shop (12 individuals) and all we do is cut large pieces to small shape (per print) that we could invoke the exclusion requirements of 7.1.1 Project Management and 7.1.3 Configuration Management.

Just wanted to know if any small shops have a different take on this requirements.
As far as configuration management goes, the small shop making items to print is using the configuration defined by the customer. The product designer is maintaining/managing the configuration and the small shop is using it.

You may say this small company is exempt from this requirement but in reality, they still care about it. If there is a B/P change to work in progress and the change is flowed down, your company will make a change to the configuration of the part. If parts in WIP have already been completed and cannot be altered to match the new configuration, you will use the customer's configuration designations to communicate any issues to the customer. The supplier is not at fault when a change is made halfway through. “Sorry, 15 pieces were already completed to Rev A, the remaining 15 can be made to the new Rev B print but the cost will be an additional $XX.XX.”

The small company in this example does not need to document the configuration management process; it will be easily understood and easy to prove. The idea of claiming exemption from the requirement seems more difficult than proving use of the customer's preexisting configuration management.
 

dsanabria

Quite Involved in Discussions
#7
As far as configuration management goes, the small shop making items to print is using the configuration defined by the customer. The product designer is maintaining/managing the configuration and the small shop is using it.

You may say this small company is exempt from this requirement but in reality, they still care about it. If there is a B/P change to work in progress and the change is flowed down, your company will make a change to the configuration of the part. If parts in WIP have already been completed and cannot be altered to match the new configuration, you will use the customer's configuration designations to communicate any issues to the customer. The supplier is not at fault when a change is made halfway through. “Sorry, 15 pieces were already completed to Rev A, the remaining 15 can be made to the new Rev B print but the cost will be an additional $XX.XX.”

The small company in this example does not need to document the configuration management process; it will be easily understood and easy to prove. The idea of claiming exemption from the requirement seems more difficult than proving use of the customer's preexisting configuration management.
Agree, this is why the auditor didn't want us to ignore the configuration management in section

7.1 e) configuration management appropriate to the product.

Companies that have design and development clause:

7.3.6.1 c) the correct configuration is submitted to the test

must incorporate clause 7.1.3 and use ISO 10007 for guidance.

Thanks for the feedback:D
 

Sidney Vianna

Post Responsibly
Leader
Admin
#8
As far as configuration management goes, the small shop making items to print is using the configuration defined by the customer. The product designer is maintaining/managing the configuration and the small shop is using it.

You may say this small company is exempt from this requirement but in reality, they still care about it. If there is a B/P change to work in progress and the change is flowed down, your company will make a change to the configuration of the part. If parts in WIP have already been completed and cannot be altered to match the new configuration, you will use the customer's configuration designations to communicate any issues to the customer. The supplier is not at fault when a change is made halfway through. “Sorry, 15 pieces were already completed to Rev A, the remaining 15 can be made to the new Rev B print but the cost will be an additional $XX.XX.”

The small company in this example does not need to document the configuration management process; it will be easily understood and easy to prove. The idea of claiming exemption from the requirement seems more difficult than proving use of the customer's preexisting configuration management.
I still don't buy this. What you refer to as configuration management in , to me, is nothing more than product conformity to requirements. As I said before an ISO 9001 compliant machine shop would be required to do the same thing without having to comply with CM. Yesterday I emailed the AS9100 SDR asking for clarification on this subject since this very question about the possibility of excluding PM, RM and CM has been already asked and the answer in the 9100:2009 clarifications document is inconclusive: the first half of the answer says that the exclusions would be possible while the second half of the answer states that all organizations in the ASD sector would be expected to demonstrate some form of CM, PM & RM. :frust: . I think it is time for people offering interpretations clarifications to come off the fence.
 

dsanabria

Quite Involved in Discussions
#9
I still don't buy this. What you refer to as configuration management in , to me, is nothing more than product conformity to requirements. As I said before an ISO 9001 compliant machine shop would be required to do the same thing without having to comply with CM. Yesterday I emailed the AS9100 SDR asking for clarification on this subject since this very question about the possibility of excluding PM, RM and CM has been already asked and the answer in the 9100:2009 clarifications document is inconclusive: the first half of the answer says that the exclusions would be possible while the second half of the answer states that all organizations in the ASD sector would be expected to demonstrate some form of CM, PM & RM. :frust: . I think it is time for people offering interpretations clarifications to come off the fence.
Thank you Sidney, our third party auditor has accepted the exclusion and we will support the appeal process (if it comes to that cross road). Furthermore, there are a few ANAB auditors that might be interested in the application of those requirements.:confused:
 

dsanabria

Quite Involved in Discussions
#10
I still don't buy this. What you refer to as configuration management in , to me, is nothing more than product conformity to requirements. As I said before an ISO 9001 compliant machine shop would be required to do the same thing without having to comply with CM. Yesterday I emailed the AS9100 SDR asking for clarification on this subject since this very question about the possibility of excluding PM, RM and CM has been already asked and the answer in the 9100:2009 clarifications document is inconclusive: the first half of the answer says that the exclusions would be possible while the second half of the answer states that all organizations in the ASD sector would be expected to demonstrate some form of CM, PM & RM. :frust: . I think it is time for people offering interpretations clarifications to come off the fence.
My auditor just gave me this piece of information from the

Configuration Management Guidelines
Supply Chain Management Handbook (SCMH)

http://www.sae.org/servlets/registr...HGeneral&PAGE=getSCMHBOOK&vgenNum=115&scmhs=5

This is a brief introduction to the Configuration Management (CM) materials provided in this chapter.

Introduction:

The Aerospace Standards (e.g. 9100:2009) call for the implementation of Configuration Management (CM) and documents control throughout the entire life cycle of product realization.

Configuration Management is a discipline widely used in the acquisition of defense systems, as well as commercial products and services. A disciplined CM process ensures that products conform to their requirements and are identified and documented in sufficient detail to support the product life cycle. CM assures accurate product configuration information and enables product interchangeability and safe product operation and maintenance to be achieved.

When Configuration Management principles are applied using effective practices, return on investment is maximized and product life cycle costs are reduced. The small investment in resources necessary for effective Configuration Management is returned many folds in cost avoidance.

Instructions for use:
The chapter includes the following materials:

• Configuration Management Introductory Presentation – Executive summary intended to introduce in general terms the reasons and benefits resulting from CM process implementation.

• Configuration Management Guidelines - a presentation describing Configuration Management functions and principles and defining CM terminology for use with AS&D product line. The guidelines recommend implementation of appropriate processes and tools to establish and maintain consistency between the product and the product requirements and attributes defined in product configuration information.

• CM Process Implementation Self Assessment checklist – a detailed checklist that can be used by an organization to validate that the implemented CM process complies with customer expectations and may provide clues for CM process improvement actions.

Note: Since there is a relationship between Configuration Management and engineering changes management, it is recommended that the reader be acquainted with the Notification of Change (AAQG AS9016) guidelines and tools. Those are included in the IAQG Supply Chain Management Handbook, Chapter 8.1.

Disclaimer:
The intention of this section is to assist organizations with understanding the concept and process of SRCI management and control and is not intended to be a requirement, nor auditable.

SCMH Strategy Committee and Project Team
October 2010
 
Thread starter Similar threads Forum Replies Date
K Exclusion of 8.3 Design and Development for Design Companies ISO 9000, ISO 9001, and ISO 9004 Quality Management Systems Standards 5
rob3027 ISO 13485 justification for design and development exclusion for medical packaging ISO 13485:2016 - Medical Device Quality Management Systems 18
D Exclusion 4.2.3 Medical Device File ISO 13485:2016 - Medical Device Quality Management Systems 5
S Exclusion of chapter 7.5 production for clinical investigation ISO 13485:2016 - Medical Device Quality Management Systems 1
P Exclusion of clause 8.2.3 Reporting to regulatory authorities ISO 13485:2016 - Medical Device Quality Management Systems 7
K Can I make an exclusion of Design and Development in ISO 13485:2016 if my product is not regulated ISO 13485:2016 - Medical Device Quality Management Systems 12
Z Why Control Limits are not the same depending on type of exclusion of data points Using Minitab Software 7
optomist1 Design Exclusion, but now we might have an outsourced Product Design ISO 9000, ISO 9001, and ISO 9004 Quality Management Systems Standards 5
C IATF 16949 8.3 Exclusion - Manufacturing process design and development IATF 16949 - Automotive Quality Systems Standard 6
K Design and Development Exclusion Quality Management System (QMS) Manuals 1
V Exclusion of 'Design and Development' from scope of certification ISO 13485:2016 - Medical Device Quality Management Systems 9
P Design exclusion in AS9100D for commercial products AS9100, IAQG, NADCAP and Aerospace related Standards and Requirements 7
C 6.3Infrastructure & 6.4Work environnement & contamination control exclusion ISO 13485 ISO 13485:2016 - Medical Device Quality Management Systems 6
P Design and Development Clause ISO 9001:2015 Exclusion for Medical Services Design and Development of Products and Processes 3
H IATF 16949 Cl. 8.3 - Design and Development Exclusion Question IATF 16949 - Automotive Quality Systems Standard 4
4 Adding a new Company - ISO 9001 Design Exclusion Design and Development of Products and Processes 1
D IATF 16949 Design Exclusion Clauses which can be N/A IATF 16949 - Automotive Quality Systems Standard 7
M Exclusion of IATF 16949 Clause 4.4.1.2 - Product Safety IATF 16949 - Automotive Quality Systems Standard 2
SATHYABALARAMAN Exclusion of IATF 16949 Clauses - 8.5.5.1 & 8.5.5.2 & Justification IATF 16949 - Automotive Quality Systems Standard 9
I ISO 9001 Scope - Exclusion of Design in an engineered solutions company ISO 9000, ISO 9001, and ISO 9004 Quality Management Systems Standards 28
B AS9100 - Exclusion for 7.3 Design and Developement as we do not design AS9100, IAQG, NADCAP and Aerospace related Standards and Requirements 3
T Exclusion of 7.3 for infrastructure consulting company Service Industry Specific Topics 4
S Design and Development Procedure with Design Exclusion AS9100, IAQG, NADCAP and Aerospace related Standards and Requirements 8
A Office that only manages Contracts - Exclusion of Clause 7.3 ISO 9000, ISO 9001, and ISO 9004 Quality Management Systems Standards 6
A Can Design & Dev (7.3) Be An Exclusion For A Facilities-based Service Company? Service Industry Specific Topics 7
M TS16949 Design Exclusion when Design is done in a different Facility ISO 9000, ISO 9001, and ISO 9004 Quality Management Systems Standards 9
Crusader Service-Type Supplier Evaluation Exclusion? Supplier Quality Assurance and other Supplier Issues 12
tony s Permitted exclusion on ISO 9001 but not on ISO/TS 16949 Misc. Quality Assurance and Business Systems Related Topics 5
P ISO9001 Scope Exclusion Verification in a Design Company ISO 9000, ISO 9001, and ISO 9004 Quality Management Systems Standards 14
J Justification for Exclusion of Design and Development ISO 13485:2016 - Medical Device Quality Management Systems 8
H New Multiple Sites - Scope Change or Exclusion(s)? ISO 9000, ISO 9001, and ISO 9004 Quality Management Systems Standards 2
T ISO 9001 Clause 7 Exclusion in a Service Industry ISO 9000, ISO 9001, and ISO 9004 Quality Management Systems Standards 16
A We do not design anything brand new from scratch - Design Exclusion? ISO 9000, ISO 9001, and ISO 9004 Quality Management Systems Standards 14
J Non-Conformance for Not Taking Exclusion AS9100, IAQG, NADCAP and Aerospace related Standards and Requirements 14
M 7.5.2 Exclusion in a Contract Procurement Service Company ISO 9000, ISO 9001, and ISO 9004 Quality Management Systems Standards 1
D Consultancy company - ISO 9001 Implementation and Design Exclusion ISO 9000, ISO 9001, and ISO 9004 Quality Management Systems Standards 7
Q Exclusion to Purchasing - AS9100 Clauses 7.4.1 & 7.4.2 AS9100, IAQG, NADCAP and Aerospace related Standards and Requirements 5
N Exclusion of Medical Device Reporting of Components for Medical Systems ISO 13485:2016 - Medical Device Quality Management Systems 4
somashekar Exclusion of Design and Development Controls for Class 2B Medical Devices EU Medical Device Regulations 8
S ISO9001 Exclusion 7.6 Control of Monitoring and Measuring Equipment ISO 9000, ISO 9001, and ISO 9004 Quality Management Systems Standards 16
Y Clarification on ISO 9001 - Exclusion of Design and Development, Clause 7.3 ISO 9000, ISO 9001, and ISO 9004 Quality Management Systems Standards 4
B Permissible Exclusion for Clause 7.5.2 in a Real Estate Company ISO 9000, ISO 9001, and ISO 9004 Quality Management Systems Standards 5
armani ISO 9001 Clauses 7.5.1 and 7.5.2 - Exclusion for Design Activities ISO 9000, ISO 9001, and ISO 9004 Quality Management Systems Standards 3
B Service Provider in NC Programing and Design - Exclusion clause in AS 9100 Rev C Quality Manager and Management Related Issues 5
V Exclusion of 7.4.1 in a company that is part of a group ISO 9000, ISO 9001, and ISO 9004 Quality Management Systems Standards 4
J Justifying Exclusion of Clause 7.3 in a Service Organization. ISO 9000, ISO 9001, and ISO 9004 Quality Management Systems Standards 2
B ISO 13485 Class I Medical Device Design Exclusion ISO 13485:2016 - Medical Device Quality Management Systems 10
B Customer Property Exclusion as it applies to Personal Data ISO 9000, ISO 9001, and ISO 9004 Quality Management Systems Standards 6
J Labeling Contraindication vs. Clinical Trial Exclusion Criterion Other US Medical Device Regulations 7
B Design and Development Exclusion - ISO 9001 ISO 9000, ISO 9001, and ISO 9004 Quality Management Systems Standards 9

Similar threads